Erection of a rear dormer with a door to replace the existing window in the rear roofslope; erection of screening and a balustrade in connection with the formation of a roof terrace at second floor level to the rear elevation; erection of a rear extension at first floor level, on top of the existing back addition to enclose the existing balcony area; installation of 1no. rooflight to the front elevation
📊
Borough Success Rate
In London Borough of Hammersmith and Fulham, approx 36.7% of Other minor developments appeals are successful. (Sample: 341 cases).
Planzo Professional Representation
Technical Appeal Representation
This Other minor developments case requires a bespoke technical strategy. Contact us for a fixed-fee quotation.
Technical Issues Heatmap
Instant scan of technical battlegrounds available with a Day Pass.
Inspector Profile: Wyborn D
Archive Data: 83 Decisions
Allowance Rate (Other minor developments)
28.9%
↓ Strict
National Average (Other minor developments)
32.5%
Inspector's Analysis
https://www.gov.uk/planning-inspectorate
Appeal Decision
Site visit made on 5 January 2022
by David Wyborn BSc(Hons) MPhil MRTPI
an Inspector appointed by the Secretary of State
Decision date: 13 January 2022
Appeal Ref: APP/H5390/W/21/3278389
Flat First floor, 72 Masbro Road, London W14 0LT
• The appeal is made under section 78 of the Town and Country Planning Act 1990
agains…