Site visit made on 5 February 2019
by Jillian Rann BA (Hons) MSc MRTPI
an Inspector appointed by the Secretary of State
Decision date: 19 February 2019
Appeal Ref: APP/W5780/D/18/3207073
45 Aragon Drive, Ilford IG6 2TJ
• The appeal is made under section 78 of the Town and Country Planning Act 1990
against a refusal to grant approval required under Article 3(1) and Schedule 2, Part 1,
Class A, Paragraph A.4 of the Town and Country Planning (General Permitted
Development) (England) Order 2015 (as amended).
• The appeal is made by Mr Lakesh Krishna Moorthy against the decision of the Council of
the London Borough of Redbridge.
• The application Ref 2042/18, dated 17 May 2018, was refused by notice dated
27 June 2018.
• The development proposed is construction of a single storey rear extension (4.5m) with
flat roof.
Decision
1. The appeal is allowed and approval is granted under the provisions of
Article 3(1) and Schedule 2, Part 1, Class A, Paragraph A.4 of the Town and
Country Planning (General Permitted Development) (England) Order 2015 (as
amended) for the construction of a single storey rear extension (4.5m) with flat
roof at 45 Aragon Drive, Ilford IG6 2TJ. Approval is granted in accordance with
the application 2042/18, made on 17 May 2018 and the details submitted with
it, pursuant to Article 3(1) and Schedule 2, Part 1, Paragraph A.4(2).
Preliminary Matter
2. As there was a discrepancy between the drawing number of the Proposed Site
Plan provided by the Council and that which was supplied by the appellant, I
have sought clarification from the main parties. The appellant has confirmed
that the version supplied by the Council is the relevant drawing, used during
the application. I have therefore considered the appeal on the basis of the
version supplied by the Council.
3. For the avoidance of doubt, I have considered the appeal on the basis of the
following drawings: 1:1250 drawing reference TQRQM18137212030314;
Existing Layouts drawing 958/01; Existing Elevations 1 drawing 958/02;
Existing/Proposed Side Elevation drawing 958/03; Proposed Layouts drawing
958/04; Proposed Elevations drawing 958/05; and Proposed Site Plan drawing
958/06.
Main Issue
4. The main issue is whether the proposed development is permitted development
under Article 3(1) and Schedule 2, Part 1, Class A of the Town and Country
Appeal Decision APP/W5780/D/18/3207073
2
Planning (General Permitted Development) (England) Order 2015 (as
amended) (the GPDO).
Reasons
5. Paragraph A.1(i) of Part 1, Class A of the GPDO states that development is not
permitted by Class A if the enlarged part of the dwellinghouse would be within
2 metres of the boundary of the curtilage of the dwellinghouse, and the height
of the eaves of the enlarged part would exceed 3 metres.
6. The Permitted Development Rights for Householders Technical Guidance (the
Technical Guidance) states that, for the purpose of measuring height, the
eaves are the point where the lowest point of a flat roof meets the outside wall.
The Technical Guidance states that the height of the eaves will be measured
from the ground level at the base of the external wall of the extension to the
point where the external wall would meet the upper surface of the roof.
7. The Technical Guidance further states that references to height in the GPDO
relate to the height measured from ground level, noting that ground level is the
surface of the ground immediately adjacent to the building in question, and
would not include any addition laid on top of the ground such as decking.
8. The existing house is situated at a higher level than the rear part of the appeal
site, and the rear garden is laid out across two levels. The upper level is
located immediately to the rear of the existing house, level with the access
path which leads around the side of the building, and is formed of solid ground
supported by a retaining wall which separates it from the lower garden level in
the rear part of the site. Therefore, regardless of its height above the lower
garden level beyond, I am satisfied that this upper level forms the ground level
immediately to the rear of the appeal building, and does not comprise a ‘raised
platform’ or an addition laid on top of the ground level, as the Council appear
to suggest.
9. The proposed extension would be located entirely on the upper garden level
immediately to the rear of the existing house. The extension would be set back
from the retaining wall which separates that upper level from the lower garden
level beyond, and no part of it would adjoin that lower garden level.
Accordingly, and with reference to the GPDO and the Technical Guidance, I find
that it is from that upper ground level immediately adjacent to the proposed
extension that the eaves height should be measured, and not from the lower
garden level.
10. The application form and drawings state that the eaves height taken from the
(upper) ground level adjacent to the proposed extension would be 2.6m. The
Council’s report states that the eaves height would be 2.6m. Therefore, for the
reasons given, on the basis of the evidence before me and my own
observations, I am satisfied that the height of the eaves of the extension would
not exceed 3m above the surface of the ground immediately adjacent to it. The
proposed development would therefore fall within the limits of Paragraph
A.1(i).
11. Paragraph A.1(k) of Part 1, Class A of the GPDO states that development is not
permitted by Class A if it would consist of or include the construction or
provision of a raised platform. For the reasons given, I do not find that the
existing upper garden level comprises a raised platform. Nor would the
Appeal Decision APP/W5780/D/18/3207073
3
proposed development involve the construction or provision of a verandah,
balcony or raised platform. Therefore, the proposed development would not
conflict with the restrictions in Paragraph A.1(k).
12. For the reasons given, I therefore conclude that the proposed development
would comply with the express terms of permitted development set out in
Schedule 2, Part 1, Class A of the GPDO.
13. I have not been directed to any representations from any owner or occupier of
adjoining premises in response to the Council’s publicity of the application.
Therefore, I have not needed to go on to consider the effect of the proposed
development on the amenity of any adjoining premises in this instance.
Conclusion
14. For the reasons given, the appeal is allowed.
Jillian Rann
INSPECTOR
Expert Representation
Don't leave your appeal to chance.
Inspectors are inconsistent. We build a technical defense using precedents from our 182,000+ case archive.
No win, no fee Householder representation — you only pay if you win.