Erection of a two-storey side extension (following demolition of an existing single-storey extension)
📊
See the success rate & inspector analytics
Free to view — just create an account, no payment needed.
Sign Up FreeTechnical Issues Heatmap
Policy Weight
Character & Appearance
Residential Amenity
Inspector’s Reasoning
Appeal Decision
Site visit made on 9 October 2025
by Robert Fallon B.Sc. (Hons) PGDipTP MRTPI
an Inspector appointed by the Secretary of State
Decision date: 6 November 2025
Appeal Ref: APP/D3505/D/25/3369384
The Cottage Withindale Lane, Long Melford, Sudbury, CO10 9HS
• The appeal is made under section 78 of the Town and Country Planning Act 1990 (as amended)
against a refusal to grant planning permission.
• The appeal is made by Mr Aidan Powlesland against the decision of Babergh District Council.
• The application Ref is DC/25/01892.
• The development proposed is the erection of a two-storey side extension (following demolition of an
existing single-storey extension)..
Decision
1. The appeal is dismissed.
Applications for costs
2. An application for costs was made by Mr Aidan Powlesland against Babergh
District Council. This application is the subject of a separate decision.
Main issue
3. The main issue is the effect of the development on the character and appearance
of the host dwelling and wider area.
Reasons
Appeal site context
4. The appeal site consists of a mature detached bungalow with rear projection
providing access to a portacabin extension. It has a simple rural-domestic
architectural style and is set on a spacious plot which forms part of a small estate
accompanying Mill House, a large, well-proportioned and handsome 2-storey
property of the Georgian style.
5. As the main focal point of the estate, Mill House contains a range of residential
and commercial buildings within its grounds, many of which are attached to the
property. Although a number of these structures are 2-storeys in height, their
different facing materials (render/timber weatherboarding), lower eaves & roof
ridgelines, and rural-domestic/agricultural architectural styles give them a clear
subservient character to the more formal, imposing and austere appearance of Mill
House.
6. The appeal site is on the eastern edge of the estate set amongst a small wooded
area on slightly elevated ground. Similar to other buildings on the estate, the
bungalow’s low height, modest proportions, different facing materials and
unassuming architectural style give it a subservient character to Mill House.
Appeal Decision APP/D3505/D/25/3369384
2
The effect of the development on the character and appearance of the host dwelling
and wider area
7. The scheme’s 2-storey height and bulk would project significantly above the
existing bungalow and result in it becoming the dominant element of the building. It
would also be in a neo-classical architectural style, which would be out of
character with the simple rural-domestic architectural style of the bungalow.
Although the appellant asserts that the scheme should draw its architectural cues
from the classical style of Mill House, I do not agree as the extension would be
primarily viewed against the existing bungalow, with limited intervisibility between it
and the former building.
8. The appellant also states that the use of a neo-classical style would follow the
well-established tradition of estate follies. However, such buildings are typically
standalone features and there is no evidence before me of them being attached to
modest bungalows constructed in a simple rural-domestic architectural style.
Whilst I agree with the appellant that some meshing of architectural styles has
already occurred on the estate with the 20th century alterations to Withindale Mill, I
do not consider these to be sympathetic to Mill House and as a consequence, they
only reinforce my concerns in respect of the current scheme.
9. In further support of the development, the appellant has drawn my attention to the
mixture of architectural styles and evolution of buildings in Long Melford village.
However, none of these are directly comparable in terms of context, position,
scale, plot size, design or character. Similarly, the letter of support and lack of
neighbour objections do not in themselves demonstrate a lack of harm.
10. When taken collectively, the different elements of the scheme referred to above
would be unsympathetic and harm the character & appearance of the existing
dwelling. I recognise that the development would only result in limited harm to the
wider estate because of the bungalow’s secluded position, but this does not
remove the need to ensure a high quality design that respects the character,
appearance and form of the existing property.
11. In light of the above, I conclude that the scheme would conflict with Policies LP03
and LP24 of the Local Plan1 and Policy LM08 of the Neighbourhood Plan2, which
collectively seek, amongst other things, for development to; (1) be compatible/
harmonious with their location and appropriate in terms of scale; (2) make a
positive contribution to local character; and (3) in the case of extensions to existing
dwellings, incorporate a high standard of design which maintains or enhances the
character and appearance of the building.
