Erection of first floor side extensions to both sides, part ground floor front extension, loft conversion with front and rear dormers, roof height increase of 300mm, and associated internal alterations
📊
See the success rate & inspector analytics
Free to view — just create an account, no payment needed.
Sign Up FreeTechnical Issues Heatmap
Ecology & Biodiversity
Character & Appearance
Extensions
Inspector’s Reasoning
Appeal Decision
Site visit made on 19 August 2026
by K Reeves BA (Hons) MA MRTPI
an Inspector appointed by the Secretary of State
Decision date: 04 September 2026
Appeal Ref: 6008320
5 Somerset Way, Iver, Buckinghamshire SL0 9AG
• The appeal is made under Section 78 of the Town and Country Planning Act 1990 (as amended)
against a refusal to grant planning permission.
• The appeal is made by Mr Navpreet Johal against the decision of Buckinghamshire Council.
• The application Ref is PL/25/2749/FA.
• The development proposed is erection of first floor side extensions to both sides, part ground floor
front extension, loft conversion with front and rear dormers, roof height increase of 300mm, and
associated internal alterations.
Decision
1. The appeal is dismissed.
Preliminary Matters
2. As part of the appeal, the appellant submitted a Preliminary Roost Assessment
(PRA) prepared by Arbtech and dated 2 April 2026. The PRA has been provided to
address the Council’s second reason for refusal and is intended to supply the
ecological information that was absent at application stage. Its submission does
not alter the nature or scale of the development and therefore does not constitute
a substantive change to the scheme.
3. The submission of technical evidence at appeal is not unusual and is an accepted
part of the process, particularly where it does not amend the development itself.
The PRA provides the information intended to assess ecological impacts. I am
satisfied that accepting the PRA in determining the appeal does not prejudice the
interests of any party, and I have taken it into account in reaching my decision.
4. A revised National Planning Policy Framework was published on 17 August 2026.
While this made certain revisions to aspects of national planning policy, the
provisions in respect of the matters relied on by the main parties are materially
unchanged. Therefore, no injustice would arise if I determined the appeal on the
basis of the evidence already submitted.
Main Issues
5. The main issues are the effect of the proposed development on:
• the character and appearance of the host building and the area; and
• protected species.
Appeal Decision 6008320
2
Reasons
Character and appearance
6. The existing dwelling at No.5 is a traditional gable-fronted building whose
architectural identity remains clear despite earlier ground-floor additions. The front
gable sets the hierarchy of built form and gives the house a coherent vertical
emphasis. Its proportions, including the relationship between eaves and ridge
height and the massing of the lower elements, remain balanced, and the historic
extensions have not displaced the primacy of the original roof.
7. The proposal would significantly disrupt this composition. Replacing the main
gable with a crown roof would be a clear break from the dwelling’s established
form. The crown structure would introduce a broad, horizontal emphasis that
visually suppresses the gable’s vertical emphasis, and the raised eaves would shift
the perceived mass upward, creating a new dominant line that competes with the
original roof structure.
8. Although the first-floor side extensions are set back from the boundaries, they
would add substantial mass across the width of the plot and further emphasise the
altered proportions created by the changes to the roof form. The retained
ground-floor gabled elements would sit awkwardly beneath the new roof, with the
two forms appearing to compete rather than integrate, and the fenestration
changes would add to this lack of cohesion. Overall, the scheme would read as an
incongruent re-composition rather than a sympathetic extension, failing to respect
the established form of the dwelling. I therefore find conflict with Policy H11(a) of
the South Bucks District Local Plan (1999) (LP).
9. Somerset Way contains bungalows, chalet-style dwellings, two-storey houses and
more recent crown-roofed buildings, creating a varied street scene without a single
prevailing form. In that context, the proposed development would not appear out of
place, and its massing would sit within an environment already characterised by
differing roof profiles and building scales. Boundary gaps would be retained,
avoiding any terracing effect, and the height increase would not disturb the
established rhythm of spacing or staggered building lines. Although visually
prominent, the development would not materially harm the character and
appearance of the area and would comply with Policies EP3 and H11(c) of the LP.
