6m rear extension (from the original rear wall)

📊

See the success rate & inspector analytics

Free to view — just create an account, no payment needed.

Sign Up Free

Technical Issues Heatmap

Extensions
Fallback Position

Inspector’s Reasoning

Appeal Decision Site visit made on 10 December 2018 by A Parkin BA (Hons) DipTP MRTPI an Inspector appointed by the Secretary of State Decision date: 9 January 2019 Appeal Ref: APP/N5090/D/18/3208435 45 Garrick Avenue, London NW11 9AR  The appeal is made under section 78 of the Town and Country Planning Act 1990 against a refusal to grant approval required under Article 3(1) and Schedule 2, Part 1, Class A, Paragraph A.4 of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended).  The appeal is made by Mr M Kraus against the decision of the Council of the London Borough of Barnet.  The application Ref 18/3674/PNH, dated 8 June 2016, was refused by notice dated 22 June 2018.  The development proposed is a 6m rear extension (from the original rear wall). Decision 1. The appeal is dismissed. Application for costs 2. An application for costs was made by Mr M Kraus against the Council of the London Borough of Barnet. This application is the subject of a separate Decision. Preliminary Matter 3. The application form lists the postcode for the appeal property as NW11 9AS. However, the decision notice and the appeal form list the postcode as NW11 9AR, and I note that Royal Mail use this postcode for No 45 Garrick Avenue. I have therefore used this postcode in my decision. Main Issue 4. The main issue is whether the proposed development would be permitted under the terms of Schedule 2, Part 1, Class A of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) (the GPDO). Reasons 5. The appeal building is a semi-detached house, with a 2-storey, projecting bay feature to the rear. The rear bay feature projects at right angles from the main rear elevation of the building. The shape is then angled further towards the end of the bay, creating a five-sided feature that extends around one metre from the main rear wall of the house. The walls which project at right angles are constructed of brick. The first floor angled sides connected to the end of the bay are also constructed of brick, with a window in the end elevation. At Appeal Decision APP/N5090/D/18/3208435 2 ground floor level, the angled sides to the end of the bay are part brick and part window, with further windows and a door in the end elevation. 6. The proposed development would be a single storey, flat roofed, rear extension which would extend across the full width of the dwelling following the demolition of the projecting bay feature at ground floor level. It would have a depth of some six metres from the rear elevation of the dwelling and would be some three metres in height. The dimensions of the proposed extension are not disputed. 7. What is disputed is whether the bay feature at the rear of the building should be considered part of the rear elevation of the building, or whether the side walls of the bay feature should be considered as a side elevation wall, for the purposes of the GPDO. 8. Schedule 2, Part 1, Class A, Paragraph A.1 (j) (iii) of the GPDO states that development is not permitted by Class A if the enlarged part of the dwellinghouse would extend beyond a wall forming a side elevation of the original dwellinghouse, and would have a width greater than half the width of the original dwellinghouse. 9. The appellant has drawn my attention to parts of the Permitted Development Rights for Householders, Technical Guidance document1 (the Guidance), including to show how a bay window forms part of the (principal) elevation of a building, and to assert that this would apply equally to a rear elevation. This part of the Guidance relates to paragraph A.1 (e) of the GPDO concerning extensions that project beyond the principal elevation of the original dwelling or which front onto a highway and form a side elevation of the original dwelling. This part of the Guidance is not, therefore, directly relevant to the appeal before me, although I note the appellant’s comments and agree that a bay window can form part of an elevation, as set out in the Guidance. 10. The appellant also refers to the part of the Guidance that relates to paragraph A.1 (j) of the GPDO, and notes that a wall forming a side elevation of a house will be any wall that cannot be identified as being a front wall or a rear wall. The appellant’s case is that the bay feature is part of the rear elevation of the house and so the side walls identified by the Council are also part of the rear elevation and the proposal would therefore be permitted development with reference to paragraph A.1 (j). 