← Back to Archive

Demolition of the existing building and redevelopment by erection of a ground and part four, part 5, part 6, part 7 upper floors for a mixed residential (Class C3) comprising 76 units (44 x 1bed; 26 x 2bed and 6 x 3bed) and commercial (Class B1(a)) uses comprising 696m2, together with ancillary parking space for 10 cars, cycle and bin stores and landscaped communal court at first floor level and landscaped communal roof terraces

📊

Borough Success Rate

In London Borough of Ealing, approx 53.8% of Major dwellings appeals are successful. (Sample: 13 cases).

Planzo Professional Representation

Technical Appeal Representation

This Major dwellings case requires a bespoke technical strategy. Contact us for a fixed-fee quotation.

Book Free Review How it works →

Technical Issues Heatmap

Green Belt Character and Appearance Privacy
Keyword Heatmap Locked

Instant scan of technical battlegrounds available with a Day Pass.

Inspector Profile: Wilders B

Archive Data: 21 Decisions
Allowance Rate (Major dwellings)
38.1% ↓ Strict
National Average (Major dwellings)
41.1%

Inspector's Analysis

https://www.gov.uk/planning-inspectorate Appeal Decision Inquiry Held on 9 to 11, 16 to 18 & 30 November, 7 & 13 December 2021 and 7 January 2022 Site visit made on 11 January 2022 by Beverley Wilders BA (Hons) PgDurp MRTPI an Inspector appointed by the Secretary of State Decision date: 11 April 2022 Appeal Ref: APP/A5270/W/21/3275781 54-58 Stanley Gardens, Acton W3 7SZ • The a…

Full Analysis Locked

Unlock full text, site maps, and the evidence-ready PDF.

Unlock Case (£10)