Appeal Decision
Site visit made on 15 March 2022
by Robert Fallon B.Sc. (Hons) PGDipTP MRTPI
an Inspector appointed by the Secretary of State
Decision date: 1 June 2022
Appeal Ref: APP/B1930/D/21/3275166
6 Prospect Road, St Albans, AL1 2AX
• The appeal is made under section 78 of the Town and Country Planning Act 1990
against a refusal to grant planning permission.
• The appeal is made by Mr James Parker against the decision of St Albans City & District
Council.
• The application Ref 5/21/0533 dated 22 February 2021, was refused by notice dated 20
April 2021.
• The development proposed is for a single storey rear extension following demolition of
the existing single storey rear extension and insertion of rooflights.
Decision
1. The appeal is allowed and planning permission is granted for a single storey
rear extension following demolition of the existing single storey rear extension
and insertion of rooflights at 6 Prospect Road, St Albans, AL1 2AX in
accordance with the terms of the application, Ref 5/21/0533, dated 22
February 2021, subject to the conditions set out in the attached schedule.
Application for costs
2. An application for costs was made by Mr James Parker against St Albans City &
District Council. This application is the subject of a separate decision.
Procedural matter
3. Since the appeal was submitted, a revised version of the Framework1 has been
published. Both main parties were given the opportunity to comment on this,
but no responses were received.
Main issue
4. The Council has raised no concerns regarding the impact of the development
on the character and appearance of the conservation area and existing local
listed building and I see no reason to take a different view.
5. The main issue is the effect of the development on living conditions, with
specific regard to whether it would dominate and appear overbearing to the
occupants of No 8 Prospect Place (‘No 8’).
1 National Planning Policy Framework, Ministry of Housing, Communities and Local Government, July 2021.
Appeal Decision APP/B1930/D/21/3275166
2
Reasons
6. The appeal site contains an attractive local listed 2-storey semi-detached
Victorian dwelling within the St Albans Conservation Area.
7. The existing circa 2-metre high boundary fence is in close proximity to, and
clearly visible from, the ground floor rear and side elevation windows of No. 8.
I recognise that the side elevation wall of the proposed extension and its
sloping roof would be taller than the fence, but this additional height and mass
would be viewed against the backdrop of the 2-storey element of the existing
rear outrigger of No 6 and the taller 3-storey side elevation of Ramryge Court.
As a consequence, I do not consider that the proposed extension would appear
any more dominant and overbearing to the occupants of No 8 than these
existing structures and that the impact on living conditions would therefore be
neutral.
8. The Council states that the extension exceeds the 3-metre limit set out in
Policy 72 of the Local Plan2. Although I consider this figure to be a good ‘rule of
thumb’ for assessing the acceptability of many single storey rear extensions
(particularly those where an adjoining property is of a modest size, has a flush
building line and does not have any rear extensions/projections), there will on
occasion be circumstances where a larger depth of extension might be suitable,
as is the case with the current scheme. However, the wording of Policy 72
allows for such exceptions as it states that such extensions should not normally
extend more than 3 metres ie it does not apply this restriction in all cases. As a
consequence, I consider this policy to be flexible and broadly consistent with
the Framework insofar as it relates to the main issue of the case.
9. In view of the above, I conclude that the development would not be harmful to
the living conditions of the occupiers of No. 8. The proposal would therefore
accord with Policies 69 and 72 of the Local Plan, which seek, amongst other
things, to ensure that residential extensions do not unacceptably harm the
amenity of an adjoining property.
10. I also find that the scheme accords with Paragraph 130 of the Framework
which seeks, amongst other things, to ensure that development creates places
with a high standard of amenity for existing users.
11. A condition has been imposed to ensure the scheme is carried out in
accordance with the approved plans. I have also attached a condition regarding
the materials and brick bond to be used to ensure that the appearance of the
development is satisfactory.
Conclusion
12. In view of the above, having had regard to all other matters raised, I conclude
that the appeal should be allowed.
Robert Fallon
INSPECTOR
2 St Albans District Plan, City and District of St Albans District Local Plan Review, Adopted 30 November 1994,
Written Statement.
Appeal Decision APP/B1930/D/21/3275166
3
Schedule of conditions
1) The development hereby permitted shall begin not later than 3 years from the
date of this decision.
2) The development hereby permitted shall be carried out in accordance with the
following approved plans and details:- Drawing nos. 2024/0S, 2024/01-1,
2024/01-2, 2024/02-1C, 2024/02-2B
3) No development above slab level shall take place until details/samples of the
materials to be used in the construction of the external surfaces of the
extension hereby permitted have been submitted to and approved in writing by
the local planning authority. The development shall thereafter be carried out in
accordance with the approved details/samples. The external walls of the
extension herby permitted shall be constructed in a brick bond to match that on
the 2-storey rear elevation of the existing dwelling.
