Erection of roof extension to front

📊

See the success rate & inspector analytics

Free to view — just create an account, no payment needed.

Sign Up Free

Technical Issues Heatmap

Extensions
Heritage & Conservation
Character & Appearance

Inspector’s Reasoning

Appeal Decision Site visit made on 10 July 2024 by D Cramond BSc MRTPI an Inspector appointed by the Secretary of State for Communities and Local Government Decision date: 8th August 2024 Appeal Ref: APP/Z0116/D/24/3344110 31 Sea Walls Road, Bristol, BS9 1PG • The appeal is made under section 78 of the Town and Country Planning Act 1990 against a refusal to grant planning permission. • The appeal is made by Mr David Johnson against the decision of Bristol City Council. • The application Reference is 23/01478/H. • The development proposed is the erection of roof extension to front. Decision 1. The appeal is allowed and planning permission is granted for the erection of roof extension to front at 31 Sea Walls Road, Bristol, BS9 1PG in accordance with the terms of the application, Ref 23/01478/H, subject to the following conditions: 1. The development hereby permitted shall begin not later than three years from the date of this decision. 2. The development hereby permitted shall be carried out in accordance with the following approved plans: Location Plan, Block Plan (31/SR/SP/11), Proposed Side Elevations A&B, Section A-A, Proposed Second Floor Plan (Jan 2024) & Proposed Front Elevation (Jan 2024). Costs 2. An application for costs has been made by the Appellant against the Council. This application is the subject of a separate decision. Main Issue 3. The main issue is the effect of the proposal on the character and appearance of the host property and the locality. Reasons Character and appearance 4. The appeal property is a relatively modern two storey house in the central position of a visually low-key terrace of three. The locality is an attractive one of established residential character, verdancy and a range of dwelling scales, ages and designs which all come together to be generally pleasing on the eye. The proposal is as described above and is effectively a flat roofed dormer. Appeal Decision APP/Z0116/D/24/3344110 2 5. The site lies within the Downs Conservation Area. There is a duty imposed by Section 72(1) of the Planning (Listed Buildings and Conservation Areas) Act 1990 requiring decision makers to have special regard to the desirability of preserving or enhancing the character or appearance of a Conservation Area. This is reflected within Policy BCS22 of Bristol Core Strategy (2011) (CS) and Policy DM31 in the Site Allocations and Development Management Policies (2014) (DMP). 6. The Council is concerned that the front dormer’s bulk, form, massing and design would lead to a prominent and incongruous feature within the immediate and wider Conservation Area context. 7. However, I would read the dormer as a relatively subtle extension to the property. It is suitably modest in scale and sited well clear of the ridge, eaves and roof sides. External materials would match existing finishes and the glazing configuration would reflect what is below in terms of scale and disposition. The planned feature would bring symmetry to the terrace which, in any event, does not feature strongly from any viewpoints. The characteristic verdant setting would remain and, while front dormers may not feature strongly locally, the variety in roof forms, heights and finishes would comfortably absorb this feature in character and visual terms without any sense of it being alien. Furthermore, I am satisfied that this proposal would not create a precedent for front dormers as each case would have to be determined on its own specific merits. 8. Given the nature of the scheme I conclude that the proposal would not run contrary to the aims of S72(1) of the Act and CS Policy BCS22 and DMP Policy DM31. Additionally, the proposal would not conflict with CS Policy BCS21 and DMP Policies DM26, DM27 and DM30. Taken together and amongst other matters these polices call for well-designed development, suitably detailed and sympathetic to context and streetscene. The scheme would also not run contrary to parallel objectives of the guidance within the Council’s SPD2. Conditions 9. The Council suggests the standard commencement condition along with a requirement for works to be carried out in accordance with listed, approved, plans. I would agree with this to provide certainty. The Council also suggests a condition relating to matching materials but as the application makes this commitment, I would see this as unnecessary. Overall conclusion 10. For the reasons given above I conclude that the appeal proposal would not have unacceptable adverse effects on the character and appearance of the host property or the locality. Accordingly, the appeal is allowed. D Cramond INSPECTOR
£ Costs decision section
Costs Decision by D Cramond BSc MRTPI an Inspector appointed by the Secretary of State Decision date: 8th august 2024 Costs application in relation to Appeal Ref: APP/Z0116/D/24/3344110 31 Sea Walls Road, Bristol, BS9 1PG • The application is made under the Town and Country Planning Act 1990, sections 78, 322 and Schedule 6, and the Local Government Act 1972, section 250(5). • The application is made by Mr David Johnson for an award of costs against the decision of Bristol City Council. • The appeal was made against the refusal of an application, Ref 23/01478/H, which sought planning permission for the erection of roof extension to front. Decision 1. The application for an award of costs is refused. Reasons 2. Planning Practice Guidance (guidance) advises that, irrespective of the outcome of the appeal, costs may only be awarded against a party who has behaved unreasonably and thereby caused the party applying for costs to incur unnecessary or wasted expense in the appeal process. Unreasonable behaviour may be either procedural or substantive. 3. The Appellant argues that there has indeed been unreasonable behaviour by the Council. The Appellant cites the Council’s lack of response over a long period before, at short notice, indicating that the application was to be refused. The Appellant was given only three working days to respond and did raise concerns with the process which should have led the Council to an informed decision. However, the Council appeared to be entrenched in its position. Furthermore, the Council did not have due regard to its own design guidance and provided no detailed evidence within the Officer Report in relation to matters such as consistency with other decisions and the planning history of this specific site with its approved alterations scheme. 4. The Council has not commented on the Appellant’s claim. 5. The general principle embodied within the guidance is that the parties involved should normally meet their own expenses. I have carefully considered the matter of a full or, indeed, a partial, award of costs. 6. I recognise that an appeal process can be time and fee consuming and that professional assistance comes at a cost. It is clearly regrettable when an applicant feels that the processing of a planning application could have been dealt with better. However, I am not persuaded that actions of the Council during that period directly lead to the appeal. Costs Decision APP/Z0116/D/24/3344110 2 7. It appears to me that the Appellant places too great an emphasis on other decisions reached locally within what is an extremely varied area. Similarly, the historic approval for works at the appeal site is markedly different from that now proposed and should not be overly relied upon. Circumstances do differ in individual physical attributes and in applicable policy circumstances. In any event this case had to be dealt with on its own merits. I note the point about the Design Guidance and its content but such publications cannot be expected to cover every eventuality. An example within an SPD is not necessarily transferable everywhere. 8. I would agree that the determination delay is regrettable, although unfortunately not uncommon. While perhaps of little comfort, the Appellant would always have had the right to appeal against non-determination. Once it did deal with matters, I would assess that the Council has given clear reasons for the judgement it reached. I surmise that the Council dealt with the plans and information before them as presented within a professionally prepared planning application, considered all other material considerations, and reached a not wholly unsurprising or illogical decision on the scheme. This scheme was judged on its own merits albeit there was mention of the fear of precedent. The refusal reason is clear and sets out unequivocally the concerns of the Council and cross-refers to applicable policies. 9. As it happens, I do not agree with the conclusion reached by the Council on the scheme. However, I would nevertheless defend its wording and assertions in the round as not being unsubstantiated and its actions throughout the planning assessment process as not being irrational. 10.I therefore find that unreasonable behaviour resulting in unnecessary expense, as described in the planning guidance, has not been demonstrated. D Cramond INSPECTOR
Expert Representation

Don't leave your appeal to chance.

Inspectors are inconsistent. We build a technical defense using precedents from our 182,000+ case archive.
No win, no fee Householder representation — you only pay if you win.

Get Free Review How it works →