Appeal Decision
Site visit made on 12 May 2023
by G Powys Jones MSc FRTPI
an Inspector appointed by the Secretary of State for Communities and Local Government
Decision date:13 June 2023
Appeal Ref: APP/L5810/D/22/3311260
95 High Street, Hampton Wick, Kingston Upon Thames, KT1 4DG
• The appeal is made under section 78 of the Town and Country Planning Act 1990 against a
refusal to grant planning permission.
• The appeal is made by Mr Ian Bayliss against the decision of the Council of the London
Borough of Richmond Upon Thames.
• The application Ref 22/2013/HOT, dated 23 June 2022, was refused by notice dated
2 September 2022.
• The development proposed is the erection of extensions to provide a two-storey side/rear
extension, a single storey rear extension, expansion of existing basement including new
lightwell, replacement windows, new entrance to front elevation, new front boundary
treatment, bin/cycle stores and new patio.
Decision
1. The appeal is allowed and planning permission is granted for the erection of
extensions to provide a two-storey side/rear extension, a single storey rear
extension, expansion of existing basement including new lightwell, replacement
windows, new entrance to front elevation, new front boundary treatment,
bin/cycle stores and new patio at 95 High Street, Hampton Wick, Kingston
Upon Thames, KT1 4DG in accordance with the terms of the application Ref
22/2013/HOT dated 23 June 2022, subject to the conditions set out in the
attached Schedule.
Preliminary and procedural matters
2. The appeal property is sited within the Hampton Wick Conservation Area (CA).
It is also designated as a Building of Townscape Merit (BTM), a locally listed
building. The Council’s SPD1 explains that these are buildings that may not
possess sufficient interest to warrant statutory listing, but ‘are of significance to
the history and character of the environment’. It is a heritage asset in the
terms of the Framework2, albeit non-designated.
3. The officer report dealt in some detail with several issues and the proposal was
assessed with regard to neighbouring amenity, trees, local basement policy,
flooding and fire safety. The Council found no objection on any of these
counts, and I have no reason to disagree with the Council assessment on these
matters.
1 Buildings of Townscape Merit, Supplementary Planning Document 2015
2 Glossary - The National Planning Policy Framework
Appeal Decision APP/L5810/D/22/3311260
2
4. Notwithstanding the original arrangements I carried out my visit on an
unaccompanied basis. In this respect the front gate was open, and I could gain
access to the rear garden along the side of the house, which was empty when I
called. Otherwise, I assessed the proposal from local vantage points, from
points along the High Street, the Hampton Wick station forecourt, Vicarage
Road and from the pedestrian access to Hesley Cottages to the rear of the
appeal site.
Main Issues
5. The main issues are the effects of the proposals on the character and
appearance of the host property and whether the proposal would serve to
preserve or enhance the character and appearance of the CA.
Reasons
Character and appearance
6. The property is a semi-detached early 19th century dwelling which, according to
the Council, appears to have been originally designed with its attached partner
(No 93) to be perceived as a single villa. That may have been the case, but
the dwelling is now clearly perceived as semi-detached, not least because of
the extensive changes carried out to the front elevation of No 93. There, bow
windows have been introduced at ground and lower ground levels replacing
what I assume to have been matching sashed windows. A projecting plate has
also been inserted which accentuates the separation between the ground and
first floors.
7. The Council acknowledges that the property is in a rundown, dilapidated
condition, and to assist with its restoration permitted a scheme in 20223 which,
although involving alterations and extensions, is considered less harmful than
that proposed now. That scheme was approved following negotiations to
reduce the scale of the extensions initially sought – the Council feel that the
appeal scheme reverts almost to the scheme previously considered
unacceptable.
8. The Council’s concerns relate principally to the two storey addition proposed at
the side and rear, which the Council says will ‘greatly affect the important
symmetry of the villa pair’. Concern is also expressed at the proposed raised
entrance, and the rear extension on account of its width. Taken as a whole,
the Council considers that the proposals if built would appear bulky and
dominant, ‘diluting what remains of the symmetry of the pair’, thus harming
the character and appearance of the BTM and the wider CA.
