Replacement of roof to excising out buildings, built in 2003. The roof needed replacing due to structural damage, weather damage and water leaks. The existing roof comprised of a timber frame with polycarbonate plastic clear sheets and roofing felt shingle covering. The replacement roof consists of steel purlins and a box profile steel roofing sheets. The increased height to the middle of the roof is to allow rain water to run freely off the roof. Increased length to the West elevation was to align
📊
Borough Success Rate
In Chichester District Council, approx 42.0% of Householder developments appeals are successful. (Sample: 119 cases).
Planzo Professional Representation
Don't leave your appeal to chance.
Inspectors are inconsistent. We build a technical defense using precedents from our 182,000 archive.
Fixed-fee Householder representation for £750.
Technical Issues Heatmap
Instant scan of technical battlegrounds available with a Day Pass.
Inspector Profile: Reid J
Archive Data: 46 Decisions
Allowance Rate (Householder developments)
13.0%
↓ Strict
National Average (Householder developments)
35.3%
Inspector's Analysis
https://www.gov.uk/planning-inspectorate
846
Appeal Decision
Site Visit made on 23 September 2021
by J Reid BA(Hons) BArch(Hons) RIBA
an Inspector appointed by the Secretary of State
Decision date: 06 October 2021
Appeal Ref: APP/L3815/D/21/3275601
The Coach House, 2 Manor Road, Selsey PO20 0SD
• The appeal is made under section 78 of the Town and Country Planning Act 199…