← Back to Archive

Breach of planning control as alleged in the notice is, without planning permission, the material change of use of the land from a nil use to a mixed use comprising residential and light industrial (Class E g) iii) of the Town and Country Planning Use Classes Order 1987 (as amended)), through the creation of a live/work unit that consists of a residential unit, workshop and associated operational development. The approximate location of the residential unit and workshop are indicated on the attached plan by a blue ‘X’ and red ‘A’ respectively. The land has been outlined in

📊

Borough Success Rate

In Cornwall Council, approx 32.8% of Change of use appeals are successful. (Sample: 189 cases).

Planzo Professional Representation

Technical Appeal Representation

This Change of use case requires a bespoke technical strategy. Contact us for a fixed-fee quotation.

Book Free Review How it works →

Technical Issues Heatmap

Green Belt Character and Appearance Privacy
Keyword Heatmap Locked

Instant scan of technical battlegrounds available with a Day Pass.

Inspector Profile: Whitfield J

Archive Data: 33 Decisions
Allowance Rate (Change of use)
33.3% ↑ High
National Average (Change of use)
32.5%

Inspector's Analysis

https://www.gov.uk/planning-inspectorate Appeal Decision Site Visit made on 18 February 2026 by J Whitfield BA(Hons) DipTP MRTPI an Inspector appointed by the Secretary of State Decision date: 29th April 2026 Appeal Ref: APP/D0840/C/24/3348536 Land known as Old Pine Workshop, Skate Park Lane, Mount Hawke, Cornwall, TR4 8BQ • The appeal is made under section 174 of the Town and C…

Full Analysis Locked

Unlock full text, site maps, and the evidence-ready PDF.

Unlock Case (£10)