Appeal Decision
Site visit made on 14 August 2023
by Andrew Dale BA (Hons) MA MRTPI
an Inspector appointed by the Secretary of State
Decision date: 6 September 2023
Appeal Ref. APP/N5090/D/23/3320473
40 Corringham Road, London NW11 7BU
• The appeal is made under section 78 of the Town and Country Planning Act 1990
against a refusal to grant planning permission.
• The appeal is made by Mr Thomas Levinson against the decision of the Council of the
London Borough of Barnet.
• The application ref. 21/6722/HSE, dated 22 December 2021, was refused by notice
dated 13 March 2023.
• The development proposed is “Proposed basement under existing building and rear
patio – with light-well to front elevation”.
Decision
1. The appeal is allowed and planning permission is granted for proposed
basement under existing building and rear patio – with light-well to front
elevation at 40 Corringham Road, London NW11 7BU in accordance with the
terms of the application ref. 21/6722/HSE, dated 22 December 2021, subject
to the conditions contained in the Schedule at the end of this Appeal Decision.
Preliminary matters
2. An application for a full award of costs has been made by Mr Thomas Levinson
against the Council of the London Borough of Barnet. This application will be
the subject of a separate decision.
3. The plan (drawing no. 2334-200.1) showing the proposed ground and
basement floor layouts was updated during the processing of the application. I
have taken revision D, dated 22 September 2022, into account as this shows
the rear garden, rear paving and rear patio/raised terrace to remain as existing
which would align with the additional comments made by the agent on
drainage matters on 28 November 2022 in response to the Barnet/Capita
comments of 17 August 2022. To be consistent, I have had regard to the other
drawings of the same date, namely drawing nos 2334-201.1 Rev. B (Proposed
Section AA) and 2334-202.1 Rev. B (Proposed Front & Rear Elevations).
4. The exceptionally fine oak tree behind the appeal property is not accurately
recorded on drawing no. 2334-300. The oak tree is actually in another garden
a little further away from where it is shown on that drawing. Still, the
temporary tree protection fencing, in terms of its siting and specification
details, shown on drawing no. 2334-300 remains appropriate.
Appeal Decision APP/N5090/D/23/3320473
2
Main issue
5. Flowing from the sole reason for refusal, the main issue is the impact of the
proposed single floor basement upon the character and appearance of the host
dwelling and the wider locality.
Reasons
6. Located on the south side of Corringham Road and paired with no. 42, the
appeal property is a semi-detached house of 2 full storeys with further rooms
in the roof space and a store room in a small basement under the rear raised
terrace. Standing on a rectangular-shaped plot which slopes away from the
house at the rear, its scale, design and architectural quality are fairly typical of
the houses in the local residential area along this part of Corringham Road.
7. It is apparent from the site history and from what I saw on my visit that the
appeal property has been previously enlarged with a part single, part 2-storey
rear extension including a terrace with a balustrade and steps and with a
sizeable rear dormer window to facilitate a loft conversion or second floor.
8. The Council said that the proposed development, by reason of its excessive
size and scale, when considered cumulatively with existing extensions to the
property, would represent an overdevelopment of the site which would be
detrimental to the character and appearance of the property and wider locality.
9. The Council’s Supplementary Planning Document: Residential Design Guidance
October 2016 (SPD) is referred to by the parties. I have had particular regard
to paragraphs 14.42 to 14.45 which deal with basement extensions and to
paragraphs 14.2 and 14.3 which refer to the cumulative effect of extensions.
The SPD clearly carries weight as a material consideration in decision making
but it contains recommendations as opposed to planning policy and should not
be applied prescriptively to the exclusion of all other factors, including the
physical circumstances and context of a site.
10. Whether any scheme would lead to an overdevelopment of a site would be a
matter of fact and degree in each particular case. Given the wording of the
reason for refusal, it seems to me that some external manifestation of a
notable change in scale and size in relation to the site and its surroundings
should be apparent to viewers.
11. The proposed basement, adding a further stated 134 sq. m of floor space onto
the floor space of the earlier extensions, would result in the house being over
2.5 times larger than the original building. However, relying solely on increases
to the gross internal area compared to the original or existing house would be
unwise where basement extensions are being proposed. This is because the
floor areas so created are substantially concealed beneath the existing house,
as in the appeal case and the percentage increase in floor space arising from
any proposal for a full basement is, by definition, always likely to be significant.
12. The SPD states that the Council will normally allow single floor basement
extensions which do not project further than 3 m from the rear wall of the
house or more than half its width beyond each side elevation and do not
require the removal of more than 50% of the outdoor amenity space. The rear
of the basement would project no further back than the current rear wall
Appeal Decision APP/N5090/D/23/3320473
3
enclosing the store room in the small basement under the rear raised terrace
which is an integral part of the existing overall built structure and an entirely
logical place for the end of the proposed deeper basement. There would no
lateral extension beyond the sides of the house and no obvious areas of
exposed sunken garden next to the basement rooms. Only a nominal amount
of amenity space would be taken up for the front light-well. Ample rear garden
space, as existing, would remain available both in functional and visual terms.
