← Back to Archive

Installation of a Battery Energy Storage Facility, substation, underground cabling, access, landscaping and ancillary infrastructure & equipment to include water tower, security fence, acoustic fence & gates

📊

Borough Success Rate

In Walsall Metropolitan Borough Council, approx 50.0% of Other Major Developments appeals are successful. (Sample: 4 cases).

Planzo Professional Representation

Technical Appeal Representation

This Other Major Developments case requires a bespoke technical strategy. Contact us for a fixed-fee quotation.

Book Free Review How it works →

Technical Issues Heatmap

Green Belt Character and Appearance Privacy
Keyword Heatmap Locked

Instant scan of technical battlegrounds available with a Day Pass.

Inspector Profile: Gethin T

Archive Data: 9 Decisions
Allowance Rate (Other Major Developments)
88.9% ↑ High
National Average (Other Major Developments)
43.4%

Inspector's Analysis

https://www.gov.uk/planning-inspectorate Appeal Decision Site visit made on 16 March 2026 by T Gethin BA (Hons), MSc, MRTPI an Inspector appointed by the Secretary of State Decision date: 31 March 2026 Appeal Ref: 6001998 Land at Six Towers Road, Walsall WS2 8XA • The appeal is made under section 78 of the Town and Country Planning Act 1990 (as amended) against a refusal to gra…

Full Analysis Locked

Unlock full text, site maps, and the evidence-ready PDF.

Unlock Case (£10)