Site visit made on 3 December 2018
by Mrs Hollie Nicholls MSc MRTPI
an Inspector appointed by the Secretary of State
Decision date: 20 December 2018
Appeal Ref: APP/D0121/D/18/3209451
44 Station Road, Nailsea BS48 4PD
The appeal is made under section 78 of the Town and Country Planning Act 1990
against a refusal to grant planning permission.
The appeal is made by Mrs T Patrick against the decision of North Somerset Council.
The application Ref 18/P/2418/FUH, dated 15 February 2018, was refused by notice
dated 11 July 2018.
The development proposed is a 2-bay carport.
Decision
1. The appeal is allowed and planning permission is granted for a 2-bay carport at
44 Station Road, Nailsea, BS48 4PD, in accordance with the terms of the
application, Ref 18/P/2418/FUH, dated 15 February 2018, subject to the
conditions in the attached schedule.
Preliminary Matters
2. The proposal is described on the application form as a three bay carport.
However, the plans submitted to the Council were amended prior to
determination of the application and now show a two bay carport instead. I
have changed the description of the development to more accurately reflect the
proposal.
Main Issue
3. The main issue is the effect of the proposal on protected trees.
Reasons
4. 44 Station Road is a detached two storey dwelling which faces towards
Station Road behind a stone wall and garden area. There are two large trees in
the front boundary. There is a large block paved driveway to one side of the
frontage and the rest of the space is laid to lawn. From evidence before me and
my own observations, it appears that the lawn area is also utilised for the
parking of vehicles.
5. The trees on the appeal site form part of a group protected by a Tree
Preservation Order (TPO) confirmed in 1977 which includes two Oaks and two
Limes. The other two trees are within the school grounds adjoining the site.
Other mature trees in the wider area are also protected by the same order,
including two others on the side boundary of the appeal site. The group of trees
along the frontage form a prominent feature in the streetscene along Station
Appeal Decision APP/D0121/D/18/3209451
2
Road and therefore make a significant contribution to the character of the area.
This contribution is indicated by their inclusion within the TPO.
6. The proposal is to construct a double bay carport on the space between the
front elevation of the house and the trees at the front boundary. The carport is
proposed to be located within the root protection area (RPA) of both of the
protected trees and would involve positioning six timber supports with vertical
concrete bases amongst the RPA area. Beneath the carport, a layer of ‘No-Dig'
Cellular confinement System would be laid and infilled with gravel. This
surfacing would extend to, and connect with the existing driveway.
7. The proposal has been submitted with two Arboricultural Impact Assessment,
Method Statement and Tree Protection Plans (Method Statement and TPP), the
latter of which was updated to correspond with the reduced size of the carport.
The adequacy of the arboricultural reports is in dispute between the parties.
The Council indicate that the reports do not adequately detail the size of the
canopies, any changes to site levels or the effects of changes to surface water
interception on the protected trees.
8. From my observations, the tree canopies appeared comparable with that shown
on the TPP. Similarly, I have no reason to doubt the extent of the RPAs shown
on the plan, which indicates that the carport would overlap with the RPAs of
both protected trees. The Method Statement and TPP are otherwise
comprehensive and I am satisfied that they adequately address the
requirements of the applicable British Standard (BS) (BS 5737:2012), having
been produced by an appropriately qualified professional. Some of the detail
sought by the Council would appear to be more prescriptive than seems
necessary relative to the scale of works proposed and given the moderate
tolerance level of these trees to changes within their root environments
compared to other more sensitive species.
9. The method statement for the undertaking of the works is sufficiently detailed
and would involve employing protection measures, including designating a
construction exclusion zone (CEZ) with temporary protection barriers and
ground protection measures, as well as hand-digging the pits for the concrete
bases of the carport. I note that there is a typographical error in respect of the
number of concrete bases in the Method Statement and TPP which is in fact six,
as opposed to the four detailed. Otherwise, no activity is planned to take place
within the CEZ. All construction activities are due to be overseen by the
appointed project arboriculturalist.
10. In terms of level changes, the site is relatively level in the area that the carport
is intended to be installed. In respect of the driveway extension using the
‘No Dig’ cellular confinement system, the Method Statement and TPP detail that
the area will be cleared of vegetation and a general level created using hand
tools and clean sand where necessary. The geo textile membrane will then be
laid across the surface and retained using tannalised wooden retaining boards
staked into the ground, tapering to the existing ground level using top soil.
These works do not require level changes that necessitate a topographical
survey, particularly as the proposed height of the carport relative to ground
level and the existing boundary fence is shown on plan PL01E.
11. In terms of surface water, the ‘No Dig’ cellular confinement system is
specifically designed to be porous, enabling air and moisture to reach the tree
roots and encourage healthy growth. As such, there should be little change to
Appeal Decision APP/D0121/D/18/3209451
3
the degree of infiltration of surface water. The modest roof of the carport will
alter the rainwater interception to a minor extent, but a condition requiring a
means of redistributing surface water to this area could satisfactorily resolve
this issue.
