← Back to Archive

Urban Reserve Flexible Energy Facility and associated equipment

📊

Borough Success Rate

In Adur District Council, approx 33.3% of Minor general industry/storage/warehousing appeals are successful. (Sample: 3 cases).

Planzo Professional Representation

Technical Appeal Representation

This Minor general industry/storage/warehousing case requires a bespoke technical strategy. Contact us for a fixed-fee quotation.

Book Free Review How it works →

Technical Issues Heatmap

Green Belt Character and Appearance Privacy
Keyword Heatmap Locked

Instant scan of technical battlegrounds available with a Day Pass.

Inspector Profile: Reid J

Archive Data: 3 Decisions
Allowance Rate (Minor general industry/storage/warehousing)
0.0% ↓ Strict
National Average (Minor general industry/storage/warehousing)
37.1%

Inspector's Analysis

https://www.gov.uk/planning-inspectorate 842 Appeal Decision Site Visit made on 2 September 2021 by J Reid BA(Hons) BArch(Hons) RIBA an Inspector appointed by the Secretary of State Decision date: 04 October 2021 Appeal Ref: APP/Y3805/W/21/3274190 Blenheim Power, 62 Marough Road, Lancing Business Park, Lancing BN15 8UQ • The appeal is made under section 78 of the Town and …

Full Analysis Locked

Unlock full text, site maps, and the evidence-ready PDF.

Unlock Case (£10)