End of Schedule
£
Costs decision section
Costs Decision
Site visit made on 15 March 2022
by Robert Fallon B.Sc. (Hons) PGDipTP MRTPI
an Inspector appointed by the Secretary of State
Decision date:1 June 2022
Costs application in relation to Appeal Ref: APP/B1930/D/21/3275166
6 Prospect Road, St Albans, AL1 2AX
• The application is made under the Town and Country Planning Act 1990, sections 78,
322 and Schedule 6, and the Local Government Act 1972, section 250(5).
• The application is made by Mr James Parker for a full award of costs against St Albans
City & District Council.
• The appeal was against the refusal of planning permission for a single storey rear
extension following demolition of the existing single storey rear extension and insertion
of rooflights.
Decision
1. The application for an award of costs is refused.
Reasons
2. The Planning Practice Guidance (PPG) advises that costs may be awarded
where:
• a party has behaved unreasonably; and
• the unreasonable behaviour has directly caused another party to incur
unnecessary or wasted expense in the appeal process.
3. The PPG clarifies that unreasonable behaviour may either be procedural or
substantive. Although an application for costs may relate to events before the
appeal, the PPG states that costs unrelated to the appeal are not eligible for an
award.
4. The application for costs by the appellant is based on substantive and
procedural grounds in that it alleges the Council acted unreasonably in; - (1)
preventing development that should clearly be permitted, based on a rigid
application of planning policy in a manner inconsistent with other planning
application and appeal decisions; (2) failing to act upon the agent’s statement
of fact that No 8 had no objections or concerns; and (3) failing to work
positively and proactively with the Agent to seek an approval, via minor
amendments in a manner consistent with other applications.
5. In accordance with section 38(6) of the 2004 Act1 and section 70(2) of the
1990 Act2, applications for planning permission must be determined in
accordance with the development plan unless material considerations indicate
otherwise. The starting point of decision-making is therefore plan-led.
1 Planning and Compulsory Purchase Act 2004
2 Town and Country Planning Act 1990 (as amended)
Costs Decision APP/B1930/D/21/3275166
2
6. The PPG states that where a local planning authority has exercised their duty to
determine planning applications in a reasonable manner, it should not be liable
for an award of costs. It also states that where a planning application has been
refused for a proposal that is not in accordance with development plan policy,
and no material considerations including national policy indicate that planning
permission should have been granted, there should generally be no grounds for
an award of costs against the local planning authority for unreasonable refusal
of an application.
Ground 1: Preventing development that should clearly be permitted, based on a
rigid application of planning policy in a manner inconsistent with other planning
application and appeal decisions
7. Although it will be seen from the appeal decision that I disagree with the
grounds upon which the Council refused the application, I am nonetheless
satisfied that it was not unreasonable for it to have formed the conclusion it did
based on an objective analysis of the scheme against development plan policy.
8. The appellant states that there were other rear extensions in the area that
were approved by the Council or allowed at appeal and that the Council was
not therefore consistent in its approach. In particular, they are frustrated
because these other extensions were not only of a similar height and depth
when measured at the party boundary, but in some cases even larger than the
appeal scheme.
9. However, whilst I agree that these other extensions were similar to the scheme
before me in terms of their position adjacent to a party boundary, none of
them were identical in form, scale and design and neither did they provide an
immediate local context to the appeal scheme or help define the character of
the area. In any event, whilst I recognise that consistency is important in
planning, a decision-maker is entitled to reach a different conclusion if they can
provide a sound planning justification for doing so.
10. In summary, the Council’s duty was to determine the application in accordance
with the development plan unless material considerations indicated otherwise.
It did this in an objective, fair and impartial manner and I do not consider the
conclusion reached to be unreasonable. The fact that there were similar
extensions elsewhere was not the only issue for the Council to consider and in
any event, their existence did not justify the Council approving another scheme
that it perceived to be harmful to the living conditions of neighbouring
occupiers.
11. In view of the above, I do not agree with the appellant that the Council
prevented or delayed development that should clearly have been permitted and
as a consequence, the application for costs on this substantive ground fails.
Ground 2: Failing to act upon the agent’s statement of fact that No 8 had no
objections or concerns
12. Although the agent informed the Council that the occupiers of No 8 did not
have any objections, this does not in itself demonstrate a lack of harm and
does not alter my view that the development before me was a finely balanced
matter. It was a matter of professional judgement for the case officer in their
role as decision-maker on behalf of the Council, after having conducted an
objective analysis of the scheme, to determine what impact it may have. In
Costs Decision APP/B1930/D/21/3275166
3
any event, there is no legal requirement for the Council to pursue responses
from neighbours after the relevant consultation period has ended – in this case,
the neighbour at No 8 had the opportunity to submit comments to the Council
but chose not to do so.