11. However, this part of the Guidance also includes a diagram identifying walls forming a side elevation, which are at right angles to the main rear elevation. The bay feature walls that project at right angles from the main rear elevation of the appeal building are not dissimilar to the walls identified as side elevation walls on the diagram in the Guidance. In my view, as a result of their right angle projection from the rear elevation and their brick construction, these walls are side elevation walls for the purposes of the GPDO. 12. The appellant has drawn my attention to a recent appeal decision also in the London Borough of Barnet2. The appellant considers the Inspector in that case addressed the same sorts of issues as those in the appeal before me. 1 DCLG April 2017 2 Ref APP/N5090/D/17/3170532 Appeal Decision APP/N5090/D/18/3208435 3 13. Each appeal should be considered on its individual merits. Whilst I am not fully familiar with this other appeal, I note that the rear bay feature in that case differs from the one in the case before me in two significant ways. Firstly, that rear bay feature has three sides rather than five and does not contain any walls that project at right angles from the main rear elevation. Secondly, the Inspector in that case noted ‘the substantially glazed nature’ of that bay feature, which is shown on the submitted drawings for that appeal. The bay feature in the appeal before me has a significant brick component, in particular, the walls which project at right angles from the main rear elevation of the appeal building, which are constructed of brick, with no glazing. 14. The Inspector in that case concluded that the bay window was a part of the rear wall of the dwelling, rather than a side wall. However, given the significant differences between the design and construction of the bay features in the two dwellings identified above, I have given this decision very limited and non-determinative weight. 15. On the evidence before me and for the reasons set out above, the proposed development would extend beyond a wall forming a side elevation of the original building, and would span the full width of the rear elevation. It would not, therefore, be permitted development within the terms of Schedule 2, Part 1, Class A of the GPDO. Other Matters 16. I note the appellant’s interpretation of the Guidance, including as set out in paragraph 2.4 of their appeal statement, and the views of various people said to support this interpretation. My interpretation of the Guidance is different, as set out above, and these anecdotal views do not cause me to reach a different conclusion in relation to this appeal. Conclusion 17. For the reasons set out above I conclude that the appeal should be dismissed. Andrew Parkin INSPECTOR
£ Costs decision section
Costs Decision Site visit made on 10 December 2018 by A Parkin BA (Hons) DipTP MRTPI an Inspector appointed by the Secretary of State Decision date: 9 January 2019 Costs application in relation to Appeal Ref: APP/N5090/D/18/3208435 45 Garrick Avenue, London NW11 9AR  The application is made under the Town and Country Planning Act 1990, sections 78, 322 and Schedule 6, and the Local Government Act 1972, section 250(5).  The application is made by Mr M Kraus for a full award of costs against the Council of the London Borough of Barnet.  The appeal was against the refusal of planning permission for a 6m rear extension (from the original rear wall). Decision 1. The application for an award of costs is refused. Reasons 2. The Government’s Planning Practice Guidance (PPG) advises that costs may be awarded where a party has behaved unreasonably, and that this unreasonable behaviour has directly caused another party to incur unnecessary or wasted expense in the appeal process. 3. The applicant considers that the Council has behaved unreasonably in not determining similar cases in a similar manner. This is with specific regard to a decision that was allowed at appeal elsewhere in the London Borough of Barnet1. The applicant states that the other decision has not been challenged by the Council and considers that they therefore accept its findings. 4. The applicant notes that the Council did not reference this appeal decision in their officer report. The applicant drew this decision to the attention of the Council following the refusal of their prior approval application and offered the Council ‘the opportunity to change their mind through a new prior notification application’. However, no further action was taken in this regard. 5. The applicant also considers that the Council has not had regard to guidance which they consider supports their proposal, contained in the Permitted Development Rights for Householders, Technical Guidance document2 (the Guidance). 6. As I have set out in my appeal decision, there are significant differences between the appeal before me and the other appeal referred to by the applicant. I therefore gave that decision very limited and non-determinative weight. Furthermore, I also found that the proposal would not be permitted 1 Ref APP/N5090/D/17/3170532 2 DCLG April 2017 Costs Decision APP/N5090/D/18/3208435 2 development within the terms of Schedule 2, Part 1, Class A of the GPDO, including with reference to the Guidance, specifically the diagram in the section dealing with paragraph A.1 (j) of the GPDO. 7. Given the above, it is reasonable for the Council to have not paid regard to these matters in the manner suggested by the applicant. This has not resulted in costs to the applicant beyond what would normally be expected as part of the appeal process. 8. I therefore find that unreasonable behaviour by the Council, resulting in unnecessary or wasted expense, as described in PPG, has not been demonstrated. Conclusion 9. For the reasons given above, I conclude that an award of costs is not justified. Andrew Parkin INSPECTOR
Expert Representation

Don't leave your appeal to chance.

Inspectors are inconsistent. We build a technical defense using precedents from our 182,000+ case archive.
No win, no fee Householder representation — you only pay if you win.

Get Free Review How it works →