Demolition of single storey flank extension and erection of reduced width two storey flank extension together with Dormer windows and internal alterations
📊
See the success rate & inspector analytics
Free to view — just create an account, no payment needed.
Sign Up FreeTechnical Issues Heatmap
Green Belt Policy
Extensions
Policy Weight
Inspector’s Reasoning
Appeal Decision
Site visit made on 23 September 2021
by Gary Deane BSc (Hons) DipTP MRTPI
an Inspector appointed by the Secretary of State
Decision date: 12 October 2021.
Appeal Ref: APP/G2245/D/21/3270994
Lilac Bank, Billet Hill, Ash TN15 7HE
• The appeal is made under section 78 of the Town and Country Planning Act 1990
against a refusal to grant planning permission.
• The appeal is made by Mr John Murray against the decision of Sevenoaks District
Council.
• The application Ref 20/03495/HOUSE, dated 25 November 2020, was refused by notice
dated 1 February 2021.
• The development proposed is the demolition of single storey flank extension and
erection of reduced width two storey flank extension together with Dormer windows and
internal alterations.
Decision
1. The appeal is allowed and planning permission is granted for the demolition of
single storey flank extension and erection of reduced width two storey flank
extension together with Dormer windows and internal alterations at Lilac Bank,
Billet Hill, Ash TN15 7HE in accordance with the terms of the application
Ref 20/03495/HOUSE, dated 25 November 2020, subject to the conditions set
out in the schedule to this decision.
Procedural matter
2. An application for costs was made by the appellant against the Council. This
application will be the subject of a separate decision.
Main issue
3. The site lies within the Green Belt. The main issue is whether or not the
proposal would be inappropriate development in the Green Belt having regard
to the National Planning Policy Framework (the Framework) and relevant
development plan policies.
Reasons
4. The proposal is primarily to erect a two-storey extension at the side of Lilac
Bank, which is a detached dwelling set back from the road within a generous
plot with good sized gardens. The existing single storey side projection with a
flat roof and external steps would be demolished and removed to make way for
the new addition.
5. The submitted plans also show that a small dormer would be placed onto the
front roof slope of the main house. A short flat roof above the front entrance
Appeal Decision APP/G2245/D/21/3270994
2
would also be replaced with a pitched roof supported by timber posts to form
an open-sided porch.
Whether inappropriate development
6. The Framework states that the construction of new buildings in the Green Belt
is inappropriate. Exceptions to this are listed in paragraph 149, which include
the extension or alteration to existing buildings provided it does not result in
disproportionate additions over and above the size of the original building
(criterion c). The Framework does not define the term disproportionate.
7. Policy GB1 of the Council’s Allocations and Development Management Plan
(ADMP) notes that extensions to an existing dwelling should, amongst other
things, be proportional to the original dwelling (criterion b). It also adds that
for extensions to be acceptable, the total floor space of the proposal, together
with any previous extensions, alterations and outbuildings, should not result in
an increase of more than 50% above the floor space of the original dwelling
(criterion c). The Council’s Supplementary Planning Document, Development
in the Green Belt, (SPD) echoes these requirements.
8. The Council has accepted that it determined the size of the original dwelling
with reference to the planning history of the wrong property. Given this
admission, I am unable to place any reliance on the estimates of floor area set
out in the Officer’s report or its numerical assessment of proportionality. That
is because the starting point of the exercise, which is to establish the size of
the original building, is incorrect.
9. In its subsequent analysis, the Council states that it considers that the single
storey flat roof element at the side of the existing dwelling is not original,
which is based on a review of its internal historic mapping system. It also
reflects the Council’s observations that the windows, brickwork and roof form
of the existing single storey side projection noticeably differ to those of the
2-storey house. The appellant appears to share this opinion and, from my
inspection of the building, so do I.
10. The Council appears to conclude, therefore, that the building, as it currently
stands, is not original although it has provided few details to support this
assertion. That ambiguity may be due, in part, to the Council’s record of the
site’s planning history, which it says are incomplete with the plans
accompanying the grant of planning permission1 for the erection of a dwelling
on the site missing. The appellant states that the dwelling on the site was
originally constructed as a chalet bungalow with first floor bedrooms and a
bathroom, which is supported in correspondence from a relative of the original
builders. There is no indication of the building’s size as originally built at that
time.
11. From what I saw, the 2-storey element of the existing building visually ‘reads’
as a single and largely cohesive entity, with no obvious sign of significant
enlargement aside from the single storey flat roof side projection, which is to
be replaced. On that basis, and in the light of the submissions made by both
parties, I consider that the 2-storey house should be regarded as the original
building for the purpose of this assessment.
