← Back to Archive

Mixed use development of the land around South Kensington Station providing for: the demolition and redevelopment of the Bullnose (including Use Classes A1, A2, A3 and B1), demolition and façade retention of the Thurloe Street Building, refurbishment of the retail facades along Thurloe Street, refurbishment of the Arcade, construction of a building along Pelham Street comprising of residential use (Use Class C3), retail use (A1, A2 and A3), and Office use (use Class

📊

Borough Success Rate

In Royal Borough of Kensington and Chelsea, approx 33.3% of Unknown appeals are successful. (Sample: 3 cases).

Planzo Professional Representation

Technical Appeal Representation

This Unknown case requires a bespoke technical strategy. Contact us for a fixed-fee quotation.

Book Free Review How it works →

Technical Issues Heatmap

Green Belt Character and Appearance Privacy
Keyword Heatmap Locked

Instant scan of technical battlegrounds available with a Day Pass.

Inspector's Analysis

https://www.gov.uk/planning-inspectorate Appeal Decisions Inquiry held on 18-20, 24-27 and 31 January, 2, 3 and 27 February, and 19, 20 April 2023 and 27 April 2023 Site visits made on 18 January and 4 May 2023 by Zoë Hill BA(Hons) MRTPI DipBldgCons(RICS) IHBC an Inspector appointed by the Secretary of State Decision date: 12th December 2023 Appeal A Ref: APP/K5600/W/22/3300872 …

Full Analysis Locked

Unlock full text, site maps, and the evidence-ready PDF.

Unlock Case (£10)