← Back to Archive

Breach of planning control as alleged in the notice is, without planning permission, the material change of use of the Land from agricultural use to residential use, and the carrying out of operational development to facilitate the aforesaid unauthorised material change of use comprising of the construction on the Land of a building occupied as a dwelling (in the approximate position shown cross hatched in black on the Plan) and incidental structures (in the approximate position shown hatched in black on the Plan)

📊

Borough Success Rate

In Buckinghamshire Council - South Bucks Area *, approx 25.0% of Change of use appeals are successful. (Sample: 20 cases).

Planzo Professional Representation

Technical Appeal Representation

This Change of use case requires a bespoke technical strategy. Contact us for a fixed-fee quotation.

Book Free Review How it works →

Technical Issues Heatmap

Green Belt Character and Appearance Privacy
Keyword Heatmap Locked

Instant scan of technical battlegrounds available with a Day Pass.

Inspector Profile: Whitfield J

Archive Data: 33 Decisions
Allowance Rate (Change of use)
33.3% ↑ High
National Average (Change of use)
32.5%

Inspector's Analysis

https://www.gov.uk/planning-inspectorate D Appeal Decisions Site Visit made on 9 October 2024 By J Whitfield BA(Hons) DipTP MRTPI an Inspector appointed by the Secretary of State Decision date: 24th January 2025 Appeal A Ref: APP/N0410/C/21/3272389 Land on the East Side of Pyebush Lane, Beaconsfield, Buckinghamshire • The appeal is made under section 174 of the Town and Country Plan…

Full Analysis Locked

Unlock full text, site maps, and the evidence-ready PDF.

Unlock Case (£10)