Erection of an 18 metre high Phase 8 telecommunications pole with built-in cabinet, 3no. separate cabinets and ancillary works
📊
Borough Success Rate
In London Borough of Tower Hamlets, approx 18.2% of Other minor developments appeals are successful. (Sample: 258 cases).
Planzo Professional Representation
Technical Appeal Representation
This Other minor developments case requires a bespoke technical strategy. Contact us for a fixed-fee quotation.
Technical Issues Heatmap
Instant scan of technical battlegrounds available with a Day Pass.
Inspector Profile: Robbie G
Archive Data: 111 Decisions
Allowance Rate (Other minor developments)
36.0%
↑ High
National Average (Other minor developments)
32.5%
Inspector's Analysis
https://www.gov.uk/planning-inspectorate
Appeal Decision
Site visit made on 9 November 2021
by G Robbie BA(Hons) BPl MRTPI
an Inspector appointed by the Secretary of State
Decision date: 17th January 2022
Appeal Ref: APP/E5900/W/21/3274487
Area of Footpath, The Highway, St George in the East, London E1W 2BB
Easting: 534600 Northing: 180706
• The appeal is made under sect…