9. As noted above, the villa’s original symmetry at the front has been materially
affected by the changes made to the front elevation of No 93. The scheme
approved in 2022, if built, would also impinge on what remained of the pair’s
symmetry. Having so commented, I do not hold the permission issued by the
Council in 2022 against it, since to me it represents a genuine attempt to assist
in bringing new life to a building badly in need of it. However, it represents
what could be built should the appellant choose to, since the permission
remains extant.
3 Ref 20/3140/HOT dated 15 February 2022
Appeal Decision APP/L5810/D/22/3311260
3
10. Against this background, I do not see the appellant’s proposals in the same
light as the Council. The side/rear extension would be set back, with a
significantly reduced roof level in comparison with the host property, so that it
would appear wholly proportionate and subservient. The main extension would
not be seen when approaching from the south. Views from outside the site to
the rear would be limited. It would be seen in short-range oblique views when
approaching from the north along the main highway, the nearby railway
embankment and bridge would otherwise largely mask views of the completed
building works. Given the screening afforded by extant buildings the
extensions would not be apparent from Vicarage Road.
11. Compared with that already approved, the development proposed in my view
would have but a slightly greater impact both on what remains of the integrity
of the host property and its surroundings. However, that which would be seen,
including the raised entrance, would not cause harm. At worse, in relation to
the CA as a whole, it would have a neutral impact so that its character and
appearance would be preserved.
12. I therefore conclude that the proposed extensions and alterations would sit
acceptably in their restricted visual and spatial contexts without harming the
character and appearance of the host property or its surroundings.
Accordingly, the proposals accord with those provisions of LP4 policies LP1, LP3
and LP4 in that their design demonstrates a thorough understanding of the
site, relates well to its existing context, and preserves the character and
appearance of the CA, and the significance, character and setting of a non-
designated heritage asset.
Conditions
13. In the interests of visual amenity, I shall impose a condition in respect of
external materials, although it will vary from that suggested by the Council.
14. It is necessary, in the interests of certainty that the development shall be
carried out in accordance with the approved plans.
15. To ensure compliance with policy D12 of the London Plan I shall impose the
Council’s suggested condition relating to Fire Safety.
16. I note the Council’s suggested conditions on trees and their root protection
areas. However, the appellants produced an Arboricultural Impact Assessment
at application stage, and the condition I shall impose in the interest of visual
amenity, shall be directed to its recommendations.
17. The Council’s suggested landscaping condition appears to me to relate to a
more major development than proposed. A landscaping scheme is however
required in the interests of amenity and shall therefore be imposed.
18. So as to safeguard against flooding; ground instability and in the interests of
fire safety protection, the Council’s suggested conditions relating to these
matters are imposed.
19. Given the location of the site on a main highway, its restricted nature and
closeness to other property the Council’s suggested condition on construction
4 Richmond Local Plan 2018
Appeal Decision APP/L5810/D/22/3311260
4
management is imposed, albeit in a slightly modified form, to ensure that the
construction phase is carried out with as little disruption as possible.
20. So as to protect neighbouring privacy the Council’s suggestions as to obscure
glazing of some windows and the use of flat roof areas are imposed, in a
modified form.
Other matters
21. I have taken account of all other matters raised in the representations
including the references to the planning history, to the London Plan and the
Framework, but none outweighs those considerations which led me to my
conclusions.
G Powys Jones
INSPECTOR
SCHEDULE OF CONDITIONS
1). The development hereby permitted shall begin not later than three years from
the date of this decision.
2). The development hereby permitted shall be completed in accordance with the
following approved plans: 078-001 P1, 078-010 P1, 078-011 P1, 078-012 P1,
078-013 P1, 078-020 P1, 078-021 P1, 078-022 P1, 078-030 P1, 078-100 P5,
078-101 P5, 078-102 P5, 078-103 P5, 078-200 P5, 078-201 P5, 078-202 P4,
078-300 P5, EAS-074 TCP & EAS-074 TPP.
