Erection of a loft conversion including rear dormer roof extension and outrigger extension
📊
See the success rate & inspector analytics
Free to view — just create an account, no payment needed.
Sign Up FreeTechnical Issues Heatmap
Extensions
Character & Appearance
Fallback Position
Inspector’s Reasoning
Appeal Decision
Site visit made on 18 March 2026
by John D Allan BA(Hons) BTP MRTPI
an Inspector appointed by the Secretary of State
Decision date: 30 March 2026
Appeal Ref: 6004467
24 Malvern Road, Hampton, Richmond upon Thames, TW12 2LN
• The appeal is made under section 78 of the Town and Country Planning Act 1990 (as amended)
against a refusal to grant planning permission.
• The appeal is made by Mr Guido Pellizzaro against the decision of the Council of the London
Borough of Richmond upon Thames.
• The application Ref is PA25/4132.
• The development proposed is the erection of a loft conversion including rear dormer roof extension
and outrigger extension.
Decision
1. The appeal is allowed and planning permission is granted for the erection of a loft
conversion including rear dormer roof extension and outrigger extension at 24
Malvern Road, Hampton, Richmond upon Thames, TW12 2LN in accordance with
the terms of the application, Ref PA25/4132, subject to the following conditions:
1) The development hereby permitted shall begin not later than 3 years from the
date of this decision.
2) The development hereby permitted shall be carried out in accordance with
the approved plans: Drg Nos EX(01)00 Rev A, EX(01)01 Rev A, EX(01)02
Rev A, EX(03)01 Rev A, EX(03)02 Rev A, PL(01)01 Rev A, PL(01)02 Rev A,
PL(03)01 Rev B and PL(03)02 Rev B.
3) The materials to be used in the construction of the external surfaces of the
development hereby permitted shall match those used in the existing
building.
4) The development hereby permitted shall be carried out and thereafter
maintained in accordance with the Fire Safety Strategy dated November
2025.
Application for Costs
2. An application for costs was made by Mr Guido Pellizzaro against the Council of
the London Borough of Richmond upon Thames. This is the subject of a separate
decision.
Main Issue
3. The main issue is the effects of the proposal upon the character and appearance of
the appeal property and wider area.
Appeal Decision 6004467
2
Reasons
4. The appeal relates to a mid-terraced, two-storey dwelling with a rear outrigger
within a residential neighbourhood comprising properties of similar type and age.
The proposal is for a loft conversion that would involve the erection of an ‘L-shaped’
dormer extension across the original rear roof slope and over the outrigger with two
roof lights to the front elevation.
5. The Council’s House Extensions and External Alterations Supplementary Planning
Document (SPD) was adopted in May 2015. In relation to roof extensions, it
advises that, amongst other things, they should be ‘in-scale’ with the existing
structure and should not dominate the existing roof, and that dormers should have
windows smaller than that of windows to the floor below.
6. During my visit, I observed that ‘L-shaped’ dormer window extensions were not
uncommon to the rear elevations of other properties along this side of Malvern
Road. Between them these were of varying sizes and forms and included a variety
of window openings in terms of sizes and positions. Moreover, the Council has
confirmed that a Certificate of Lawful Use or Development (LDC) was previously
issued for works at the appeal property described as ‘Loft conversion including rear
dormer roof extension and outrigger extension’ (Ref PA25/2945). The difference
between the works that have been accepted as permitted development and the
appeal proposal amount solely to the position and shape of the window proposed to
be installed upon the rear face of the extension over the outrigger.
7. Whilst the proposed roof extension would undeniably dominate the existing
roofscape and dwelling as a whole, in conflict with the SPD’s guidance, the
appellant has a legitimate fallback position with a very realistic prospect of
implementation whereby a similar roof extension in terms of size and position could
be constructed. This is a material consideration to which I attach significant weight.
8. With this in mind, and having regard also to the innumerable roof extensions in the
vicinity, which have resulted in a markedly evolved roofscape to the rear elevations
of the terraces along Malvern Road, I am not persuaded that the siting, scale or
bulk of the proposal would appear harmful to the character or appearance of the
dwelling or incongruous within the context of its rear garden setting.
9. The proposed triangular window to the rear elevation and set within the side cheek
of the extension over the outrigger would be unquestionably larger than the
windows to the property’s fenestration pattern below, and of different style. In this
regard there would be some further conflict with guidance contained within the
SPD. However, by following the profile of the dormer’s cheek and reflecting the
shape and proportions of the façade within which it would be inserted, the window
would represent a well-considered contemporary approach that in my judgement
would be neither incongruous nor harmful within a context where the glazing
patterns at an elevated level to the rear of properties in the vicinity have evolved
with little consistency or cohesion.
10. Overall, notwithstanding any conflict with the SPD, I am satisfied that there would
be no harm to the character or appearance of No 24 or the wider area. As such,
there would be no conflict with Policy 28 of the Richmond upon Thames Local Plan
(2024 to 2039), adopted in 2025, as far as it seeks to ensure development is
compatible with local character. For the same reasons there would be no conflict
Appeal Decision 6004467
3
with the National Planning Policy Framework’s policy requirements for achieving
well-designed places.
Conditions
11. In addition to the standard time limit condition, a condition requiring the
development to be carried out in accordance with the approved plans is necessary
for the avoidance of doubt and in the interests of proper planning. A further
condition is necessary to ensure that the development is carried out in materials to
match the existing in order to safeguard the character and appearance of the area.
I have also included the Council’s further suggested condition requiring the
development to be carried out and maintained in accordance with the submitted
Fire Statement in the interests of safety.
Conclusion
12. For the reasons given above, the appeal is allowed.
John D Allan
INSPECTOR
Expert Representation
Don't leave your appeal to chance.
Inspectors are inconsistent. We build a technical defense using precedents from our 182,000+ case archive.
No win, no fee Householder representation — you only pay if you win.