Inspector’s Reasoning
Appeal Decision
Site visit made on 24 June 2026 by S Jamieson BA(Hons) MPlan MRTPI
Decision by M Russell BA (Hons) DipTP MRTPI
an Inspector appointed by the Secretary of State
Decision date: 27th August 2026
Appeal Ref: 6005269
85 Priory Road, North Cheam, Sutton SM3 8LY
• The appeal is made under section 78 of the Town and Country Planning Act 1990 (as amended)
against a refusal to grant approval required under Article 3(1) and Schedule 2, Part 1, Class A of the
Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended)
(the GPDO).
• The appeal is made by Mr K Ragupathy against the decision of the Council of the London Borough of
Sutton.
• The application Ref is DM2025/01384.
• The development proposed is 6m single storey rear extension.
Decision
1. The appeal is dismissed.
Appeal Procedure
2. The site visit was undertaken by a representative of the Inspector whose
recommendation is set out below and to which the Inspector has had regard before
deciding the appeal.
Application for costs
3. An application for an award of costs has been made by Mr K Ragupathy against
the Council of the London Borough of Sutton. This is the subject of a separate
decision.
Main Issue
4. The main issue is whether the proposed development would be granted planning
permission by Article 3, Schedule 2, Part 1, Class A of the GPDO.
Reasons for the Recommendation
5. Class A of Part 1, Schedule 2 of the GPDO sets out what constitutes ‘permitted
development’, that is, development that can be undertaken without planning
permission in terms of the ‘enlargement, improvement or other alteration of a
dwellinghouse’ subject to certain limitations and conditions.
6. Paragraph A.1(g) states that development is not permitted by Class A if the
enlarged part of the dwellinghouse would have a single storey and would extend
beyond the rear wall of the original dwellinghouse by more than 8 metres in the
case of a detached dwellinghouse, 6m in the case of any other dwellinghouses or
exceed 4m in height. In this case the dwelling is a terraced property. The proposed
rear extension would project 6m from the rear wall of the original dwellinghouse
and would be less than 4m high.
Appeal Decision 6005269
2
7. However, paragraph A.1(j)(iii) states that development is not permitted by Class A if
the enlarged part of the dwellinghouse would extend beyond a wall forming a side
elevation of the original dwelling and have a width greater than half the width of the
original dwellinghouse. Paragraph A.1(ja) advises that development is not
permitted if any total enlargement (being the enlarged part together with any
existing enlargement of the original dwellinghouse to which it will be joined)
exceeds or would exceed the limits set out in sub-paragraphs (e) to (j).
8. The parties agree that the proposal would extend the full width of the rear elevation
of the appeal property. The dispute in this case concerns whether the existing
projection to the rear of the property comprises part of the original dwelling for the
purposes of the GPDO.
9. The term ‘original’ is defined within Article 2 of the GPDO as a house as it existed
on 1st July 1948 or if built after this date, how it was originally built. No definitive
evidence has been provided regarding the construction date of either the appeal
property or the rear projection. However, both parties refer to a 1956 Ordnance
Survey map. Consistent with my observations during the site visit, the map clearly
shows a rear projection at the appeal property, together with similar projections at
adjoining properties within the terrace and elsewhere in the surrounding area.
10. The consistent form and widespread occurrence of these projections indicated on
the 1956 OS map to dwellings on Priory Road suggests that they were more than
likely part of the original design and construction of these dwellings, rather than
added individually at a later date. In the absence of persuasive evidence to the
contrary, and given the short period between 1 July 1948 and the publication of the
1956 map, I find on the balance of probabilities that the rear projection formed part
of the original dwellinghouse. Consequently, the flank wall of that projection
constitutes a side elevation of the original dwellinghouse for the purposes of Class
A.
11. There are no other rear extensions to which the proposed extension would be
joined. Nevertheless, the proposed extension would extend beyond a wall forming
a side elevation of the original dwellinghouse and would exceed half the width of
the original dwellinghouse. This is regardless of whether the rear projection would
be demolished, as the limitations are based on the original dwellinghouse and
apply even if part of the original is removed. It would therefore exceed the limits at
paragraph A.1(j)(iii), thereby also failing to comply with sub-paragraph (ja) of
Class A.
12. Consequently, the proposal would not be granted planning permission by Article 3,
Schedule 2, Part 1, Class A of the GPDO.
Other Matters
13. I acknowledge the appellant’s desire to improve the living accommodation at the
property and note that no objections were received from neighbouring occupiers. I
have also seen the appellant’s concerns regarding the Council’s handling of
previous applications and what are perceived to be inconsistencies in its decision-
making. However, these matters are not determinative in the assessment of
whether the scheme would constitute permitted development under Class A of the
GPDO.
