Without planning permission, the carrying out of operational development consisting of an engineering operation to approximately 1660 square metres of land involving: (a) The removal of a grassed area along with a substantial amount of topsoil (b) The laying of an underground drainage system and water supply pipework (c) The preparation for a hardstanding by importing, laying and levelling of a
📊
Borough Success Rate
In Braintree District Council, approx 55.6% of Other Major Developments appeals are successful. (Sample: 9 cases).
Planzo Professional Representation
Technical Appeal Representation
This Other Major Developments case requires a bespoke technical strategy. Contact us for a fixed-fee quotation.
Technical Issues Heatmap
Instant scan of technical battlegrounds available with a Day Pass.
Inspector's Analysis
https://www.gov.uk/planning-inspectorate
Appeal Decisions
Site visit made on 21 February 2023
by M Savage BSc (Hons) MCD MRTPI
an Inspector appointed by the Secretary of State
Decision date: 28 April 2023
Appeal A Ref: APP/Z1510/C/21/3279977
69 Halstead Road, Gosfield, Essex CO9 1PD
• Appeal A is made under section 174 of the Town and Country Planning Act 1990 as
amended. The ap…