← Back to Archive

Residential development of up to 950 dwellings (to be delivered in a phased and severable manner), provision of a mixed-use local centre (including Class E, F and C3 with potential for retirement homes) provision of land to accommodate a new primary school, replacement sports pitches with changing facilities; associated green infrastructure including landscaping, public open space, allotments, sustainable urban drainage systems, biodiversity enhancements;

📊

Borough Success Rate

In Tonbridge and Malling Borough Council, approx 46.4% of Major dwellings appeals are successful. (Sample: 28 cases).

Planzo Professional Representation

Technical Appeal Representation

This Major dwellings case requires a bespoke technical strategy. Contact us for a fixed-fee quotation.

Book Free Review How it works →

Technical Issues Heatmap

Green Belt Character and Appearance Privacy
Keyword Heatmap Locked

Instant scan of technical battlegrounds available with a Day Pass.

Inspector Profile: Board D

Archive Data: 36 Decisions
Allowance Rate (Major dwellings)
36.1% ↓ Strict
National Average (Major dwellings)
41.1%

Inspector's Analysis

https://www.gov.uk/planning-inspectorate Appeal Decision Inquiry held on 17 & 18 October 2023 Site visit made on 16, 18 & 19 October 2023 by D J Board BSc (Hons) MA MRTPI an Inspector appointed by the Secretary of State Decision date: 12th December 2023 Appeal Ref: APP/H2265/W/23/3321880 Land at Eccles, East and West of Bull Lane, Eccles • The appeal is made under section 78 of …

Full Analysis Locked

Unlock full text, site maps, and the evidence-ready PDF.

Unlock Case (£10)