Without planning permission (i) the carrying out of engineering operations on the land by the creation of an engineered track and hardstanding area on existing bare earth track on agricultural land including the importation of materials and shown in the approximate position hatched blue on the plan attached to the notice (‘the Unauthorised Development’) and (ii) the change of use of the land from agriculture to a mixed use of agriculture and the storage of two (2) x
📊
Borough Success Rate
In Rother District Council, approx 32.4% of Change of use appeals are successful. (Sample: 71 cases).
Planzo Professional Representation
Technical Appeal Representation
This Change of use case requires a bespoke technical strategy. Contact us for a fixed-fee quotation.
Technical Issues Heatmap
Instant scan of technical battlegrounds available with a Day Pass.
Inspector's Analysis
www.planningportal.gov.uk/planninginspectorate
Appeal Decision
Site visit made on 14 June 2022
by Sandra Prail MBE, MBA, LLB (Hons), Solicitor (non-practising)
an Inspector appointed by the Secretary of State
Decision date: 13 July 2022
Appeal Ref: APP/U1430/C/21/3276006
Land at Big Wood, east of London Road, Battle, East Sussex, TN32 5LX
• The appeal is made under section …