Site visit made on 2 April 2019
by M Russell BA (Hons) DipTP MRTPI
an Inspector appointed by the Secretary of State
Decision date: 10 June 2019
Appeal Ref: APP/Z2505/D/18/3216631
Bramley House, Wainfleet Road, Boston PE21 9RW
• The appeal is made under section 78 of the Town and Country Planning Act 1990
against a refusal to grant planning permission.
• The appeal is made by Mr Jonathan Padley against the decision of Boston Borough
Council.
• The application Ref B/18/0291, dated 11 August 2018, was refused by notice dated
28 September 2018.
• The development proposed is demolition of existing single storey garage/outbuilding
and construction of 1 1/2 storey domestic garage/annexe.
Decision
1. The appeal is dismissed.
Application for costs
2. An application for costs was made by Mr Jonathan Padley against Boston
Borough Council. This application is the subject of a separate Decision.
Procedural Matters
3. The Council’s decision notice included an amended description of the proposal.
However, I have considered the appeal on the basis of the description on the
planning application form which provides sufficient clarity.
4. The evidence before me indicates the clear intention to erect the proposed
building in the same position as the existing outbuilding. Whilst the site plan
provided states the existing outbuilding is to be demolished and replaced, a
proposed block plan has not been provided. This would assist in confirming
that the proposed building sits within the parameters of the appeal site
including additions beyond the existing footprint such as the proposed balcony.
However, as I am dismissing the appeal on the substantive grounds indicated
by the Council, I do not consider that this omission requires rectifying at this
late stage.
5. The Council’s decision notice referred to Saved Policy G1 of the Boston Borough
Local Plan LP (1999) and Policy 2 of the emerging South East Lincolnshire Local
Plan 2011 – 2036. During consideration of this appeal the Council has provided
an update to the appellant and I to confirm that Boston Borough Council and
South Holland District Council adopted the South East Lincolnshire Local Plan
2011-2036 (SELLP) (8 March 2019) and that consequently the saved Policies of
the LP (1999) have been deleted. The Council has confirmed that the relevant
policy of the SELLP remains as Policy 2 as previously referred to in their
Appeal Decision APP/Z2505/D/18/3216631
2
decision notice and I note there has been no change to the text of this
particular policy since the Council’s decision. I therefore consider that no party
has been prejudiced and my assessment is therefore based on the updated
position in terms of the development plan for the area. The now deleted Policy
G1 has therefore not been material in my considerations.
6. The appellant has drawn my attention to an outline consent on adjoining land
immediately to the east of the appeal site. The Council has, in turn provided
me with an indicative layout that accompanied the planning permission for that
site. In noting that the access to that development was fixed by the outline
permission, there is a strong possibility that the development would comprise
dwellings in relatively close proximity to the annexe.
Main Issues
7. The main issue in this appeal is, having regard to the size, siting and design of
the development proposed, the effects on the living conditions of existing and
future occupiers.
Reasons
8. The part of Wainfleet Road where the site is located is characterised by ribbon
development comprising mainly detached dwellings of varying design. The
proposal would replace the existing single storey outbuilding with a 1.5 storey
building. The building would incorporate replacement garaging and storage at
ground floor and would provide new living accommodation in the roofspace.
9. As a detached building positioned at the far end of the garden, there would be
no physical link to the host dwelling. The level of accommodation proposed
would contain all the facilities required to facilitate independent living with two
bedrooms, an en-suite serving one of the bedrooms, a bathroom and open plan
kitchen, lounge and dining space. The design of the proposal with first floor
accommodation and the incorporation of features including a first-floor balcony
area and chimney would give the proposal the appearance of an independent
unit. There is an existing second point of access to the site from Wainfleet
Road between Jura and Romney. This could facilitate independent access
which would give an even greater degree of separation from the host dwelling.
