Appeal Decision
Site visit made on 19 January 2019
by S Poole BA(Hons) DipArch MPhil MRTPI
an Inspector appointed by the Secretary of State
Decision date:12 February 2019
Appeal Ref: APP/T5150/D/18/3215437
54 Cranleigh Gardens, Harrow HA3 0UW
• The appeal is made under section 78 of the Town and Country Planning Act 1990
against a refusal to grant planning permission.
• The appeal is made by Mr M Salad against the decision of the Council of the London
Borough of Brent.
• The application Ref 18/3307, dated 21 August 2018, was refused by notice dated
19 October 2018.
• The development proposed is described on the application form as “combine two
separately constructed single storey rear extensions”.
Decision
1. The appeal is dismissed.
Background and Main Issue
2. In January 2018 Prior Approval was deemed not to be required for a single-
storey rear addition extending beyond part of the rear wall of the appeal
property by 5.6m (ref: 17/5088). In August 2018 Prior Approval was deemed
not to be required for a single-storey rear addition extending beyond a
separate part of the rear wall of the house by 6m (ref: 18/2624). The Order1
that sets out the legislation in respect of this form of Prior Approval states that
the development must be carried out in accordance with the information
submitted. The plans submitted show entirely separate rear additions forming
separate unconnected rooms enclosed by cavity walls on three sides.
3. At the time of my site visit a full-width rear extension was at an advanced
stage of construction. Whilst this extension includes gaps in the floor, wall and
roof, the pair of entirely separate and unconnected developments shown on the
drawings submitted in respect of the aforementioned applications have not
been constructed. For these reasons I consider the development before me to
be a full-width single-storey rear extension as opposed to the amalgamation of
two separate developments carried out under the Order.
4. The main issue in this case is therefore the effect of the appeal scheme on the
living conditions of occupiers of 56 Cranleigh Gardens, with particular regard to
outlook.
1 Schedule 2, Part 1, Class A of the Town and Country Planning (General Permitted Development) (England) Order
2015, as amended.
Appeal Decision APP/T5150/D/18/3215437
2
Reasons
5. The appeal property is a 2-storey end of terrace house. It is situated in a
residential street comprising properties of similar size and appearance. The
appeal scheme has resulted in the formation of a long, blank wall immediately
next to the boundary shared with the attached neighbouring property, 56
Cranleigh Gardens. Due to its height and protrusion beyond the rear elevation
of No. 56, the appeal scheme is an imposing and overbearing form of
development that significantly reduces outlook from the nearest ground floor
window in No. 56 and the adjacent part of the garden.
6. For these reasons I conclude that the appeal scheme has an unacceptable
effect on the living conditions of the occupiers of No. 56. It is therefore
contrary to Policy DMP1 of the London Borough of Brent Local Plan
Development Management Policies (2016). Amongst other matters this policy
states that development will be acceptable provided its siting and scale provide
high levels of external amenity. There is also conflict with the aims of the
Council’s Residential Extensions and Alterations SPD2 (2018).
7. The appellant has suggested that the pair of prior approval approvals represent
fallback development that could be carried out in the event of this appeal being
dismissed. Given the significant differences between the drawings submitted
with the prior approval applications and the development undertaken I am not
convinced that the requirements of the Order can be met. I therefore attribute
limited weight to the suggested fall-back development.
Conclusion
8. For the reasons set out above, and having regard to all other matters raised, I
conclude that the appeal should fail.
S Poole
INSPECTOR
Expert Representation
Don't leave your appeal to chance.
Inspectors are inconsistent. We build a technical defense using precedents from our 182,000+ case archive.
No win, no fee Householder representation — you only pay if you win.