Appeal Decision
Site visit made on 4 August 2026
by Mark Harrison BA(Hons) DipTP LLM MIoL MRTPI
an Inspector appointed by the Secretary of State
Decision date: 29 September 2026
Appeal Ref: 6010795
11 Birchfield Avenue, Gildersome, Morley, Leeds LS27 7HU
• The appeal is made under section 78 of the Town and Country Planning Act 1990 (as amended)
against a refusal to grant planning permission.
• The appeal is made by Mark Chadwick against the decision of Leeds City Council.
• The application Ref is 26/01913/FU.
• The development proposed is raising the roof height forming a new floor, dormer window to rear with
juliette balcony and roof light to front.
Decision
1. The appeal is dismissed.
Application for costs
2. An application for costs has been made by the appellant against the Council. This
application is the subject of a separate decision.
Preliminary Matter
3. The revised National Planning Policy Framework (the Framework) was published
on 17 August 2026. This introduced national decision-making policies to which I
have had regard in making my decision. Given that policy relevant to this case has
remained largely unchanged I have not considered it necessary to seek further
comments from the main parties. Where the appellant’s case referred to the
previous version of the Framework, I have applied the new policy.
Main Issue
4. The main issue is the effect of the proposed development on the character and
appearance of the existing building and the surrounding area.
Reasons
5. The appeal property is a two-storey detached dwellinghouse with a single-storey
side and rear extension. It is located at the turning head of a small cul-de-sac and
neighbouring properties are broadly similar in respect of height, design and
materials. Whilst many of the properties have been extended to the sides or rear,
their roof profiles are modest and consistent.
6. The proposal would increase the ridge height and the pitch of the roof significantly
above its existing form. It would create a roof form that appears disproportionate to
neighbouring properties. The steepened pitch and increased ridge height of the
appeal property’s roof would cause harm to the streetscape by disrupting the
harmony of the existing consistent roof profile of the cul-de-sac. Whilst the appeal
Appeal Decision 6010795
2
property is not located within a conservation area or subject to any special
designations, it is nevertheless incumbent on development proposals to be well
designed and respond to the character of its setting.
7. Although at the rear and consequently largely screened from public views, the
scale of the proposed box dormer is significant, extending across nearly the full
width of the roof, and would dominate the rear roofscape. It would form an
incongruous addition, creating a bulky top-heavy appearance which would harm
the appeal property due to its lack of subservience, contrary to the requirements of
the Householder Design Guide Supplementary Planning Document (SPD) (2012).
8. The appellant has drawn my attention to a previous part-implemented planning
permission at the appeal property for a single storey side and rear extension and
alterations to roof, including raising roof height and dormer to rear. The ground
floor extension was subsequently constructed, but the permitted roof alterations
were not. This permission was validly commenced by the construction of the
ground floor extension and the unimplemented part of the scheme, the roof
alterations, therefore has the benefit of extant planning permission.
9. Given that this is an extant planning permission, I conclude that there is a greater
than theoretical possibility that it might be implemented. Therefore, this represents
a fallback position, which is a material consideration in determining this appeal.
10. Whilst the fallback position would allow for raising the roof height and a rear
dormer, there are significant differences between it and the appeal proposal.
Under the extant permission the ridge height of the roof would be raised
significantly less, resulting in a shallower pitch, and the dormer would be smaller
with a greater set in from the edges of the roof. I therefore give moderate weight to
the fallback position because of these material differences.
11. The fallback position, if constructed, would result in the roof height of the appeal
property being higher than that of neighbouring dwellings, thus disrupting the
consistent roof profile of the streetscape. However, the appeal proposal represents
a materially more dominant form of development that would be significantly more
impactful on the street scene and draw more attention to the disparity between the
roof form of the appeal property and its neighbours. In particular, the height and
steepness of the raised roof and the bulk and massing of the rear dormer.
12. Policy L2 of the Framework requires that substantial weight should be given to the
benefits where a development proposal would, amongst other things, create
additional homes or floorspace within settlements by using the airspace above
existing residential premises. However, such proposals should be consistent with
the overall street scene. In this case, I have found that the proposed development
would not be consistent with the street scene, due to the height and steepness of
the roof.