13. The SPD says any exposed area of basement should be subordinate to the
property and respect its original design and proportions. The basement’s front
bay window would respect the design of the original 2-storey bay above. The
single front light-well would be relatively small, sited well back from the road
and secured by a grille which would sit flush with the natural ground level. The
plans show planting around the light-well which would be desirable but not
absolutely necessary given that it would be a sufficiently modest intervention in
itself. The glazed panels at the rear of the basement would roughly align with,
but not be as tall as, the folding lounge doors above. The scheme would also
bring about the squaring up of the rear raised terrace and a straighter
alignment to the steps at the side. Such minor changes to the rear elevation,
which is not open to any clear public views, would respect the building’s
established architectural character and its surroundings.
14. The appellant and the Planning Officer’s Report (POR) point to planning
permissions for basement extensions at nos 42 and 46. These may be smaller
than the basement proposed but it is a telling point that the POR explained how
the resulting rear elevation would have a similar appearance to that of no. 42.
Moreover, no. 42 has above-ground extensions on 3 levels at the rear that are
almost identical to those at no. 40, except the ground and first floor extensions
at that neighbouring property project further back than their counterparts at
no. 40 by about 0.5 m. I did not identify any other light-wells along this road
except at no. 2, which appears to be divided into flats, where there are 2 light-
wells secured by railings which are quite noticeable in the street scene. The
proposed light-well and grille at the front of no. 40 would be not nearly as
visible by comparison.
15. The change in the property’s scale and size in relation to the site and its
surroundings would be within tolerable limits and would not be readily apparent
to viewers. The proposed basement would not amount to an oversized addition
and would not by itself, or in combination with the earlier rear extensions, lead
to the overdevelopment of the site. Rather, I consider that the proposed
building works, viewed as a whole, would represent a visually acceptable
solution, exhibit a high standard of design, be sufficiently complementary and
sympathetic to the already extended parent building and be respectful of the
established street scene along Corringham Road. The visual harmony of the
group of buildings on this street would not be seriously disturbed. The scheme
would also pay sufficient regard to the advice in the Council’s SPD.
16. I find on the main issue that the proposed development would preserve the
character and appearance of the host dwelling and the wider locality. It would
therefore comply with Policy D3 of the London Plan 2021, Policies CS1 and CS5
of Barnet’s Local Plan Core Strategy 2012 and Policy DM01 of Barnet’s Local
Plan Development Management Policies 2012. Those policies, amongst other
things, seek to ensure development respects local context and distinctive local
Appeal Decision APP/N5090/D/23/3320473
4
character by creating places and buildings of high quality design and respects
the appearance, scale, mass, height and pattern of surrounding buildings,
spaces and streets. They are consistent with the National Planning Policy
Framework insofar as it relates to achieving well-designed places.
Other material considerations
17. The proposal provoked wide ranging responses from over 20 local residents
who also commissioned a report from a firm of hydrogeologists and
environmental consultants (H Fraser Consulting Limited) which reviewed the
application.
18. I see no reason to depart from the how the POR (at section 5.4) considered
these responses. I would add the following on the most relevant matters.
19. The protection of the oak tree, which is well over 20 m away from the
construction zone, could be secured by a planning condition.
20. The plans show that the basement would be used for ancillary residential
purposes as a gym, games room, stores and utility room. There is no proposal
for a second dwelling or flats. The scheme will enhance the quality of life for
the occupiers of no. 40 by providing additional ancillary accommodation and
space in a family home. This is a further factor that weighs in favour of
granting planning permission.
21. The safe development of the site ultimately rests with the appellant and any
appointed building contractors who must have regard to the Party Wall Act and
the Building Regulations.
22. The potential of the scheme to increase flood risk is clearly of great importance
to local residents. Given the location of the site within the Golders Green
Critical Drainage Area and upslope from residential properties in Middleton
Road that are at high risk from surface water flooding, the Council was justified
in seeking further information in line with the conclusion of the report by H
Fraser Consulting Limited. The appellant commissioned and submitted a flood
risk assessment and drainage strategy, a basement impact assessment and
other supporting material. This information was scrutinized by the Council’s
Surface Water Management Team who raised no objections on the grounds of
surface water flooding and drainage and groundwater management. The
Council acts as the Lead Local Flood Authority. I find no reason to dispute the
Council’s finding on these matters.
