Breach of planning control as alleged in the notice is, without planning permission, the carrying out of development comprising; (i) The material change of use of land from a nil use to a use for equestrian purposes; (ii) The erection of two buildings labelled ‘1’ and ‘2’ on the plan attached to the notice; (iii) The installation of a hard surface facilitating access into the site and forming the bases of the unauthorised buildings;
📊
Borough Success Rate
In Guildford Borough Council, approx 31.8% of Change of use appeals are successful. (Sample: 66 cases).
Planzo Professional Representation
Technical Appeal Representation
This Change of use case requires a bespoke technical strategy. Contact us for a fixed-fee quotation.
Technical Issues Heatmap
Instant scan of technical battlegrounds available with a Day Pass.
Inspector Profile: Freer P
Archive Data: 21 Decisions
Allowance Rate (Change of use)
19.0%
↓ Strict
National Average (Change of use)
32.5%
Inspector's Analysis
https://www.gov.uk/planning-inspectorate
Appeal Decision
Site visit made on 12 April 2022
by Paul Freer BA (Hons) LLM PhD MRTPI
an Inspector appointed by the Secretary of State
Decision date: 06 May 2022
Appeal Ref: APP/Y3615/C/21/3281599
Land at Goal Farm, Gole Road, Pirbright, GU24 0PZ
• The appeal is made under section 174 of the Town and Country Planning Act 1990 (the
1990 Act…