← Back to Archive

Outline consent (with landscaping reserved) for the demolition of the existing Palm Hills complex and redevelopment of the site to provide 81 dwellings (15x1b, 8x2b, 49x3b and 9x4b) with associated car parking, landscaping and amended access onto London Road

📊

Borough Success Rate

In Bracknell Forest Borough Council, approx 45.8% of Major dwellings appeals are successful. (Sample: 24 cases).

Planzo Professional Representation

Technical Appeal Representation

This Major dwellings case requires a bespoke technical strategy. Contact us for a fixed-fee quotation.

Book Free Review How it works →

Technical Issues Heatmap

Green Belt Character and Appearance Privacy
Keyword Heatmap Locked

Instant scan of technical battlegrounds available with a Day Pass.

Inspector Profile: Rose P

Archive Data: 16 Decisions
Allowance Rate (Major dwellings)
62.5% ↑ High
National Average (Major dwellings)
41.1%

Inspector's Analysis

https://www.gov.uk/planning-inspectorate Appeal Decision Inquiry held on 8, 9 and 10 June 2021 Site visits made on 24 May and 15 June 2021 by Peter Rose BA MRTPI DMS MCMI an Inspector appointed by the Secretary of State Decision date: 12 July 2021 Appeal Ref: APP/R0335/W/21/3267437 Palm Hills Complex, London Road, Chavey Down, Berkshir…

Full Analysis Locked

Unlock full text, site maps, and the evidence-ready PDF.

Unlock Case (£10)