Appeal Decision 6005269
3
14. I do not have full details of the examples of rear extensions cited by the appellant.
In any event, and regardless of the Council’s interpretation of the GPDO under
other applications, my own assessment of whether development is permitted under
Class A is a matter of the particular facts and circumstances of the case before me.
As such, the examples referred to do not provide a basis for reaching a different
conclusion in this appeal.
Conclusion and Recommendation
15. For the reasons given above, the proposed development would not be granted
planning permission by Article 3, Schedule 2, Part 1, Class A of the GPDO. I
therefore conclude that the appeal should be dismissed.
S Jamieson
APPEAL PLANNING OFFICER
Inspector’s Decision
16. I have considered all the submitted evidence and my representative’s report and on
that basis the appeal is dismissed.
M Russell
INSPECTOR
£
Costs decision section
Costs Decision
Site visit made on 24 June 2026 by S Jamieson BA(Hons) MPlan MRTPI
Decision by M Russell BA (Hons) DipTP MRTPI
an Inspector appointed by the Secretary of State
Decision date:
Costs application in relation to Appeal Ref: 6005269
85 Priory Road, North Cheam, Sutton SM3 8LY
• The application is made under the Town and Country Planning Act 1990, sections 78, 322 and
Schedule 6, and the Local Government Act 1972, section 250(5).
• The application is made by K Ragupathy for a full award of costs against the Council of the London
Borough of Sutton.
• The appeal was against the Council’s refusal to grant approval required under Article 3(1) and
Schedule 2, Part 1, Class A of the Town and Country Planning (General Permitted Development)
(England) Order 2015 (as amended) (the GPDO) for a 6m single storey rear extension.
Decision
1. The application for an award of costs is refused.
Appeal Procedure
2. An Appeal Planning Officer has set out the recommendation below, to which the
Inspector has had regard before deciding the application.
Reasons
3. Parties in planning appeals normally meet their own costs. However, the Planning
Practice Guidance (PPG) advises that an award of costs may be made where a
party has behaved unreasonably and that unreasonable behaviour has directly
caused another party to incur unnecessary or wasted expense in the appeal
process.
4. The applicant contends that the Council acted unreasonably by refusing
applications on spurious grounds, resulting in unnecessary delay and wasted
expense through the submission of multiple applications and a subsequent appeal.
The applicant also suggests that the Council has been inconsistent in its
decision-making, both in relation to previous applications at the appeal site and to
other developments approved within the surrounding area.
5. The evidence indicates that the applicant submitted three prior approval
applications for single storey rear projections to the appeal dwelling. While
decisions under Article 3(1) and Schedule 2, Part 1, Class A of the GPDO are
dependent on the particular facts and circumstances of each case, the proposals
appear broadly comparable, particularly in respect of the depth and width of the
proposed extension.
6. In determining the first application, the Council's officer report concluded that the
proposal complied with the relevant limitations and conditions of Class A, and the
application was refused on neighbouring amenity grounds. Despite this, the Council
subsequently relied upon non-compliance with those provisions as a reason for
Costs Decision 6005269
2
refusing a later, substantially similar proposal. This raises concerns regarding the
consistency of the Council's approach and suggests shortcomings in its
assessment of the scheme. This would amount to unreasonable behaviour.
7. Nevertheless, for an award of costs to be justified, unreasonable behaviour must
have resulted in unnecessary or wasted expense in the appeal process itself. The
applicant may well have incurred additional costs in preparing and submitting
further prior approval applications. However, costs associated with the application
process, including the submission of previous applications, do not fall within the
scope of the appeal costs regime and are therefore not recoverable through an
award of costs.
8. In relation to the allegation of wider inconsistency, I have not been provided with full
details of the other developments cited by the applicant. In any event, the prior
approval process requires an assessment of the particular circumstances of each
site and proposal. Accordingly, the existence of other approved extensions does
not, in itself, demonstrate that the Council acted unreasonably in reaching its
decision in this case.
9. With regards to the separate planning application made by the appellant for a rear
extension, this is not comparable to the assessment of a scheme under the
conditions and limitations of the GPDO.
10. For the reasons given in the appeal decision, I agree with the Council’s reason for
refusal on the planning application that led to the appeal. In these circumstances,
while aspects of the Council's handling of earlier applications may give rise to
concern, I am not satisfied that the Council's behaviour in refusing that application
and defending the appeal was unreasonable, nor that it caused the applicant to
incur unnecessary or wasted expense in the appeal process. Therefore, an award
of costs is not justified.
S Jamieson
APPEAL PLANNING OFFICER
Inspector’s Decision
11. I have considered all the submitted evidence and the Appeal Planning Officer’s
report and on that basis the application for an award of costs is refused.
M Russell
INSPECTOR
Expert Representation
Don't leave your appeal to chance.
Inspectors are inconsistent. We build a technical defense using precedents from our 182,000+ case archive.
No win, no fee Householder representation — you only pay if you win.