Appeal Decision
Site Visit made on 9 March 2021
by David Murray BA (Hons) DMS MRTPI
an Inspector appointed by the Secretary of State
Decision date: 12 March 2021
Appeal Ref: APP/P0119/D/20/3265311.
Lance House, Inglestone Common, BADMINTON, GL9 1BS.
• The appeal is made under section 78 of the Town and Country Planning Act 1990
against a refusal to grant planning permission.
• The appeal is made by Mr & Mrs Giles Bleaken against the decision of South
Gloucestershire Council.
• The application Ref. P20/19020/F, dated 2 October 2020, was refused by notice dated
30 November 2020.
• The development proposed is a front extension to Lance House.
Decision
1. The appeal is allowed and planning permission is granted for proposed front
extension at Lance House, Inglestone Common, BADMINTON, GL9 1BS in
accordance with the terms of the application, Ref P20/19020/F, dated 5
October 2020, and the plans submitted with it, subject to the conditions set out
in the attached Schedule.
Main Issue
2. The main issue is the effect of the proposal on local biodiversity, having
particular regard to bats.
Reasons
Background
3. The appeal site comprises a two storey property with the upper floor mostly in
the roof space lit by dormer windows, which lies in a hamlet of properties in the
countryside. It is proposed to add a single storey lean-to extension to the
south elevation at the front of the property and a two storey gable feature with
glazed front.
4. The Council is satisfied with the design and form of the extension. The
outstanding issue is the consideration of the effect on bats. Bats and their
roosts are protected by the Conservation of Habitats and Species Regulations
2017 and the Wildlife and Countryside Act 1981 (as amended).
Effect on habitat of protected species
5. The proposal includes a detailed Bat Survey Report (BSR) undertaken by Smart
Ecology in July 2020. This was required because the proposed extensions
would involve the removal of a small porch and a gabled dormer and the
temporary breach into the main roof space behind the dormer. The
Preliminary Roost Assessment identified that a bat roost was present in the
main roof space and other parts of the building had features with moderate
likelihood of roosting bats. Two dusk emergence / dawn re-entry surveys
Appeal Decision APP/P0119/D/20/3265311
2
confirmed that two roosts would be affected by the proposal. Primarily, Roost
1 would be destroyed by the demolition of the front porch; Regarding Roost 2 –
the proposed works would damage or destroy the roost by undertaking works
to the roof close to a dormer window. Other identified roosts would not be
directly affected by the proposed building work. The BSR sets out a mitigation
strategy which includes (in general terms) ‘soft’ demolition of features where
roosting bats could be present; ecological supervision of the demolition; and
provision of compensatory roosts.
6. The Council’s case is that given the presence of bats as revealed in the BSR
and surveys, the Council Ecologist advises that the presence and movement of
bats have to be appraised in more detail with a third bat emergence/ re-entry
survey. Such a survey is seasonally restricted and can only be undertaken
between May and August. Moreover, the Council relies on guidelines issued by
the Bat Conservation Trust in support of the need for a third survey.
7. However, it is not clear why a third survey is needed. The appellant stresses
that the BSR and two surveys were undertaken by a qualified ecologist and
refers to the BCT good practice guidance which says that ‘roost characterisation
surveys should continue until sufficient surveys have been carried out to gain
the information required’ without specifying a minimum number. In the main
this is a judgement call for the qualified specialist. Having regard to the
evidence submitted on the appeal, including the copies of correspondence with
Natural England, I am satisfied that appropriate survey work has been
undertaken. Moreover, the building work proposed is relatively limited with
specific impacts on the recognised roosts identified and the BSR recommends
detailed and necessary mitigation. This mitigation can be required to be
implemented by planning conditions as recommended by the Council.
8. I conclude that with the conditions recommended, the development proposed
would not be detrimental to maintaining the population of the species at a
favourable conservation status in its natural range. Subject to a suitable
licence from Natural England, the proposal would comply with the regulatory
requirements identified above. In terms of the development plan, I find no
conflict with the provisions of Policy PSP19 of the South Gloucestershire Local
Plan – Policies Sites and Places Plan (2017), or Policy CS9 of the South
Gloucestershire Local Plan Core Strategy.
9. In addition to conditions requiring the implementation of the mitigation
specified in the BSR, and the issue of a licence, a condition requiring the
submission of a scheme regarding external lighting is reasonable and necessary
given the local presence of bats and I will impose this condition as
recommended but modify it to ensure that it is enforceable.
Conclusion
10. For the reasons given above I conclude that the appeal should be allowed.
David Murray
INSPECTOR
Appeal Decision APP/P0119/D/20/3265311
3
Schedule of conditions
1. The development hereby permitted shall begin not later than 3 years
from the date of this decision.
2. The development shall proceed in strict accordance with the Mitigation
Measures provided in the Preliminary Bat Roost Assessment and a Bat
Survey Report (Smart Ecology, September 2020)
3. Prior to the first occupation of the extension approved, details of any
external sensitively designed lighting is to be submitted to the local
authority for review. This is to include specification and location of any
lighting to be installed. Thereafter, only lighting that accords with the
approved scheme shall be installed at Lance House.
4. Prior to commencement of works, a copy of the EPS licence is to be
submitted to the local authority. It is usual that all ecological conditions
must be discharged prior to applying for a licence however under Clause
9.3 and Annex D6.1 of BS42020:2013 Planning conditions and European
Protected Species Licences, a condition can be put in place for the
request of an EPS licence.
5. Evidence of ecological enhancements are to be submitted to the local
authority prior to the first use of the extension permitted, this is including
but not limited to a bat box. The enhancements shall be installed within
one month of being agreed by the Council and retained thereafter.
Expert Representation
Don't leave your appeal to chance.
Inspectors are inconsistent. We build a technical defense using precedents from our 182,000+ case archive.
No win, no fee Householder representation — you only pay if you win.