12. I also find that the development would conflict with paragraphs 131, 135 and 139
of the Framework3 which collectively seek, amongst other things; (a) the creation
of high quality buildings; (b) visually attractive development as a result of good
architecture; (c) development that is sympathetic to local character; and (d) the
refusal of permission for development that is not well designed. Despite the
appellant asserting that these paragraphs are not relevant (and therefore cited in
error), this confusion may have arisen because they have read an earlier
superseded version of the Framework with slightly different text and formatting.
1 Babergh and Mid Suffolk, Joint Local Plan - Part 1, November 2023.
2 Long Melford Neighbourhood Plan 2018-2037, Referendum Version, August 2022, Long Melford Parish Council.
3 National Planning Policy Framework, Ministry of Housing, Communities and Local Government, 12 December 2024 (as amended
on 7 February 2025).
Appeal Decision APP/D3505/D/25/3369384
3
13. The case officer report clarifies that the development complies with Policy SP09 of
the Local Plan (which relates to the conservation, enhancement and management
of the natural and local environment and networks of green infrastructure). I am as
a consequence satisfied that the scheme is not in conflict with this policy, which
was referred to in the Council’s reason for refusal.
Planning balance
14. There is no evidence before me that demonstrates there are no relevant
development plan policies or the policies which are most important for determining
the application are out-of-date. As a consequence, the presumption in favour of
sustainable development outlined in paragraph 11 of the Framework is not
engaged.
15. The appellant states that the scheme would result in the creation of a library that
could be used by all occupants of the estate for the economic and social benefit of
the area. However, even if there were evidence before me in the form of a legal
agreement/undertaking committing to this, I would consider such an arrangement
to be harmful to the living conditions of future occupants of the bungalow by
reason of loss of privacy and noise & disturbance from comings and goings.
16. I recognise that the scheme would result in economic, environmental and social
benefits from;- (a) an increase in the number of residents at the site, who would
contribute to the Mill House estate, local economy & businesses and wider
community; (b) a more fuel efficient dwelling incorporating sustainable construction
techniques in the extension; (c) a larger dwelling that would suit a wide range of
people and demographic family units with different accessibility needs; and (d)
local employment during construction. However, given that the proposal only
relates to an extension, I consider these benefits to be of limited value and that the
adverse impacts of the scheme would outweigh these, when assessed against the
policies in the development plan and other material considerations.
17. The appellant has emphasized their attempt to address concerns relating to the
previous scheme dismissed at appeal (APP/D3505/D/22/3302344) by reducing the
extension’s size. However, I must consider the appeal scheme on its own merits.
18. I also recognise that the proposal would result in the removal of the unsightly
portacabin extension, but consider its replacement with the scheme before me to
be more harmful by reason of the adverse effects I have described above.
However, if the appellant maintains their desire for a neo-classical designed
dwelling in this part of the estate, it seems to me that the most appropriate solution
would be to pursue a more comprehensive scheme involving the complete
replacement of the existing bungalow with an entirely new structure.
19. In view of the above, I conclude that the scheme does not accord with the
development plan and that other material considerations do not indicate that the
proposal should be determined other than in accordance with this.
Conclusion
20. For the reasons given above the appeal should be dismissed.
Robert Fallon
INSPECTOR
£
Costs decision section
Costs Decision
Site visit made on 9 October 2025
by Robert Fallon B.Sc. (Hons) PGDipTP MRTPI
an Inspector appointed by the Secretary of State
Decision date: 6 November 2025
Costs application in relation to Appeal Ref: APP/D3505/D/25/3369384
The Cottage Withindale Lane, Long Melford, Sudbury, CO10 9HS
• The application is made under the Town and Country Planning Act 1990, sections 78, 322 and
Schedule 6, and the Local Government Act 1972, section 250(5).
• The application is made by Mr Aidan Powlesland for a full award of costs against Babergh District
Council.
• The appeal was against the refusal of planning permission for the erection of a two-storey side
extension (following demolition of an existing single-storey extension).
