← Back to Archive

Construction of a temporary 49.35MW battery energy storage facility, with security fencing, access and associated works

📊

Borough Success Rate

In Walsall Metropolitan Borough Council, approx 100.0% of Unknown appeals are successful. (Sample: 2 cases).

Planzo Professional Representation

Technical Appeal Representation

This Unknown case requires a bespoke technical strategy. Contact us for a fixed-fee quotation.

Book Free Review How it works →

Technical Issues Heatmap

Green Belt Character and Appearance Privacy
Keyword Heatmap Locked

Instant scan of technical battlegrounds available with a Day Pass.

Inspector Profile: Baird G

Archive Data: 4 Decisions
Allowance Rate (Unknown)
50.0% ↑ High
National Average (Unknown)
45.6%

Inspector's Analysis

https://www.gov.uk/planning-inspectorate Appeal Decision Inquiry Held on 5 November 2024 Site visit made on 20 November 2024 by SRG Baird BA (Hons) MRTPI an Inspector appointed by the Secretary of State Decision date: 14 February 2025 Appeal Ref: APP/V4630/W/24/3347424 Land off Chapel Lane, Great Barr, Walsall  The appeal is made under section 78 of the Town and Country Planning…

Full Analysis Locked

Unlock full text, site maps, and the evidence-ready PDF.

Unlock Case (£10)