10. Consequently, the facilities would go beyond what could be considered as basic
ancillary accommodation and there would also be no obvious reliance on the
main dwellinghouse. Despite the appellant’s contention that the proposal is not
for an independent unit, given the lack of physical link to the main dwelling, in
my judgement the proposal would not appear subordinate nor has it been
designed to function in an ancillary manner to the main dwelling. Most
commonly, an annexe would be in the form of an extension to an existing
dwelling with limited facilities and a physical connection between the two
elements. When an annexe was no longer required, the accommodation would
be incorporated within the main dwelling and the whole would be used as a
single dwelling. I therefore find that the Council’s concern that the proposal
would be tantamount to an independent dwelling is not unfounded.
11. The imposition of a condition to limit the use of the annex to purposes ancillary
to the occupation of the main dwelling would not control the ownership or the
sharing of services. It would be difficult to monitor or enforce in the long term
Appeal Decision APP/Z2505/D/18/3216631
3
and would not be appropriate in this instance having regard to the level of
accommodation proposed and the juxtaposition of the two elements.
12. The proposal includes bedroom windows at first floor level and these would
have a particularly close relationship with the host dwelling and its associated
garden. Being mindful of the likely difficulties that might present themselves in
the longer term should the proposed annex be no longer required in connection
with the host dwelling, it is likely that privacy between the two would be
significantly compromised if the proposal were to be occupied by unrelated
persons.
13. Moreover, as set out in my preliminary paragraph above, the balcony at first
floor of the annexe together with other first floor windows would sit close to the
future development site immediately to the east. This would be likely to have
an unacceptable effect on future occupiers in terms of overlooking of rear
gardens and windows in the rear elevations of the nearest dwellings.
14. The continued use of the second point of access off Wainfleet Road to access
the proposed garden store would be infrequent and no different to the existing
situation. However, having recognised that it would be difficult to control
independent use of the building, there may be a desire for occupants to use the
unmade track for independent access. Any intensification of use of this track
could give rise to noise and disturbance beyond the established situation and
the unmade nature of the track would be likely to increase such impacts. Such
an increase in activity would be appreciable particularly from the rear gardens
serving Jura and Romney which border this access. Whilst I acknowledge any
increase in activity would be limited, this would only compound the undesirable
relationship between the proposal and existing occupiers.
15. Taking account of the considerations above regarding the physical detachment,
size and free-standing, self-contained nature of the development, the proposal
would be likely to give rise to a harmful effect on the living conditions for
existing and future occupiers with particular regard to privacy for occupiers of
the host dwelling and those residing in the proposed building, particularly given
my concerns as to the potential long term implications as described above. In
addition, the proposal would give rise to unacceptable effects on the living
conditions of the existing occupiers of Jura and Romney in terms of noise and
disturbance. Furthermore, there would be unacceptable impacts arising on the
future occupiers of the adjoining new development to the east in terms of loss
of privacy. The proposal would therefore be contrary to Policy 2 of the SELLP
(2019) which includes amongst other things that developments meet the
principles of sustainable development in terms of size, scale and layout and
impact on amenity as well as potential impacts on neighbouring land uses. The
proposal also conflicts with Paragraph 127 of the National Planning Policy
Framework which includes that decisions should ensure a high standard of
amenity for existing and future users.
Other Matters
16. The appeal submissions draw attention to several appeals allowing proposals
for annexes elsewhere and a previous decision by the Council granting planning
permission for an annexe on a different site. From the information provided,
none appear to reflect the particular circumstances of this case. I have not
therefore attached significant weight to these decisions either for or against the
appeal scheme and I have considered the appeal proposal on its own merits.
Appeal Decision APP/Z2505/D/18/3216631
4
17. The evidence indicates that the proposed annex would initially be for the
appellant’s visiting children and in the next few years would provide
accommodation to support an elderly relative. Dismissing the appeal would
mean that the appellant would be likely to have to consider other options for
meeting their accommodation needs. There is no evidence before me to
demonstrate that the appeal proposal would be the only means by which such
needs may be reasonably met. Accordingly, dismissing the appeal would be a
proportionate response given the identified harm.
