Fence and gate above 1m
📊
See the success rate & inspector analytics
Free to view — just create an account, no payment needed.
Sign Up FreeTechnical Issues Heatmap
Highways & Transport
Policy Weight
Fallback Position
Inspector’s Reasoning
Appeal Decision
Site visit made on 10 June 2019 by Thomas Courtney BA(Hons) MA
Decision by Andrew Owen MA BA(Hons) MRTPI
an Inspector appointed by the Secretary of State
Decision date: 27th June 2019
Appeal Ref: APP/W1525/D/19/3225695
22A Beehive Lane, Great Baddow, Chelmsford CM2 9TQ
• The appeal is made under section 78 of the Town and Country Planning Act 1990
against a refusal to grant planning permission.
• The appeal is made by Mrs Kemi Fapohunda against the decision of Chelmsford City
Council.
• The application Ref 18/01859/FUL, dated 5 November 2018, was refused by notice
dated 6 February 2019.
• The development is the erection of fence and gate above 1m.
Decision
1. The appeal is dismissed.
Appeal Procedure
2. The site visit was undertaken by an Appeal Planning Officer whose
recommendation is set out below and to which the Inspector has had regard
before deciding the appeal.
Procedural Matter
3. The Council altered the description of the proposed development to
‘retrospective application for fence and gates’. During the site visit I observed
that the development has been carried out and I have considered the appeal on
this retrospective basis.
Main Issue
4. The main issue is the effect of the development on highway safety.
Reasons for the Recommendation
5. The timber fence and gates are constructed along the southern and eastern
boundaries of the appeal site. The gates are directly adjacent to the public
footway. On my site visit, I found that Beehive Lane is a relatively busy road
and that there is a bus stop which lies in front of the appeal property. Buses
using the stop therefore station themselves in front of the site, adjacent to the
gates and front hedge.
6. As the gates are positioned at the very front of the site, vehicles using the
access must wait within Beehive Lane whilst the gates are being opened. This
interrupts the flow of traffic on the carriageway, obstructs the footway, and
prevents buses from using the bus stop. I also find that the development
Appeal Decision APP/W1525/D/19/3225695
2
reduces the visibility for vehicles leaving the neighbouring dwelling at 24
Beehive Lane.
7. I concur with the Highway Authority’s objection in that stationary vehicles
using the access are vulnerable and increase the eventuality of a collision
despite the fact that there are only a small number of vehicle movements to
the site. Also, considering Beehive Lane is a busy road, vehicles waiting to use
the access have a detrimental impact on traffic flow during busy hours. I find
that vehicles using the access represent an inconvenience to other users and
are hazardous to highway safety.
8. I note the point made by the appellant’s agent in the grounds of appeal which
references the Manual for Streets (MfS) and the relationship between traffic
flow and road safety with direct frontage access. However, the referenced data
does not appear to specifically relate to driveways with gates or stationary
vehicles within heavily-trafficked roads, nor does it mention obstruction to
public transport and pedestrian footways or the visibility splays of neighbouring
properties. I therefore attribute limited weight to this point.
9. The agent highlights that speeds are slow, that the street lighting provides
good visibility and that users of the highway can expect to be slowed down as
there are many other driveways off Beehive Lane. Nonetheless, these factors
do not change my view that this arrangement on a busy road is hazardous and
increases the likeliness of a collision.
10. Furthermore, I note the agent’s suggestion that the gates could be left open
meaning vehicles would not need to stop within the carriageway. However, I
find this to be unlikely and, in any case, beyond the control of the Council.
11. Overall, I conclude the fence and gates have a detrimental impact on highway
safety and conflict with Paragraph 108 of the National Planning Policy
Framework (NPPF) which aims to ensure safe and suitable access to sites, as
well as Paragraph 109 of the NPPF which states that development should be
refused on highway grounds if there would be an unacceptable impact on
highway safety.
12. The appellant’s agent has suggested the existence of a ‘fallback’ position under
Class A, Part 2 of Schedule 2 of the Town and Country Planning (General
Permitted Development) (England) Order 2015. I note there may be the
possibility to erect fencing and gates up to 1 metre in height under permitted
development rights. Nonetheless, I must consider the proposal before me
against the advice concerning highway safety set out in the NPPF and the
feasibility of what may be constructed under permitted development does not
outweigh this consideration.
Recommendation
13. Therefore, for the reasons given above and having had regard to all other
matters raised, I recommend that the appeal should be dismissed.
Thomas Courtney
APPEAL PLANNING OFFICER
Inspector’s Decision
Appeal Decision APP/W1525/D/19/3225695
3
14. I have considered all the submitted evidence and the Appeal Planning Officer’s
recommendation and on that basis the appeal is dismissed.
Andrew Owen
INSPECTOR
Expert Representation