← Back to Archive

Breach of planning control as alleged in the notice is, without planning permission, the carrying out of development comprising; (i) The material change of use of land from a nil use to a use for equestrian purposes; (ii) The erection of two buildings labelled ‘1’ and ‘2’ on the plan attached to the notice; (iii) The installation of a hard surface facilitating access into the site and forming the bases of the unauthorised buildings;

📊

Borough Success Rate

In Guildford Borough Council, approx 31.8% of Change of use appeals are successful. (Sample: 66 cases).

Planzo Professional Representation

Technical Appeal Representation

This Change of use case requires a bespoke technical strategy. Contact us for a fixed-fee quotation.

Book Free Review How it works →

Technical Issues Heatmap

Green Belt Character and Appearance Privacy
Keyword Heatmap Locked

Instant scan of technical battlegrounds available with a Day Pass.

Inspector Profile: Freer P

Archive Data: 21 Decisions
Allowance Rate (Change of use)
19.0% ↓ Strict
National Average (Change of use)
32.5%

Inspector's Analysis

https://www.gov.uk/planning-inspectorate Appeal Decision Site visit made on 12 April 2022 by Paul Freer BA (Hons) LLM PhD MRTPI an Inspector appointed by the Secretary of State Decision date: 06 May 2022 Appeal Ref: APP/Y3615/C/21/3281599 Land at Goal Farm, Gole Road, Pirbright, GU24 0PZ • The appeal is made under section 174 of the Town and Country Planning Act 1990 (the 1990 Act…

Full Analysis Locked

Unlock full text, site maps, and the evidence-ready PDF.

Unlock Case (£10)