← Back to Archive

Without planning permission (i) the carrying out of engineering operations on the land by the creation of an engineered track and hardstanding area on existing bare earth track on agricultural land including the importation of materials and shown in the approximate position hatched blue on the plan attached to the notice (‘the Unauthorised Development’) and (ii) the change of use of the land from agriculture to a mixed use of agriculture and the storage of two (2) x

📊

Borough Success Rate

In Rother District Council, approx 32.4% of Change of use appeals are successful. (Sample: 71 cases).

Planzo Professional Representation

Technical Appeal Representation

This Change of use case requires a bespoke technical strategy. Contact us for a fixed-fee quotation.

Book Free Review How it works →

Technical Issues Heatmap

Green Belt Character and Appearance Privacy
Keyword Heatmap Locked

Instant scan of technical battlegrounds available with a Day Pass.

Inspector's Analysis

www.planningportal.gov.uk/planninginspectorate Appeal Decision Site visit made on 14 June 2022 by Sandra Prail MBE, MBA, LLB (Hons), Solicitor (non-practising) an Inspector appointed by the Secretary of State Decision date: 13 July 2022 Appeal Ref: APP/U1430/C/21/3276006 Land at Big Wood, east of London Road, Battle, East Sussex, TN32 5LX • The appeal is made under section …

Full Analysis Locked

Unlock full text, site maps, and the evidence-ready PDF.

Unlock Case (£10)