Conditions
23. I have considered the conditions suggested by the Council in the POR which the
appellant will be familiar with. In addition to a condition setting a time limit for
the commencement of work, a condition requiring that the development is
carried out in accordance with the relevant approved drawings and documents
is necessary as this provides certainty. A condition requiring the use of
matching external materials is imposed to ensure that the development
preserves the character and appearance of the building and the area.
24. I have included the suggested conditions relating to the implementation of a
Demolition and Construction Management and Logistics Plan, privacy screens
along the depth of the raised patio/terrace on the side facing no. 38 and the
Appeal Decision APP/N5090/D/23/3320473
5
permitted hours for construction work, all in the interests of safeguarding the
amenity and living conditions of nearby residents. Protection of existing trees,
in accordance with drawing no. 2334-300, is also necessary in the interests of
biodiversity and visual amenity.
25. To minimize the risk of flooding, I have also added the Council’s suggested
condition covering the implementation of the mitigation and management
proposals in the relevant technical reports.
26. It is not necessary to impose a condition which seeks to prevent the basement
being occupied as a separate unit or dwelling because subdivision of the
property into more than one dwelling would first require a separate planning
application which would be determined by the Council in the first instance.
Conclusion
27. For the reasons given above and having regard to all other matters raised, I
conclude that this appeal should be allowed subject to the conditions below.
Andrew Dale
INSPECTOR
Schedule of Planning Conditions
1) The development hereby permitted shall be carried out in accordance with the
following approved plans and documents: 2334-500; 2334-501; 2334-100;
2334-101; 2334-102; 2334-103; 2334-200.1 Rev. D; 2334-201.1 Rev. B;
2334-202.1 Rev. B; 2334-300; Design and Access Statement + Heritage
Statement dated 22.12.21; Delta MS500 Specifications; Delta-MS 20
Specifications; Delta Dual Sump V3 Installation Instructions and Technical Details;
Delta Foul Retrofit Sump V3 Installation Instructions and Technical Details;
Basement Impact Assessment REV 1 Nov 2022 by CGL REF CGE/16902 REV 1;
Flood Risk Assessment and Sustainable Drainage Strategy REF 2355-FRA-DS-1-B
REV B Issue Date 16 Nov 2022; PPS Specifications; and 2355-220801-PDG dated
1 Aug 2022 re existing and proposed drainage.
2) The development hereby permitted shall begin not later than 3 years from the date
of this decision.
3) The materials to be used in the construction of the external surfaces of the
development hereby permitted shall match those of the existing building.
4) No development or works shall take place on site until a Demolition and
Construction Management and Logistics Plan (DCMLP) has been submitted to and
approved in writing by the Local Planning Authority. The DCMLP submitted shall
include, but not be limited to, the following:
Appeal Decision APP/N5090/D/23/3320473
6
i. details of the routing of construction vehicles to and from the site, hours of
access, access and egress arrangements within the site and security procedures;
ii. site preparation and construction stages of the development;
iii. details of provisions for recycling of materials and the provision on site of a
storage/delivery area for all plant, site huts, site facilities and materials;
iv. details showing how all vehicles associated with the construction works are to
be properly washed and cleaned to prevent the passage to mud and dirt onto the
adjoining highway;
v. the methods to be used and the measures to be undertaken to control the
emission of dust, noise and vibration arising from construction works;
vi. a suitable and efficient means of suppressing dust, including the adequate
containment of stored or accumulated material so as to prevent it becoming
airborne at any time and giving rise to nuisance;
vii. noise mitigation measures for all plant and processors;
viii. details of the contractors compound and car parking arrangements;
ix. details of interim car parking management arrangements for the duration of
construction; and
x. details of a community liaison contact for the duration of all works associated
with the development.
The development shall thereafter be implemented in accordance with the
measures detailed within the DCMLP.
5) Before the basement hereby approved is first occupied, details of a privacy
screen to be installed along the side of the raised terrace/patio facing 38
Corringham Road shall be submitted to and approved in writing by the Local
Planning Authority. The privacy screen shall be fitted in accordance with the
approved details before the basement is first occupied and retained as such
thereafter.
6) No construction work resulting from the planning permission shall be carried out
on the premises at any time on Sundays, Bank or Public Holidays, before 8.00 am
or after 1.00 pm on Saturdays, or before 8.00 am or after 6.00 pm on other days.
7) No site works or development (including any temporary enabling works, site
clearance and demolition) shall take place until the scheme of temporary tree
protection fencing has been erected in accordance with the siting and fencing
specification details shown on drawing 2334-300. This protection shall remain in
position until after the development works are completed and no material or soil
shall be stored within the fenced area at any time.
8) The development hereby approved shall be implemented in accordance with the
mitigation and management proposals, including monitoring strategy, as detailed
within the Basement Impact Assessment REV 1 Nov 2022 by CGL REF CGE/16902
REV 1 and the Flood Risk Assessment and Sustainable Drainage Strategy
REF 2355-FRA-DS-1-B REV B Issue Date 16 Nov 2022.
