← Back to Archive

Development comprising up to 250 residential dwellings, associated infrastructure, ancillary facilities, open space and landscaping; demolition of existing buildings; creation of new vehicular access from Harp Hill

📊

Borough Success Rate

In Cheltenham Borough Council, approx 53.8% of Major dwellings appeals are successful. (Sample: 13 cases).

Planzo Professional Representation

Technical Appeal Representation

This Major dwellings case requires a bespoke technical strategy. Contact us for a fixed-fee quotation.

Book Free Review How it works →

Technical Issues Heatmap

Green Belt Character and Appearance Privacy
Keyword Heatmap Locked

Instant scan of technical battlegrounds available with a Day Pass.

Inspector Profile: Nunn M

Archive Data: 22 Decisions
Allowance Rate (Major dwellings)
59.1% ↑ High
National Average (Major dwellings)
41.1%

Inspector's Analysis

https://www.gov.uk/planning-inspectorate Appeal Decision Inquiry opened on 7 September 2021 Accompanied site visit made on 4 March 2022 by Matthew Nunn BA BPl LLB LLM BCL MRTPI an Inspector appointed by the Secretary of State Decision date: 5th October 2022 Appeal Ref: APP/B1605/W/21/3273053 Land at Oakley Farm, Cheltenham • The appeal is made under section 78 of the Town and…

Full Analysis Locked

Unlock full text, site maps, and the evidence-ready PDF.

Unlock Case (£10)