18. The appellant’s preference is to retain existing garage and storage facilities at
ground level and I am advised this has influenced the design with upper floor
accommodation. However, I do not consider this as being sufficient
justification for the design of the proposal, its lack of reliance on the host
dwelling or the effects on living conditions identified above.
19. The appellant refers to Policies 1 and 3 of the SELLP in their submission
although I have not been provided with a copy of these policies nor has my
attention been drawn to any specific elements within these policies which would
justify the harm identified.
Conclusion
20. For the reasons given above, I conclude that the appeal should be dismissed.
Martin Russell
INSPECTOR
£
Costs decision section
Costs Decision
Site visit made on 2 April 2019
by M Russell BA (Hons) DipTP MRTPI
an Inspector appointed by the Secretary of State
Decision date: 10 June 2019
Costs application in relation to Appeal Ref: APP/Z2505/D/18/3216631
Bramley House, Wainfleet Road, Boston PE21 9RW
• The application is made under the Town and Country Planning Act 1990, sections 78,
322 and Schedule 6, and the Local Government Act 1972, section 250(5).
• The application is made by Mr Jonathan Padley for a full award of costs against Boston
Borough Council.
• The appeal was against the refusal planning permission for demolition of existing single
storey garage/outbuilding and construction of 1 1/2 storey domestic garage/annexe.
Decision
1. The application for an award of costs is refused.
Reasons
2. The Planning Practice Guidance (PPG) advises that costs may be awarded
where a party has behaved unreasonably and the unreasonable behaviour has
directly caused another party to incur unnecessary or wasted expense in the
appeal process.
3. The PPG sets out the type of behaviour that may give rise to a substantive
award against a local planning authority (LPA) and includes situations where an
LPA has prevented or delayed development which should clearly be permitted,
having regard to its accordance with the development plan, national policy and
any other material considerations. Another example of where there might be
an award of costs is where planning permission has been refused on a planning
ground capable of being dealt with by condition.
4. The appellant contends that the Council had no basis upon which to make an
assumption that the proposal would be used independently of the main
dwelling. They suggest that if the Council had such concerns, independent use
could have been adequately controlled by means of model condition 47 as set
out in Appendix A of Circular 11/95.
5. The reasons for refusal and the Officer’s report explain exactly why the Council
considered that the proposal would not be ancillary. In doing so, reference was
made to the size and scale of the proposal, the level of independence from the
main house and the opportunity for a separate means of access. It seems to
me that registration of the application as an annexe does not necessarily
preclude an assessment of the consequences of allowing the development if it
were to be used differently or could evolve in such a way as to form a separate
residential unit. In this case, given the characteristics of the proposal, it would
have been remiss of the Council not to identify the clear possibility that the
building could be occupied independently in the future. I have similarly found
Costs Decision APP/Z2505/D/18/3216631
2
that the proposal would be of a size, scale and layout which would mean that it
is not likely to function in an ancillary manner to the main dwelling in the
longer term. My appeal decision also explains why a condition to control
ancillary use could not be substantiated in this particular instance given the
composition of the proposal and its juxtaposition with the host dwelling.
6. The policies cited in the Council’s reason for refusal are not specific to
independent dwellings and would be relevant to any new development
proposal. It would have been reasonable to assess the proposal against these
policies whether the proposal had been for an independent dwelling or as in
this case for an annexe. In reaching their decision the Council referred to
potential harm on the living conditions of existing and future occupiers and not
just to the nature of the proposal. When assessed against the policy cited in
the Council’s decision, I have identified harm to neighbouring living conditions,
even when assessed as an annexe.
7. I therefore find that unreasonable behaviour resulting in unnecessary or
wasted expense, as described in the PPG, has not been demonstrated. For this
reason, and having regard to all other matters raised, an award for costs is
therefore not justified.
M Russell
INSPECTOR
Expert Representation
Don't leave your appeal to chance.
Inspectors are inconsistent. We build a technical defense using precedents from our 182,000+ case archive.
No win, no fee Householder representation — you only pay if you win.