Extension of existing dropped kerb
📊
See the success rate & inspector analytics
Free to view — just create an account, no payment needed.
Sign Up FreeTechnical Issues Heatmap
Highways & Transport
Policy Weight
Character & Appearance
Inspector’s Reasoning
Appeal Decision
Site visit made on 20 November 2025
by P H Wallace BSc (Hons) DipMS MRTPI
an Inspector appointed by the Secretary of State
Decision date: 18 December 2025
Appeal Ref: APP/L5240/D/25/3372948
79 South Norwood Hill, South Norwood, Croydon, London SE25 6BY
• The appeal is made under section 78 of the Town and Country Planning Act 1990 (as amended)
against a refusal to grant planning permission.
• The appeal is made by Mark Saunders against the decision of the Council of the London Borough of
Croydon.
• The application Ref is 25/01653/HSE.
• The development proposed is extension of existing dropped kerb.
Decision
1. The appeal is allowed and planning permission is granted for the extension of an
existing dropped kerb at 79 South Norwood Hill, South Norwood, Croydon, London
SE25 6BY in accordance with the terms of the application, Ref 25/01653/HSE and
the plans submitted with it, subject to the following conditions:
1) The development hereby permitted shall begin not later than 3 years from the
date of this decision.
2) The development hereby permitted shall be carried out in accordance with
the following approved plans: Drawing Numbers 01 (Site Location Plan V2),
02 (Existing Block Plan V2), 03 (Proposed Block Plan V2), 04 (Proposed
Visibility Splay Block Plan V2), 05 (Existing and Proposed Plans V2), 06
(Existing Elevation and Section V2) and 07 (Proposed Elevation and Section
V2).
3) Prior to the first use of the access hereby permitted, details of the highway
and pedestrian visibility splays to be provided within the site shall be
submitted to and approved in writing by the local planning authority. The
splays shall be provided in accordance with the approved details before the
access is first brought into use and shall thereafter be retained and kept free
of obstruction above a height of 0.6m.
Preliminary Matters
2. I have removed the address from the description of development provided by the
appellant as that is fully set out in the main heading.
Main Issue
3. The main issue is whether the proposal would achieve a safe and suitable access.
Appeal Decision APP/L5240/D/25/3372948
2
Reasons
4. The appeal property (No.79) is a three‑storey semi‑detached house within a
continuous residential frontage on South Norwood Hill. The road is A‑classified
(A251), subject to a 30mph limit and has a largely straight alignment within the
vicinity of the site. Front hard standings are a feature within this part of the street.
They vary in width, with most served by dropped kerb crossovers and several being
too small to permit turning on site. Immediately to the north are two recently built
dwellings (Nos. 79A and 79B) with crossovers serving single/tandem spaces.
5. The frontage to No. 79 is hard‑surfaced. It is wider but shallower than No. 79B and
is identically surfaced. A line of flush‑set paviours marks the common boundary. As
there is no physical barrier between the two plots, the surfacing visually and
functionally reads as a single continuous forecourt that permits unobstructed
vehicle movement. On my site visit, the appeal frontage accommodated a single
parked vehicle, indicating the forecourt is currently used for parking. Bins were
placed against the southern boundary fence, which tapers to a modest height at the
back of the footway.
6. The site directly adjoins the public footway. A streetlight is located close to the kerb
mid-frontage and, to its south, tactile paving marks an uncontrolled pedestrian
crossing with a central refuge. Double yellow lines extend across the frontage and
past Nos. 79A and 79B and several properties to the south, beyond which restricted
on‑street parking is available in both directions. Whilst my site visit was only a
snapshot in time (undertaken at 15:30 and 17:45), these times broadly coincide
with school pick‑up and the evening peak; I observed a steady but intermittent
traffic flow at modest speeds and relatively limited pedestrian activity on the
footway.
7. The proposal would extend the existing dropped kerb to a point just north of the
streetlight to serve two side‑by‑side parking spaces within No. 79’s forecourt, with
the bin storage retained. The arrangement would not allow routine on-site
forward‑on/forward‑off manoeuvres, contrary to the Council’s Vehicle Crossover
Guidelines, June 2021 (the Guidelines).