12. Consequently, in respect of the main issue, as the proposal has sufficiently
addressed the existence of the protected trees and their root systems, and due
to the mitigation measures that would be employed during construction or
subsequently agreed by condition, the proposal would not have a detrimental
effect on the protected trees and would allow for them to be retained without
detriment to the character and biodiversity value of the area.
13. Consequently, the proposal is in compliance with Policy DM9 of the
North Somerset Sites and Policies Plan Part 1 2016 (NSSPP) which requires
that the future growth of tree canopies and roots should be fully accounted for
in the design, location, spacing and orientation of buildings, gardens and green
spaces. The proposal would also comply with Policies CS4 and CS9 of the
North Somerset Council Core Strategy 2017 (Core Strategy) which, amongst
other things, seek to protect trees which make a positive contribution to the
character and biodiversity value of an area.
14. The proposal would also comply with Policies CS5 and CS12 of the
Core Strategy, which require that proposals of all scales will be required to
demonstrate sensitivity to the existing local character already established in an
area and that the character, distinctiveness, diversity and quality of
North Somerset’s landscape and townscape will be protected and enhanced.
15. The proposal would also comply with Policies DM8, DM10 and DM32 of the
NSSPP, which require that proposals take account of their impact on local
biodiversity and identify appropriate mitigation measures, conserve and
enhance natural or semi-natural vegetation characteristic of the area and
ensure that the siting, soft and hard landscaping and other attributes of a
proposal are appropriate and respect the characteristics of the site and
surroundings.
16. The proposal would also comply with the North Somerset Biodiversity and
Trees Supplementary Planning Document which, amongst other things,
requires development to be successfully reconciled with the interests of the
biodiversity as well as the amenity of trees on the site and its surroundings.
Other Matters
17. The Council have highlighted that a double storey side extension, including
garages, was constructed at the appeal site and that the garages have since
been converted to living accommodation. Nevertheless, this does not preclude
the appellant’s need or desire to seek a parking solution that prevents damage
to the cars from Lime tree sap. For the reasons outlined above, the proposal
would not be harmful and consequently there is no basis on which to withhold
planning permission.
Conditions
18. In addition to the statutory time limit condition, it is necessary to specify the
plans in the interests of the character and appearance of the area. Given the
importance of the measures outlined in the submitted Method Statement and
TPP to the long term health of the trees, a condition should be imposed to
Appeal Decision APP/D0121/D/18/3209451
4
ensure strict adherence to it for the duration of construction works. As such, I
do not consider it necessary to seek the submission of a new, detailed
Arboricultural Method Statement Report with Tree Survey and Tree Protection
Plan as suggested by the Council.
19. Given the absence of details in connection with the sustainable drainage
system and its importance to the future health of the tree, it is necessary to
impose a condition to seek agreement of these details. The Council’s suggested
condition relating to landscaping ensures that there is adequate means of
securing replacement tree planting in the event of tree failure within ten years
of implementation of the landscaping scheme. This condition has also been
adopted in the interests of the character and biodiversity value of the area.
Conclusion
20. For the reasons given above, I conclude that the appeal should be allowed.
Hollie Nicholls
INSPECTOR
Schedule of Conditions
1) The development hereby permitted shall begin not later than 3 years from the
date of this decision.
2) The development hereby permitted shall be carried out in accordance with the
following approved plans: PL01E, PL02D and PL03.
3) Notwithstanding details that may be approved pursuant to other conditions, the
construction works shall adhere precisely to the methodology specified in the
approved Arboricultural Impact Assessment, Arboricultural Method Statement and
Tree Protection Plan, Revision A dated June 2018 (reference 180612-44SR-TPP-Rev
B-LI&AM).
4) The carport shall not be used until a sustainable drainage system has been
submitted to and approved in writing by the Local Planning Authority detailing the
means of ensuring an even distribution of surface water to areas affected by the
proposed development. The development shall be carried out in accordance with
the approved details and thereafter retained as such.
5) The carport shall not be used until a soft landscape scheme has been submitted
to and approved in writing by the Local Planning Authority showing details of all
trees, hedgerows and other planting to be retained; finished ground levels; a
planting specification to include numbers, density, size, species and positions of all
new trees and shrubs; and a programme of implementation. The landscaping
scheme shall be carried out in accordance with the approved details, specifications
and programme of implementation. Trees, hedges and plants shown in the
landscaping scheme to be retained or planted which, during the development
works or a period of ten years following full implementation of the landscaping
scheme, are removed without prior written consent from the Local Planning
Authority or die, become seriously diseased or are damaged, shall be replaced in
the first available planting season with others of such species and size as the
Authority may specify.
Expert Representation
Don't leave your appeal to chance.
Inspectors are inconsistent. We build a technical defense using precedents from our 182,000+ case archive.
No win, no fee Householder representation — you only pay if you win.