← Back to Archive

Three phased development of SAFE St Mary's complex building, vacant land to the South and East bounded by railway line and canal basin; full planning permission is sought for phases one and two as follows; phase one included the demolition of the existing buildings on site and the development of a three storey arts hub building comprising accommodation for SAFE, flexible office/studio/meeting spaces, day nursery and multipurpose hall space alongside the erection of canal side

📊

Borough Success Rate

In Sefton Metropolitan Borough Council, approx 63.2% of Major dwellings appeals are successful. (Sample: 19 cases).

Planzo Professional Representation

Technical Appeal Representation

This Major dwellings case requires a bespoke technical strategy. Contact us for a fixed-fee quotation.

Book Free Review How it works →

Technical Issues Heatmap

Green Belt Character and Appearance Privacy
Keyword Heatmap Locked

Instant scan of technical battlegrounds available with a Day Pass.

Inspector Profile: Woodwards O

Archive Data: 33 Decisions
Allowance Rate (Major dwellings)
69.7% ↑ High
National Average (Major dwellings)
41.1%

Inspector's Analysis

https://www.gov.uk/planning-inspectorate Appeal Decision Hearing held on 19 July 2022 Site visit made on 20 July 2022 by O S Woodwards BA(Hons.) MA MRTPI an Inspector appointed by the Secretary of State Decision date: 13 September 2022 Appeal Ref: APP/M4320/W/21/3281083 Safe Regeneration Ltd, Waverley Street, Bootle L20 4AP • The appeal is made under section 78 of the Town and Cou…

Full Analysis Locked

Unlock full text, site maps, and the evidence-ready PDF.

Unlock Case (£10)