Single storey rear extension; hip to gable roof extension and front and rear dormers; erection of detached garage

📊

See the success rate & inspector analytics

Free to view — just create an account, no payment needed.

Sign Up Free

Technical Issues Heatmap

Rural Impact
Extensions
Character & Appearance

Inspector’s Reasoning

Appeal Decision Site visit made on 15 October 2018 by Martin Andrews MA(Planning) BSc(Econ) DipTP & DipTP(Dist) MRTPI an Inspector appointed by the Secretary of State Decision date: 1 November 2018 Appeal Ref: APP/P1425/D/18/3207477 Rocky Bank, Valebridge Road, Burgess Hill RH15 0RT  The appeal is made under section 78 of the Town and Country Planning Act 1990 against a refusal to grant planning permission.  The appeal is made by Mr Mark Parrott against the decision of Lewes District Council.  The application, Ref. LW/18/0184, dated 18 February 2018, was refused by notice dated 8 May 2018.  The development proposed is a single storey rear extension; hip to gable roof extension and front and rear dormers; erection of detached garage. Decision 1. The appeal is dismissed. Main Issue 2. The main issue is whether the proposed enlargement of the dwelling together with previous additions would be appropriate as regards the Council’s aim of maintaining a range of properties in the countryside and the effect of its appearance on the site and its surroundings. Reasons 3. The appeal dwelling is within the countryside for the purposes of the Council’s development plan. Extensions to such a dwelling ‘outside the planning boundary’ are therefore subject to Policy RES14 of the Lewes District Local Plan 2003. This includes the proviso that extensions in excess of 50% of the ‘original’ floorspace (defined as being in September 2008) will not normally be permitted. Supporting paragraph 5.39 for Policy RES14 says that ‘Care will be taken to ensure that any extensions do not result in loss of character of the main building by, for instance, a small cottage becoming a large house’ 4. In this case the Council says that the original dwelling’s floorspace was 76.3sqm but this was increased by about 48% through the implementation of a 1997 permission. On the Council’s calculation the appeal scheme would add a further 111sqm or thereabouts of habitable floorspace which it considers would dominate the existing building. And in respect of the original building it would alter the percentage increase in floorspace far beyond both the 48% already added and the 50% limit. 5. It seems to me therefore that both on an individual and cumulative basis the appeal proposal would increase the size of Rocky Bank to an extent that would be in clear breach of Policy RES14. The reference to the figure of 65% for an Appeal Decision APP/P1425/D/18/3207477 2 increase in floorspace (24% ground floor plus 41% first floor) in the grounds of appeal exceeding the 50% limit appears to be a misunderstanding, because the officer’s report explains that this is an increase on the existing already extended building and not the original. The actual percentage increase would therefore be much greater. 6. Furthermore, unless there are extenuating circumstances, this scale of the increase beyond the limit would be inherently harmful given that the policy is one relating to the principle of restraint for the stated purpose of maintaining a range of properties in the countryside. Referring back to paragraph 5.39 and noting also the proposals include the construction of a two storey garage with ancillary accommodation, I consider it reasonable to conclude that if the appeal scheme were to proceed, the original modest bungalow would have become a substantial house and this would have changed the character of the original building. 7. In this regard, as the policy is one of precluding the incremental erosion of small dwellings in the countryside, the appellants’ argument that there is already a wide range of dwellings in the area, including within the planning boundary in Burgess Hill, is not particularly relevant. Unless there is a demonstrable excess of supply of such dwellings, the objective of the policy remains valid. 8. In this context I agree that the fallback position of permitted development (pd) is a factor. However, for it to be given significant weight in this instance I consider that any calculations should be supported by a Lawful Development Certificates together with convincing evidence either that the pd alternative would be more harmful to the character and appearance of Rocky Bank or that a planning permission would be, for one reason or another, clearly more advantageous. I understand that it was these factors that were material in the permissions given at Valebridge on the adjoining plot to the north. (I also note that the recent application to Mid Sussex DC for a new dwelling on the Valebridge site has now been refused). 9. Turning to the Council’s site-specific objections, bearing in mind the significant increase above the policy threshold in the dwelling’s floorspace, I am not of the opinion that the planning histories of nearby sites are in themselves a reason for allowing the appeal on the basis of an inconsistent approach by the Council. Whether all the sites mentioned are the rural side of the planning boundary is not made clear, but nonetheless in addition to Valebridge mentioned above (where the Council was clear in explaining in its appraisal for that scheme why an exception had been made as regards size), the 4 dwelling permission at Double Bass was granted as long ago as 2002, before the adoption of the Local Plan. Other examples are not supported by floorspace figures and comparisons with the original buildings. 10. With that said, in regard to the alterations and additions to the dwelling and its effect on its surroundings, the grounds of appeal also refer to a number of other matters considered to support the application. In general terms I consider that the surroundings of the appeal site offer some support for the appellant’s case. Rocky Bank is part of a ribbon development extending northwards from Burgess Hill, and whilst not ‘suburban’ as the appellant claims, I do consider that it has a semi-rural rather than overtly rural character. Appeal Decision APP/P1425/D/18/3207477 3 11. Furthermore, the original character of modestly sized bungalows, assuming as seems likely that the original Rocky Bank was one of several dwellings of this type, has changed to a wide range of dwellings of different sizes and styles on this side of Valebridge Road. Bearing in mind this variety and the fact that the dwellings are in large plots set well back from the road and in some cases with a range of outbuildings, I consider that some flexibility of approach may be justified. This would be supported by the Government’s Planning Practice Guidance 2014 and National Planning Policy Framework 2018, particularly in relation to design detail which in any event could be improved through the Council engaging in negotiations. The Council uses the term ‘overdevelopment’ in the second refusal reason, but whilst this might be correct in relation to just the original dwelling, I do not consider that by any yardstick it can reasonably apply to the relationship of the proposed extended building with its extensive plot. 12. Overall, I conclude that the appeal must fail because there is an insufficient basis for its enlargement as regards the objective to maintain a range of dwelling sizes in the countryside as required by Local Plan Policy RES14. On the other issues raised in the grounds of appeal and the policies referred to, the scheme would benefit from some amendments. I do not though consider that the Council has demonstrated that there would inevitably be a harmful effect on the site and its surroundings. However, this does not outweigh my finding that the building would be cumulatively extended by an amount that would greatly exceed the floorspace increase allowed and change its character and size contrary to adopted policy. Unless and until the policy is changed or the planning boundary moved there would need to be a clear exposition of an additional and significant material consideration to weigh in the planning balance. 13. For the above reasons and having had regard to all other matters raised the appeal is dismissed. Martin Andrews INSPECTOR
Expert Representation

Don't leave your appeal to chance.

Inspectors are inconsistent. We build a technical defense using precedents from our 182,000+ case archive.
No win, no fee Householder representation — you only pay if you win.