3). The external surfaces of the development hereby permitted (including windows
and doors) shall not be constructed other than in materials details of which shall be
submitted to and approved in writing by the Local Planning Authority.
4). The development must be carried out in accordance with the provisions of the
PLANNING FIRE SAFETY STATEMENT - Prepared by Unfold Architecture & Design
Ltd – Dated 31 May 2021 and retained as such thereafter.
5). The development hereby permitted shall not be carried out other than in
accordance with the submitted Flood Risk Assessment & Drainage Strategy,
prepared by RAB Consultants, dated 16 June 2022.
6). The development hereby permitted shall not be carried out other than in
accordance with the submitted Desk Study & Basement Impact Assessment Report,
prepared by GEA, dated 27 May 2022.
7). The proposed first floor window in the northwest elevation of the building
hereby approved shall not be openable or glazed, otherwise than in obscured glass,
below a minimum height of 1.7 metres above internal floor level.
8).Notwithstanding the provisions of the Town and Country Planning (General
Permitted Development) (England) Order 2015 (or any Order revoking or re-
Appeal Decision APP/L5810/D/22/3311260
5
enacting that Order) no part of the roof of the extensions hereby approved shall be
used as a balcony or terrace nor shall any access be formed thereto.
9).The development hereby permitted shall not be carried out other than in
accordance with the recommendations contained in the Arboricultural Impact
Assessment prepared by EnviroArb solutions Ltd, dated 1 December 2020.
10).No development shall take place, including any works of demolition, until a
Construction Management Scheme (to include any demolition works) has been
submitted to and approved in writing by the Local Planning Authority. The
approved plan shall be adhered to throughout the construction period. The
Scheme shall provide for:
i. The size, number, routing and manoeuvring tracking of construction vehicles
to and from the site and holding areas for these off site;
ii. Site layout plan showing manoeuvring tracks for any vehicles accessing the
site to allow these to turn and exit in forward gear;
iii. Details and location of parking for site operatives and visitor vehicles
(including measures taken to ensure satisfactory access and movement for
existing occupiers of neighbouring properties during construction);
iv. Details and location where plant and materials will be loaded and unloaded;
v. Details and location where plant and materials used in constructing the
development will be stored, and the location of skips on the highway if
required;
vi. Details of any necessary suspension of pavement, roadspace, bus stops
and/or parking bays;
vii. Details where security hoardings will be installed, and the maintenance of
such;
viii. Details of any wheel washing facilities;
ix. Details of a scheme for recycling/disposing of waste resulting from
demolition and construction works (including excavation, location and emptying
of skips);
x. Details of measures that will be applied to control the emission of noise,
vibration and dust including working hours.
xi. Details of any highway licences and traffic orders that may be required
(such as for licences for any structures / materials on the highway or
pavement; or suspensions to allow the routing of construction vehicles to the
site);
xii. Details of the construction phasing programming and timing of works,
including proposed working hours;
xiii. The Construction Management Statement should be written in conjunction
with the recommendations of the approved Arboricultural Impact Assessment
referred to at condition 9 above.
xiv. A 24 hour emergency contact number.
11). No development shall commence until there shall have been submitted to
and approved in writing by the local planning authority a scheme of
landscaping. The scheme shall include indications of all existing trees and
Appeal Decision APP/L5810/D/22/3311260
6
hedgerows on the land, identify those to be retained and set out measures for
their protection throughout the course of development.
12). All planting, seeding or turfing comprised in the approved details of
landscaping shall be carried out in the first planting and seeding seasons
following the occupation of the buildings or the completion of the development,
whichever is the sooner; and any trees or plants which within a period of 5
years from the completion of the development die, are removed or become
seriously damaged or diseased shall be replaced in the next planting season
with others of similar size and species.
Expert Representation
Don't leave your appeal to chance.
Inspectors are inconsistent. We build a technical defense using precedents from our 182,000+ case archive.
No win, no fee Householder representation — you only pay if you win.