1 Application Reference T/5/55/128
Appeal Decision APP/G2245/D/21/3270994
3
12. There are no reliable estimates of floor area before me in relation to the
existing building, as a whole or in part. Nevertheless, a visual comparison
between the proposed 2-storey extension and the 2-storey host building, as
shown on the plans, indicates that the new addition is unlikely to exceed the
50% size threshold identified under ADMP Policy GB1 (c). Given their modest
size, the addition of a new front dormer and an open sided porch, as proposed,
would not alter my finding on this point.
13. The Officer’s report also refers to the Council’s recent decision2 to approve a
single storey flat roof extension following the demolition of existing
conservatory. Few details of this scheme have been provided and it is unclear
whether or not it will come forward. Even if it did in combination with the
proposal before me, I doubt that the cumulative effect would be so great as to
result in the existing 2-storey building increasing in size by more than one half.
14. Taking all of the above points into account, I conclude on the main issue that
the proposal would not constitute a disproportionate addition over and above
the size of the original building. Therefore, the new development falls under
the exemption listed in paragraph 149 (c) of the Framework. On that basis, it
is not inappropriate development in the Green Belt and there is no conflict with
ADMP Policy GB1 or the Council’s SPD in that regard. As a result, a
consideration of the need to demonstrate very special circumstances to justify
the development is unnecessary.
15. Implicit in my finding on this main issue is that the proposed development
should not be regarded as harmful either to the openness of the Green Belt or
to the purposes of including land within it. To that extent, ADMP Policy GB1
(b), which additionally requires that extensions do not materially harm the
openness of the Green Belt, is out of step with the Framework. Because the
Framework reflects current Government policy, I place greater weight on it for
the purpose of this appeal.
Other matters
16. The proposed extension would result in a dwelling with wider 2-storey front and
rear elevations. Even so, the proposal would be a proportionate addition. With
the removal of the long single storey side element, which contributes little
positively to the appearance of the house, the proposal would introduce greater
balance to the finished dwelling with the existing 2-storey forward projection
more centrally placed in the front façade. Having regard to the overall size and
mass of the completed dwelling, the new 2-storey extension would not appear
overly large, bulky or visually intrusive. Combined with the use of matching
external materials and a consistent pattern of fenestration the proposal would
relate well to the host building. It would be a sympathetic addition.
17. To my mind, the proposal achieves the standard of design sought by the
Framework with a cohesive style across the finished building, unlike the
existing property with its incongruous single storey side projection. These
outcomes would not necessarily be achieved if the new extension were to be
designed as a subordinate element to the original house. In those
circumstances, a conflict with ADMP Policy GB1 (b), which states that
extensions should be subservient to the original dwelling, is insufficient in itself
to withhold planning permission.
2 Application Reference 20/02730/LDCPR
Appeal Decision APP/G2245/D/21/3270994
4
Conditions
18. In addition to the standard time limit condition, I have imposed a condition
specifying the relevant drawings and to require that the development is carried
out in accordance with them as this provides certainty. To ensure the
satisfactory appearance of the building, a condition is imposed to require that
the external materials match those of the existing building.
19. A condition that removes some permitted development rights is justified to
maintain the openness of the Green Belt and to ensure that the appearance of
the development is satisfactory. These conditions reflect those suggested by
the Council with minor changes made for clarity.
Conclusion
20. For the reasons set out above and having regard to all other matters raised, I
conclude that the appeal should be allowed.
Gary Deane
INSPECTOR
Schedule of conditions
1) The development hereby permitted shall begin not later than three years from
the date of this decision.
2) The development hereby permitted shall be carried out in accordance with the
following approved plans: Refs 1, 2 and the Location Plan that shows the site
edged red.
3) The materials to be used in the construction of the external surfaces of the
development hereby permitted shall match those used in the existing building.
4) Notwithstanding the provisions of the Town and Country Planning (General
Permitted Development) Order 1995 (or any order revoking or re-enacting that
order), no development (as defined by Section 55 of the Town and Country
Planning Act 1990) as may otherwise be permitted by Classes A to E (inclusive)
of Part 1 of Schedule 2 of the Order shall be carried out.
£
Costs decision section
Costs Decision
Site visit made on 23 September 2021
by Gary Deane BSc (Hons) DipTP MRTPI
an Inspector appointed by the Secretary of State
Decision date: 12 October 2021.
Costs application in relation to Appeal Ref: APP/G2245/D/21/3270994
Lilac Bank, Billet Hill, Ash TN15 7HE
• The application is made under the Town and Country Planning Act 1990, sections 78,
322 and Schedule 6, and the Local Government Act 1972, section 250(5).