End of Schedule
£
Costs decision section
Costs Decision
Site visit made on 14 August 2023
by Andrew Dale BA (Hons) MA MRTPI
an Inspector appointed by the Secretary of State
Decision date: 6 September 2023
Costs application in relation to appeal ref. APP/N5090/D/23/3320473
Land at 40 Corringham Road, London NW11 7BU
• The application is made under the Town and Country Planning Act 1990, sections 78,
322 and Schedule 6, and the Local Government Act 1972, section 250(5).
• The application is made by Mr Thomas Levinson for a full award of costs against the
Council of the London Borough of Barnet.
• The appeal was made against the refusal of planning permission for “Proposed
basement under existing building and rear patio – with light-well to front elevation”.
Costs decision
1. The application for a full award of costs is refused.
Reasons for the costs decision
2. The Government’s Planning Practice Guidance (the Guidance) advises that all
parties in appeals are expected to behave reasonably to support an efficient
and timely process and that where a party has behaved unreasonably, and this
has directly caused another party to incur unnecessary or wasted expense in
the appeal process, they may be subject to an award of costs.
3. This application for costs has been considered on its merits in the light of the
costs advice found within the Guidance, the appeal papers, the costs
correspondence and all the relevant circumstances relating to the planning
application and the appeal. The parties are also referred to my appeal decision.
4. The costs application appears to be made on both a procedural basis and a
substantive basis. The gist of the procedural case is centred on the very
protracted nature of the planning process which included various technical
reports having to be submitted and other issues addressed as a result of the
Council allegedly giving undue weight to the concerns of objectors. The
substantive case made derives from the decision of the Planning Committee,
taken contrary to the officer’s professional advice, to refuse planning
permission on the grounds of cumulative overdevelopment, after the
intervention of the Council’s Legal Officer. It is said that the Council refused
planning permission without any logical, policy or technical reason.
5. That the Council took well over a year to determine this householder planning
application would undoubtedly be a source of frustration for the appellant.
However, the appellant had the right of appeal against non-determination of
the application within the relevant time limit, which would have been well
before the submission of the report by H Fraser Consulting Limited in June
2022. This was not exercised. If the appeal had been against non-
determination, the onus would have been on the Council to explain their
Costs Decision APP/N5090/D/23/3320473
2
reasons for not reaching a timely decision, and why permission would not have
been granted had the application been determined within the relevant period.
6. Whilst I cannot speculate on the timing of the submission of the report by H
Fraser Consulting Limited, it raised concerns about drainage, neighbouring
ground water conditions and flood risk which are material planning
considerations. The knowledge and experiences of local residents confirmed
these concerns. I found that the Council was justified in seeking the submission
of further information. This request was also evidently in accordance with the
Council’s Supplementary Planning Document: Sustainable Design and
Construction. If the absence of a flood risk assessment and drainage strategy,
a basement impact assessment and other supporting material had persisted, it
may have led to another reason for refusal. The submission of the further
information inevitably took time as did its scrutiny by the Council’s Surface
Water Management Team. I am not aware of any information the Council has
provided which has been shown to be manifestly inaccurate or untrue. The
Council exercised its duty to determine the planning application in a reasonable
manner. There is no procedural basis for an award of costs.
7. In my experience, the Legal Officer at the Planning Committee on 21 February
2023 did not make an astonishing intervention. He simply offered sound advice
to the Members that any reason for refusal must be defensible, after they had
declined to accept the officer’s recommendation of approval. It is well
established that the issues of character and appearance, as set out in the
reason for refusal, involve matters of judgement. As well as listening to the
verbal representations from 2 local residents and the appellant’s agent, who all
focussed on the matter of flood risk, the Members had visited the site and had
access to the officer’s report and slide presentation and the written objections
lodged by local residents. They were entitled to reach a different conclusion
from their officers, providing there were reasonable grounds for doing so.
8. The Council’s reason for refusing planning permission did not lack logic,
substance or objectivity. It was supported by relevant development plan
policies and the Supplementary Planning Document: Residential Design
Guidance. Even though I did not take on board the reason for refusal, this was
very much on balance on the face of the evidence before me, including my
observations on site. The Council’s approach to the available facts did not fully
match any of the types of behaviour listed in the Guidance that may give rise
to a substantive award against a local planning authority. There is no
substantive basis for an award of costs.
9. This application for costs falls short of demonstrating that unreasonable
behaviour resulting in unnecessary or wasted expense, as described in the
Guidance, has occurred. An award of costs is not therefore justified.
Andrew Dale
INSPECTOR
Expert Representation
Don't leave your appeal to chance.
Inspectors are inconsistent. We build a technical defense using precedents from our 182,000+ case archive.
No win, no fee Householder representation — you only pay if you win.