10. The redevelopment at No.15 shows that crown roofs are not unfamiliar within the
street and that the architectural character of the area is evolving. However, that
scheme involved a complete replacement building and does not lessen the
requirement in Policy H11(a) for extensions to harmonise with the existing
dwelling. The acceptability of that scheme does not translate to acceptability where
integration with an established form is required. While No.15 demonstrates that
larger, contemporary forms can be absorbed within the varied street scene, it does
not overcome the appeal proposal’s failure to harmonise with the host building in
terms of scale, height, form and design, nor does it provide a precedent that
outweighs the identified policy conflict.
11. Having regard to the above, although I have found that the proposal would not
cause material harm to the character and appearance of the area, it would result in
unacceptable harm to the character and appearance of the host building.
Consequently, the proposal conflicts with Policy H11(a) of the LP, and as the
policy requires compliance with all applicable criteria, the failure to satisfy the
Appeal Decision 6008320
3
building-specific limb means the proposal conflicts with Policy H11 when taken as
a whole.
Protected species
12. The PRA records that no bat evidence was found during the inspection and that
the loft void contains no specific roosting features. It also identifies missing mortar
and loose tiles which may provide crevice access beneath the roof covering. The
report concludes that the building has low habitat value for roosting bats and
recommends one emergence or re-entry survey during the active bat season to
confirm presence or likely absence.
13. Circular 06/2005 establishes the legal framework within which planning authorities
must operate when determining applications that may affect protected species. It
states that “the presence or absence of protected species, and the extent that they
may be affected by the proposed development, should be established before
planning permission is granted,” and that surveys “should only be required where
there is a reasonable likelihood of the species being present.” As the competent
authority for the purposes of the Conservation of Habitats and Species
Regulations 2017 (the Habitats Regulations), I must be satisfied that the
development would not result in the disturbance or destruction of a European
Protected Species or its breeding site or resting place.
14. The PRA identifies low potential but does not establish likely absence. Where the
baseline survey does not confirm whether bats are present, the competent
authority cannot rule anything in or out without a seasonally timed emergence
survey. In such circumstances, the further survey is not precautionary, it is
necessary to determine whether the development would disturb or destroy a roost.
Without that survey, I cannot lawfully conclude that the proposal would not harm a
European Protected Species or that any required mitigation would be
proportionate and effective.
15. In these circumstances, the ecological information before me is insufficient to
discharge my duties under the Habitats Regulations, and the appeal cannot be
allowed unless the recommended survey has been completed and its findings are
available at determination stage. The proposal therefore conflicts with Policy CP9
of the South Bucks Core Strategy (2011), which requires development to protect
and enhance biodiversity and to demonstrate that adverse impacts on protected
species have been robustly assessed and appropriately addressed.
Other Matters
16. I recognise the appellant’s explanation that the existing first-floor arrangement is
constrained by limited headroom and inefficient circulation, and that the proposal
would deliver a more coherent and usable layout with improved proportions better
suited to modern living. I also acknowledge the potential to upgrade the building
fabric, improve insulation and enhance the overall thermal performance of the
dwelling. These are benefits of the scheme. However, the appellant has not
demonstrated that these improvements could only be achieved through the
specific form of development proposed, nor that alternative approaches would be
incapable of delivering comparable gains without generating the harm I have
identified. In the absence of such justification, the benefits attract only limited
weight and do not outweigh the identified harm or the resulting conflict with the
development plan.
Appeal Decision 6008320
4
Conclusion
17. For the reasons given above, the proposal conflicts with the development plan and
the material considerations do not indicate that the appeal should be decided other
than in accordance with it. Accordingly, the appeal should be dismissed.
K Reeves
INSPECTOR
Expert Representation
Don't leave your appeal to chance.
Inspectors are inconsistent. We build a technical defense using precedents from our 182,000+ case archive.
No win, no fee Householder representation — you only pay if you win.