8. My site observations indicate that reversing manoeuvres are already commonplace
on this street, with several neighbouring forecourts smaller than the dimensions the
Guidelines seek for on‑site turning. Although those accesses likely pre‑date the
Guidelines, I have seen no evidence to suggest that the existing pattern of frontage
parking has created an inherent danger to road users. On the evidence before me,
the principle of limited additional reversing would not be expected to materially
worsen highway safety.
9. The Council notes that the proposed parking bays are not at 90 degrees to the
footway, which could limit sightlines, and that a streetlight sits 0.7m from the
crossover, short of the 1m recommended in the Guidelines. However, the
alignment is only marginally shy of perpendicular and matches the arrangement at
Nos 79A and 79B.
10. Manual for Streets states that the relevant measure is the visibility available where
a driver pauses before entering the footway and carriageway. During my site visit
and taking account of the carriageway alignment and the lack of continuous
on‑street parking at the frontage, I find that a driver emerging from the access
Appeal Decision APP/L5240/D/25/3372948
3
would be likely to achieve good intervisibility with pedestrians and vehicles. The
streetlight would not notably affect this. There is also sufficient space for a
pedestrian to pause safely clear of the proposed widened access, including users
of the uncontrolled crossing, and the limited frequency of vehicle movements
anticipated would not materially compromise pedestrian safety.
11. While concerns have been raised that the rearmost vehicle might enter the
carriageway via the footway, the proposed crossover would correct the current
arrangement, where site access is only possible across the footway. A dropped
kerb would provide a smoother and safer entry and exit than the existing
arrangement. The proposed side‑by‑side layout would operate similarly to tandem
parking (only one vehicle would access the highway at a time) and would be an
improvement for pedestrians using the footway.
12. The National Planning Policy Framework (Framework) requires that development
achieves safe and suitable access for all users and that refusal on transport
grounds should be justified only where the impact on highway safety would be
unacceptable or the residual cumulative impacts severe.
13. In this case, the established pattern of frontage crossovers, the lack of recorded
collisions and no technical evidence to suggest otherwise, together with my site
observations, including that the existing hardstanding is already used for parking
with manoeuvres on and off the carriageway, indicate that the modest level and
types of movements generated would not give rise to an unacceptable or severe
impact. The visibility available to a driver exercising reasonable caution is sufficient
in the circumstances. Consequently, and notwithstanding the identified departure
from the Council’s Guidelines, I conclude that the proposal would achieve a safe
and suitable access and would formalise the existing pattern of parking and
manoeuvring rather than create a markedly different use of the frontage. It would
comply with Policy T4 of the London Plan (2021), Policies SP8, DM29 and DM30 of
the Croydon Local Plan (2018), and the Framework, all of which seek to uphold
highway safety.
Other Matters
14. The Council is satisfied the development would preserve the character and
appearance of the area and safeguard the living conditions of neighbouring
occupiers. They also find it would comply with development plan policy Fire Safety
requirements. I have no reason to disagree with these conclusions, although
compliance with the development plan in these respects is a neutral factor.
Conditions
15. I have considered the conditions put forward by the Council against the Framework
and where necessary have amended their wording in the interests of effectiveness
and precision.
16. In addition to the standard time condition, I have imposed a condition requiring the
development to be carried out in accordance with the approved plans, in the
interests of certainty and for the avoidance of doubt.
17. The condition suggested by the Council requiring the external surfaces of the
development to match the existing building is not necessary in this instance as the
materials used for the access will differ from those on the existing dwelling.
Appeal Decision APP/L5240/D/25/3372948
4
18. The Council has suggested a pre‑commencement condition to secure highway
visibility splays. Visibility splays are a relevant control, but the Council’s proposed
wording should be amended to confirm that the required splays address both
vehicular and pedestrian visibility and that they relate only to land within the
application site. The condition should also specify the maximum height of any
obstruction within the splays and require submission of the splay details prior to the
first use of the access rather than prior to commencement of development.
Conclusion
19. For the reasons given above, I conclude the proposal would accord with the
development plan as a whole and the Framework, and therefore the appeal is
allowed.
P H Wallace
INSPECTOR
Expert Representation
Don't leave your appeal to chance.
Inspectors are inconsistent. We build a technical defense using precedents from our 182,000+ case archive.
No win, no fee Householder representation — you only pay if you win.