Decision
1. The application for an award of costs is partially allowed in the terms set out below.
Reasons
2. Parties in planning appeals normally meet their own expenses. However, the
Planning Practice Guidance (PPG) advises that costs may be awarded against:
• a party who has behaved unreasonably; and
• the unreasonable behaviour has caused the party applying for costs to incur
unnecessary or wasted expense in the appeal process.
3. The PPG clarifies that unreasonable behaviour may either be procedural1 or
substantive2. Although an application for costs may relate to events before the
appeal, the PPG states that costs unrelated to the appeal are not eligible for an
award3. In light of this, the appellant’s concerns in respect of how the previous
applications and appeal were considered are not a matter for this Costs application.
4. The application for costs by the appellant is based on substantive grounds in that it
alleges the Council acted unreasonably in; - (1) preventing or delaying
development that should clearly be permitted, based on an inadequate and
incorrect assessment of the submission; and (2) referring to policy SP09 of the
Local Plan4 in the reason for refusal.
5. In accordance with section 38(6) of the 2004 Act5 and section 70(2) of the 1990
Act6, applications for planning permission must be determined in accordance with
the development plan unless material considerations indicate otherwise. The
starting point of decision-making is therefore plan-led.
1 Paragraph: 047 Reference ID: 16-047-20140306, Revision date: 06 03 2014
2 Paragraph: 049 Reference ID: 16-049-20140306, Revision date: 06 03 2014
3 Paragraph: 032 Reference ID: 16-032-20140306, Revision date: 06 03 2014
4 Babergh and Mid Suffolk, Joint Local Plan - Part 1, November 2023.
5 Planning and Compulsory Purchase Act 2004 (as amended)
6 Town and Country Planning Act 1990 (as amended)
Costs Decision APP/D3505/D/25/3369384
2
Ground 1: Preventing or delaying development that should clearly be permitted, based
on an inadequate and incorrect assessment of the submission
6. It will be seen from the appeal decision that I agree with the grounds upon which
the Council refused the application, namely that relating to the effect of the
development on the character and appearance of the host dwelling and wider area.
I also concluded that the proposal did not accord with the development plan and
that other material considerations did not indicate that the proposal should be
determined other than in accordance with this.
7. In view of this, I do not agree that the Council prevented development that should
clearly be permitted and am satisfied that it gave proper consideration to the
appellant’s submission. It did not therefore behave unreasonably and the
application for costs on this substantive ground accordingly fails.
Ground 2: Referring to policy SP09 of the Local Plan in the reason for refusal
8. It will be seen from the appeal decision that I disagree with one of the policies upon
which the Council refused the application, namely that relating to Policy SP09 of
the Local Plan which relates to the conservation, enhancement and management of
the natural and local environment and networks of green infrastructure.
9. This is on the basis that the case officer report clearly states that the development
complied with this policy.
10. In view of this, I consider it unreasonable of the Council to have introduced Policy
SP09 of the Local Plan into its reason for refusal. The application for costs on this
substantive ground therefore succeeds.
Conclusion
11. For the reasons given above, unreasonable behaviour resulting in unnecessary or
wasted expense has occurred in respect of the Council’s reference to Policy SP09
of the Local Plan in the reason for refusal and a partial award of costs is therefore
warranted.
Costs Order
12. In exercise of the powers under section 250(5) of the Local Government Act 1972
and Schedule 6 of the Town and Country Planning Act 1990 as amended, and all
other enabling powers in that behalf, IT IS HEREBY ORDERED that Babergh
District Council shall pay to Mr Aidan Powlesland, the costs of the appeal
proceedings described in the heading of this decision, limited to those costs
incurred in addressing Policy SP09 in the reason for refusal; such costs to be
assessed in the Senior Courts Costs Office if not agreed.
13. The applicant is now invited to submit to Babergh District Council, to whom a copy
of this decision has been sent, details of those costs with a view to reaching
agreement as to the amount.
Robert Fallon
INSPECTOR
Expert Representation
Don't leave your appeal to chance.
Inspectors are inconsistent. We build a technical defense using precedents from our 182,000+ case archive.
No win, no fee Householder representation — you only pay if you win.