13. Whilst Class AA of the General Permitted Development Order promotes the
upward extension of dwellings, it does not represent a fallback position specifically
in relation to the appeal proposal. A condition of Class AA is that the roof pitch of
the principal part of the dwelling following the development must be the same as
the existing roof pitch. The appeal proposal would result in a significant change in
the pitch of the roof.
Appeal Decision 6010795
3
14. Despite the existence of the fallback position of the extant permission for
alterations to the roof, all proposals must be assessed on their own merits. I find
that the appeal proposal would not be consistent with the overall street scene. It
would cause harm to the character and appearance of the existing building and the
surrounding area due to the excessive ridge height of the roof and bulk of the rear
dormer.
15. Accordingly, I find conflict with Policy P10 of the Core Strategy Review, Policies
GP5 and BD6 of the Leeds Unitary Development Plan (Review 2006) and the SPD
which require, amongst other things, that new development should provide good
design appropriate to its scale and function, respecting the form, proportions,
character and appearance of the dwelling and the locality.
Conclusion
16. For the reasons given above the appeal should be dismissed.
Mark Harrison
INSPECTOR
£
Costs decision section
Costs Decision
Site visit made on 4 August 2026
by Mark Harrison BA(Hons) DipTP LLM MIoL MRTPI
an Inspector appointed by the Secretary of State
Decision date: 29 September 2026
Costs application in relation to Appeal Ref: 6010795
11 Birchfield Avenue, Gildersome, Morley, Leeds LS27 7HU
• The application is made under the Town and Country Planning Act 1990, sections 78, 322 and
Schedule 6, and the Local Government Act 1972, section 250(5).
• The application is made by Mark Chadwick for a full award of costs against Leeds City Council.
• The appeal was against the refusal of planning permission for raising the roof height forming a new
floor, dormer window to rear with juliette balcony and roof light to front.
Decision
1. The application for an award of costs is refused.
Reasons
2. Parties in planning appeals normally meet their own expenses. However, the
Planning Practice Guidance (PPG) advises that costs may be awarded against a
party who has behaved unreasonably and thereby caused the party applying for
costs to incur unnecessary or wasted expense in the appeal process.
3. The PPG sets out various examples of potentially unreasonable behaviour on the
part of a local planning authority. This can include not determining similar cases in
a consistent manner and failing to grant a further planning permission for a scheme
that is the subject of an extant or recently expired permission where there has been
no material change in circumstances.
4. The applicant contends that the Council acted unreasonably by ignoring the
fallback position established by a previous planning permission for the appeal
property and also the support for upward extensions in both the National Planning
Policy Framework (the Framework) and permitted development rights.
5. I note from the planning application documentation provided as part of the appeal
that the applicant did not make any reference to the 2013 planning permission nor
argue that a fallback position existed as part of their case at that stage. The fallback
argument was first presented as part of the appeal.
6. Whilst I would still have expected to see the fallback position created by the
unimplemented elements of the previous planning permission identified and
discussed within the Council’s Delegation Report, it does not inevitably follow that
this would have led to the granting of planning permission by the Council and
therefore avoided the need for an appeal.
7. In my appeal decision I have concluded that the fallback position and the appeal
proposal are materially different schemes. The appeal proposal would raise the
height and increase the steepness of the roof of the appeal property to a
Costs Decision 6010795
2
significantly greater extent than as permitted under the fallback position. The rear
dormer would also be significantly larger. Support in the Framework and the
permitted development right for upward extensions I did not consider represented a
fallback position in this case. The Council’s submitted rebuttal of the costs claim
sets out similar observations.
8. Consequently, the material differences that I have found between the appeal
proposal and the fallback position make it inevitable that the appeal would have
had to be made.
Conclusion
9. I therefore find that unreasonable behaviour resulting in unnecessary or wasted
expense, as defined in the PPG, has not occurred and an award of costs is not
warranted.
Mark Harrison
INSPECTOR
Expert Representation
Don't leave your appeal to chance.
Inspectors are inconsistent. We build a technical defense using precedents from our 182,000+ case archive.
No win, no fee Householder representation — you only pay if you win.