← Back to Archive

Breach of planning control as alleged in the notice is, without planning permission, the change of use of the land to use for the mixed use of agriculture and as a camping and caravanning site beyond the scope of what is permitted by Class B and BA of Part 4 to Schedule 2 and Class A of Part 5 [to Schedule 2] of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) (“the Order”)

📊

Borough Success Rate

In Scarborough Borough Council *, approx 0.0% of Change of use appeals are successful. (Sample: 3 cases).

Planzo Professional Representation

Technical Appeal Representation

This Change of use case requires a bespoke technical strategy. Contact us for a fixed-fee quotation.

Book Free Review How it works →

Technical Issues Heatmap

Green Belt Character and Appearance Privacy
Keyword Heatmap Locked

Instant scan of technical battlegrounds available with a Day Pass.

Inspector Profile: Harbottle M

Archive Data: 20 Decisions
Allowance Rate (Change of use)
35.0% ↑ High
National Average (Change of use)
32.5%

Inspector's Analysis

https://www.gov.uk/planning-inspectorate Appeal Decisions Hearing held on 22 March 2022 Site visit made on 22 March 2022 by Mark Harbottle BSc MRTPI an Inspector appointed by the Secretary of State Decision date: 06 May 2022 Appeal A Ref: APP/H2733/C/21/3272750 Appeal B Ref: APP/H2733/C/21/3272751 Land adjacent to The Dotterel Inn, Reighton, Filey YO14 9RU • The appeals ar…

Full Analysis Locked

Unlock full text, site maps, and the evidence-ready PDF.

Unlock Case (£10)