Single storey rear extension with an overall depth of 6m, a maximum height of 3.60m and an eaves height of 3m
📊
See the success rate & inspector analytics
Free to view — just create an account, no payment needed.
Sign Up FreeTechnical Issues Heatmap
Residential Amenity
Extensions
Inspector’s Reasoning
Appeal Decision
Site visit made on 10 May 2022
by David Cross BA(Hons) PgDip(Dist) TechIOA MRTPI
an Inspector appointed by the Secretary of State
Decision date: 23 May 2022
Appeal Ref: APP/B5480/D/21/3285949
95 Rush Green Road, Romford RM7 0PU
• The appeal is made under section 78 of the Town and Country Planning Act 1990
against a refusal to grant approval required under Article 3(1) and Schedule 2, Part 1,
Class A of the Town and Country Planning (General Permitted Development) (England)
Order 2015 (as amended) (the GPDO).
• The appeal is made by Mr Abul Hussain against the decision of the Council of the
London Borough of Havering.
• The application Ref Y0401.21, dated 9 August 2021, was refused by notice dated
17 September 2021.
• The development proposed is single storey rear extension with an overall depth of 6m,
a maximum height of 3.60m and an eaves height of 3m.
Decision
1. The appeal is dismissed.
Preliminary Matter
2. The description of the development provided on the application form has been
replaced by an amended version on the decision notice and in subsequent
appeal documents. I consider that subsequent description to accurately
represent the proposal and I have therefore used it within this decision.
Main Issue
3. The main issue is the effect of the proposal on the amenity of adjoining
premises with regard to outlook and light.
Reasons
4. The appeal site is part of a terrace of dwellings and includes a conservatory and
flat roofed offshoot to the rear. It is proposed to remove the conservatory and
offshoot and erect the proposed extension projecting from the main rear
elevation of the dwelling.
5. An objection to the proposal has been received from a resident of 97 Rush
Green Road which refers to the effect on outlook and light, amongst other
things. It is therefore necessary to consider the amenity of adjoining premises
in accordance with the provisions of the GPDO.
6. The extension would be located along the boundary with No 97. Due to the
degree of projection and the height of the proposal, it would appear as an
overbearing and obtrusive feature extending along the boundary. As a result of
Appeal Decision APP/B5480/D/21/3285949
2
its scale and location, the proposal would also lead to a significant degree of
overshadowing and loss of light to the amenity area to the rear of No 97,
including in respect of a glazed door and window on the main rear elevation
which serve a room within the dwelling.
7. The door and window at No 97 are already affected to a degree by ground floor
extensions at that property and the appeal site, which create a ‘tunnel’ effect
referred to by the Council. However, the proposal would project significantly
further to the rear than these existing extensions, with commensurate
unacceptable harm to the outlook and levels of light at No 97. The proposal
would also be significantly higher than the fence separating the two properties.
8. The Council refers to an SPD1 which sets out that rear extensions projecting
more than 3m should include a 45 degree set-back from the boundary. I am
mindful that the SPD pre-dates the provisions of the GPDO which relate to this
appeal. However, I consider that the guidance of the SPD is an appropriate
‘rule of thumb’ to assess the effect on amenity where it is appropriate to do so.
The proposal would not comply with the SPD in respect of rear extensions,
which supports my observations as to the harm to amenity arising from the
extension.
9. The garden of No 97 is relatively long, and a large extent of it would not be
affected by the proposal. However, this would not be sufficient to mitigate for
the harm to the amenity area closest to the dwelling as well as to the door and
window serving a habitable room.
10. There is a subjective element to the assessment of outlook and light. However,
the appellant has not provided substantive evidence which leads me to a
different conclusion on these matters. Reference is made to the Mayor of
London’s housing standards in respect of ceiling heights, but this does not
justify the projection of the proposal or the effect on the amenity of No 97.
11. The Council considers that the proposal would not lead to significant harm to
the amenity of residents of 93 Rush Green Road due to the presence of existing
extensions to the rear. However, this does not negate the harm I have
identified in respect of No 97.
12. There are other extensions to the rear of properties in this area, however it has
not been demonstrated that the circumstances that led to these being
approved or constructed are identical to the appeal before me. In any event, I
have determined this appeal on its own merits.
13. I am mindful of the appellant’s wish to improve accommodation at the
property. However, this private benefit is not sufficient to outweigh the harm
that I have identified to an adjoining property.
14. The appellant refers to the National Planning Policy Framework (the
Framework) and policy 7 of the Havering Local Plan. Insofar as they are
relevant to the main issue, the proposal would conflict with them in respect of
amenity and quality of life and due to the weight given to the identified harm.
The proposal would also be contrary to the guidance of the SPD in respect of
the design of rear extensions and the effect on amenity.
1 Residential Extensions and Alterations Supplementary Planning Document 2011 (SPD)
Appeal Decision APP/B5480/D/21/3285949
3
15. I conclude that due to its effect on residents of No 97 in respect of outlook and
light, the proposal would lead to significant harm to the amenity of an adjoining
premises. The appeal should therefore be dismissed.
David Cross
INSPECTOR
Expert Representation
Don't leave your appeal to chance.
Inspectors are inconsistent. We build a technical defense using precedents from our 182,000+ case archive.
No win, no fee Householder representation — you only pay if you win.