Appeal Decision
Site visit made on 18 December 2018
by Martin Andrews MA(Planning) BSc(Econ) DipTP & DipTP(Dist) MRTPI
an Inspector appointed by the Secretary of State
Decision date: 03 January 2019
Appeal Ref: APP/R5510/D/18/3213275
46 Linksway, Northwood HA6 2XB
The appeal is made under section 78 of the Town and Country Planning Act 1990 against
a refusal to grant planning permission.
The appeal is made by Mr and Mrs Warren and Nicola Appel against the decision of the
Council of the London Borough of Hillingdon.
The application, Ref. 14935/APP/2018/2359, dated 25 June 2018, was refused by notice
dated 20 September 2018.
The development proposed is a single storey side extension; garage conversion; new
front porch canopy and new driveway entrance gates.
Decision
1. The appeal is dismissed insofar as it relates to the single storey side extension.
The appeal is allowed insofar as it relates to the new front porch canopy and
new driveway entrance gates and planning permission is granted for a new
front porch canopy and new driveway entrance gates at 46 Linksway,
Northwood HA6 2XB in accordance with the terms of the application, Ref. 14935
/APP/2018/2359, dated 25 June 2018, subject to the following conditions:
1) The development hereby permitted shall begin not later than three years
from the date of this decision;
2) The development shall be carried out in accordance with the following
approved plans: Drawing Nos. AAN/06 Rev. A; AAN/07; AAN/09 Rev. A; &
AAN/10, including annotations thereon.
Main Issue
2. The main issue is the effect of the proposed side extension and entrance gates
on the character and appearance of the street scene of Linksway and the wider
Copsewood Estate Area of Special Local Character (‘the ASLC’).
Reasons
3. The main proposal of the appeal scheme is a single storey side extension to the
front part of the host dwelling’s northern flank which forms part of the set-back
return building line facing The Broadwalk. The main area of the addition would
be a replacement garage for the existing integral garage, which would be
converted to living space, whilst a smaller rearward section would be a new pool
changing room and shower room.
4. I recognise that the proposal would improve the ground floor layout of the
house and its facilities, whilst at the same time maintaining garaging provision
Appeal Decision APP/R5510/D/18/3213275
2
at the property. Its merits also extend to the extension being proportionate to
the dwelling. Indeed, in my view it could be reasonably be described as being
of a modest scale, and together with a sympathetic design I consider that in
itself it is an acceptable proposal. In this regard, I note that despite some
technical conflict as regards height with the Council’s HDAS: Residential
Extensions SPD, the Delegated Report accepts that the proposal would largely
comply with that document in respect of its relationship with the existing house.
5. However, Section 4 of HDAS which deals with single storey side extensions
includes paragraph 4.13 on ‘Building Lines’. This says in effect that as regards
the location of extensions, the relationship with building lines, frontages and
extensions should be respected; that building lines within schemes should relate
to the street pattern, and that development should have a clearly defined
building line creating a clear visual edge.
6. The paragraph also explains that ‘in some instances varied building lines can
achieve diversity and interest’. However, the somewhat formal and regular
established development pattern of the Copsewood Estate ASLC is clearly not
such an instance. And from my visit to the appeal site, I am firmly of the view
that the junction of Linksway and The Broadwalk in particular is a location
where the retention of reasonable distances between the buildings and their
boundaries to the roads is essential to retain the spacious character of the
locality.
7. Applying this planning judgement to the appeal property, I consider that all the
other aspects of paragraph 4.13 are important in this case. The existing return
building line to The Broadwalk is of a fairly limited depth, especially in relation
to the dwelling and plot size; it is characteristic of the street pattern; the
existing north elevation of the dwelling provides a clear definition of a building
line and creates an equally clear visual edge. By way of contrast, the proposed
extension, even though single storey in height and of a length less than the
house, would not respect the existing building line and street pattern, whilst at
the same time would break up the clear visual edge.
8. As the Delegated Report points out, there would be a set-back of only between
0.8m and 1.1m from the boundary to the building, necessitating the removal of
existing mature planting that presently offsets the already fairly modest gap
relative to the spacious character of the area. There would be little or no room
for replacement planting, and with the building’s prominent position on this
open corner of the junction between Linksway and The Broadwalk the extension
would inevitably draw the eye as an intrusive addition to the street scene. (I
use the term ‘open’ to mean an absence of built form, as landscaping cannot be
relied upon to permanently and effectively to hide unsympathetic alterations to
the development pattern.)
9. I have had regard to the fact that there was a permission for a slightly lower
extension in the same position, initially granted in 2011 and renewed in 2014.
However, the 2014 permission is now time-expired and whilst policies may not
have changed significantly since it was extant, it is for the decision-maker at
any one time who must apply their planning judgement.
10. Overall in terms of the proposed side extension, and taking all other matters
raised into account, I conclude that the development would have an
Appeal Decision APP/R5510/D/18/3213275
3
unacceptably harmful effect on the character and appearance of the street
scene of Linksway and the wider Copsewood Estate ASLC. This would be in
conflict with Policies BE1 & HE1 of the Hillingdon Local Plan: Part One – Strategic
Policies 2012; Policies BE5, BE13, BE15, & BE19 of the Hillingdon Local Plan: Part
Two – Saved UDP Policies 2012; the Council’s HDAS Residential Extensions SPD and
Section 12: ‘Achieving Well-Designed Places’ of the National Planning Policy
Framework 2018.
11. Turning more briefly to the remainder of the scheme the Council, correctly in my
view, has no objection to the new front porch canopy. However, it regards the
proposed gates as being out of keeping with the street scene and ASLC. I take a
contrary view as the proposed gates are of a traditional material, are not
excessively ornate, would have visual permeability and be only 1.5m high. I am
also puzzled as to the reference in the officer’s report to gates of this type being
‘the odd exception’ when from my observations of neighbouring houses, and in
particular the detailed written and photographic evidence in the grounds of appeal,
they are in fact commonplace in Linksway. Provided gates of this type are not too
high and are used together with other forms of boundary treatment at a particular
property they neither cause harm nor conflict with the relevant Council’s policies -
Polices BE1, HE1, BE5, BE13 & BE19 as detailed above and saved UDP Policy BE6.
12. I shall therefore the appeal and grant planning permission for the front porch
canopy and driveway gates, subject to a condition requiring compliance with the
approved (in part) plans which is for the avoidance of doubt and in the interests of
proper planning. I see no reason for a materials condition in addition, as the plan
details are clear.
13. In regard to the proposed side extension, for the reasons explained the appeal is
dismissed.
Martin Andrews
INSPECTOR
Expert Representation
Don't leave your appeal to chance.
Inspectors are inconsistent. We build a technical defense using precedents from our 182,000+ case archive.
No win, no fee Householder representation — you only pay if you win.