← Back to Archive

Installation of a solar farm comprising ground mounted solar PV panels with a generating capacity of up to 49.9 MW, including mounting system, permanent on site grid connection hub, inverters, underground cabling, stock proof fence, CCTV, internal tracks and associated infrastructure, landscaping, biodiversity net gain and environmental enhancements for a temporary period of 50 years

📊

Borough Success Rate

In Wiltshire Council, approx 57.1% of Major general industry/storage/warehousing appeals are successful. (Sample: 7 cases).

Planzo Professional Representation

Technical Appeal Representation

This Major general industry/storage/warehousing case requires a bespoke technical strategy. Contact us for a fixed-fee quotation.

Book Free Review How it works →

Technical Issues Heatmap

Green Belt Character and Appearance Privacy
Keyword Heatmap Locked

Instant scan of technical battlegrounds available with a Day Pass.

Inspector's Analysis

https://www.gov.uk/planning-inspectorate Appeal Decision Site visit made on 13 April 2026 by Mr Cullum Parker BA(Hons) PGCert MA FRGS MRTPI IHBC an Inspector appointed by the Secretary of State Decision date: 20 April 2026 Appeal Ref: APP/Y3940/W/25/3376878 Land South of Potterne Park Farm, Nr Potterne, Devizes, Wiltshire, SN10 5QT • The appeal is made under section 78 of t…

Full Analysis Locked

Unlock full text, site maps, and the evidence-ready PDF.

Unlock Case (£10)