13. Set against this context, it is important to reiterate that applications for
planning permission must be determined in accordance with the development
plan unless material considerations indicate otherwise; – representations from
interested parties may be capable of forming a material consideration, but they
will not be the sole determinative issue in their own right.
14. In view of the above, I do not agree with the appellant that the Council should
have acted upon the agent’s statement of fact that the occupier of No 8 had no
objections. The application for costs on this substantive ground therefore also
fails.
Ground 3: Failing to work positively and proactively with the Agent to seek an
approval, via minor amendments in a manner consistent with other applications
15. The appellant states that the Council failed to work positively and proactively
with them to seek an approval, via minor amendments in a manner consistent
with other applications. However, the appropriate time for the appellant to
have sought to discuss the proposal with the Council was at the pre-application
stage, as outlined by the Framework3 and PPG4. In this respect, I note that no
pre-application enquiry was submitted by the appellant, despite this service
being available to them. I am as a consequence satisfied that the appellant did
have adequate opportunity to discuss the current scheme with the Council at
the pre-application stage, which might have highlighted any potential areas of
concern, but chose not to do so.
16. Furthermore, Section 70 of the 1990 Act states that where an application is
made to a local planning authority, it may grant or refuse planning permission.
This legislation does not impose a legal duty upon a local planning authority to
enter into discussions with an applicant to resolve problems in a ‘live’
application that would otherwise result in a subsequent refusal of planning
permission.
17. This is further reinforced by the PPG5 which states that while it is possible for
both the applicant and local planning authority to suggest changes to a ‘live’
application before it has been determined, it is at the discretion of the latter as
to whether to accept such changes or determine whether the proposed changes
are so significant as to materially alter the proposal such that a new application
should be submitted. The local planning authority is not therefore under any
obligation to accept amended plans, which to my mind does not support the
view that it is required to work proactively with applicants during a ‘live’
application.
18. Moreover, it seems to me that if local planning authorities were required to
work proactively with applicants during a ‘live’ application to address all
matters in dispute, this would then negate the need for any pre-application
discussions to take place at all and enable applicants to avoid paying the
3 Paragraphs 39 to 43, National Planning Policy Framework, Ministry of Housing, Communities and Local
Government, 20 July 2021.
4 Paragraph: 001 Reference ID: 20-001-20190315, Revision date: 15 03 2019
5 Paragraph 061, Reference ID: 14-061-20140306, Revision date: 06 03 2014
Costs Decision APP/B1930/D/21/3275166
4
appropriate fee where a charging regime is in place. It would also enable
applicants to evolve schemes without paying an additional fee during the
application process, at additional cost to the Council and taxpayer (the Council
having received only one application fee to determine the submission). This is
not what the Framework and PPG advocates.
19. To my mind, the duty imposed on local planning authorities6 to “work
proactively with applicants to secure developments that will improve the
economic, social and environmental conditions of the area” does not therefore
oblige them to engage in discussions during a ‘live’ planning application in all
circumstances. This would especially be the case for applications where a
problem has arisen for which: - (a) the local planning authority does not
consider there to be a solution as it relates to an ‘in-principle’ matter; (b)
would necessitate the submission of a materially different scheme to overcome
the matters in dispute; and (c) those cases where no pre-application enquiry
was submitted which would have given the parties an early opportunity to
attempt to resolve the issues concerned. In the current appeal, it seems to me
that the dispute between the parties relating to the height and depth of the
extension and its proximity to the site boundary was an ‘in-principle’ matter
and could not have been resolved to satisfaction of the Council.
20. The above duty is therefore discharged in most circumstances by local planning
authorities working proactively with applicants at the outset, before a scheme
has been finalised and during a collaborative pre-application process where an
appropriate and proportionate level of engagement can take place with
consultees and neighbours. However, in those circumstances where the Council
has been unable to offer such a pre-application service, the current system
does allow for it to be discharged through a collaborative process agreed to by
both parties via an extension of time to a live planning application or within a
Planning Performance Agreement.
21. In view of the above, I am satisfied that the Council did not behave
unreasonably in not seeking amendments to the scheme which ultimately
resulted in the specified reason for refusal. The application for costs on this
procedural ground therefore fails.
Unnecessary or wasted expense
22. Given my conclusions on the allegations of unreasonable behaviour, the matter
of unnecessary or wasted expense does not need to be considered.
Conclusion
23. I therefore find that unreasonable behaviour resulting in unnecessary or
wasted expense, as described in the Planning Practice Guidance, has not been
demonstrated.
Robert Fallon
INSPECTOR
6 Paragraph 38 of the Framework
Expert Representation
Don't leave your appeal to chance.
Inspectors are inconsistent. We build a technical defense using precedents from our 182,000+ case archive.
No win, no fee Householder representation — you only pay if you win.