• The application is made by Mr John Murray for a full award of costs against Sevenoaks
District Council.
• The appeal was made against the refusal of planning permission for the demolition of
single storey flank extension and erection of reduced width two storey flank extension
together with Dormer windows and internal alterations.
Decision
1. The application for an award of costs is allowed in the terms set out below.
Reasons
2. The Planning Practice Guidance (PPG) advises that costs may be awarded
against a party who has behaved unreasonably and thereby caused the party
applying for costs to incur unnecessary or wasted expense in the appeal
process. The PPG provides examples of the behaviour that could give rise to an
award of costs against a Local Planning Authority (LPA). One such example is a
failure to provide evidence to substantiate each reason for refusal. Another
example is where the LPA makes vague, generalised or inaccurate assertions
about a proposal’s impact, which are unsupported by any objective analysis.
3. In determining the application and having particular regard to Policy GB1 of the
Allocations and Development Management Plan (ADMP), the Council found the
proposal to be a disproportionately large addition and harmful to the openness
of the Green Belt (GB). However, in doing so, the Council made an error that
may have been material to the outcome of the planning decision. It has also
failed to take the opportunity to clearly explain its objections.
4. Firstly, the Council states that the proposal would exceed the 50% size
threshold for dwelling extensions in the Green Belt (GB), which is set out in
ADMP Policy GB1. However, the numerical assessment of proportionality in the
Officer’s report is based on the planning history of the wrong property. The
Council has apologised for that error. However, its judgement at that time was
clearly based on inaccurate information.
5. While the Council’s reply to the costs application refers to a historic (undated)
map and differences in the construction and appearance of the flat roof side
Costs Decision APP/G2245/D/21/3270994
2
projection at Lilac Bank compared to the main 2-storey dwelling, it does not
provide an estimate of the proposal’s size relative to the host building, as
originally constructed or with later additions. Without that information, it is
unclear exactly how the Council would still conclude that the proposal would
breach the 50% size threshold and therefore give rise to a conflict with ADMP
Policy GB1. This is important because the outcome could determine whether or
not the proposal could be an exception to inappropriate development in the GB
under the Framework.
6. Secondly, the reason for refusal states that the proposal would result in a
significant increase in mass, bulk and scale and that it would be harmful to the
openness of the GB. Few details have been provided to elucidate this opinion
other than generally describing the proposal as a ‘considerably large extension
to the dwelling’. There is no explicit recognition in the Officer’s report, for
instance, that the proposal would remove a sizeable side extension and occupy
a reduced footprint, as the description of development makes clear. Both of
these elements would also affect the openness of the GB.
7. Thirdly, even if the proposal was regarded to be a disproportionate addition in
the context of ADMP Policy GB1 and harmful to the openness of the GB it does
not automatically mean that it is unacceptable. It is still necessary to establish
whether the harm by reason of inappropriateness, and any other harm, would
be clearly outweighed by other considerations so as to amount to the very
special circumstances required to justify the proposal. There is no indication
from the evidence that the Green Belt ‘balancing exercise’ was carried out.
8. For all of these reasons, I consider that the Council has behaved unreasonably.
It has failed to clearly show why the proposal should not proceed and has not
substantiated the reason for refusal. The Council’s evidence does not provide a
respectable basis for its stance. It has prevented a scheme that for the reasons
given in my decision should have been permitted. The applicant has had to
recourse to appeal and incur the associated costs of doing so, which in my
opinion could and should have been avoided. Therefore, unreasonable
behaviour resulting in unnecessary or wasted expense, as described in the PPG,
has been demonstrated. A full award of costs is therefore justified.
Costs Order
9. In exercise of the powers under section 250(5) of the Local Government Act
1972 and Schedule 6 of the Town and Country Planning Act 1990 as amended,
and all other enabling powers in that behalf, IT IS HEREBY ORDERED that
Sevenoaks District Council shall pay to Mr John Murray, the costs of the appeal
proceedings described in the heading of this decision.
10.The applicant is now invited to submit to Sevenoaks District Council, to whom a
copy of this decision has been sent, details of those costs with a view to
reaching agreement as to the amount. In the event that the parties cannot
agree on the amount, a copy of the guidance note on how to apply for a
detailed assessment by the Senior Courts Costs Office is enclosed.
Gary Deane
INSPECTOR
Expert Representation
Don't leave your appeal to chance.
Inspectors are inconsistent. We build a technical defense using precedents from our 182,000+ case archive.
No win, no fee Householder representation — you only pay if you win.