← Back to Archive

Engineering operations comprising the ongoing formation (through movement of material such as soil, rubble, rocky fill and loose rock, its deposit, compaction and moulding) of an artificial, man- made platform feature without the benefit of planning permission

📊

Borough Success Rate

In Peak District, approx 42.7% of Other minor developments appeals are successful. (Sample: 110 cases).

Planzo Professional Representation

Technical Appeal Representation

This Other minor developments case requires a bespoke technical strategy. Contact us for a fixed-fee quotation.

Book Free Review How it works →

Technical Issues Heatmap

Green Belt Character and Appearance Privacy
Keyword Heatmap Locked

Instant scan of technical battlegrounds available with a Day Pass.

Inspector Profile: Madge M

Archive Data: 7 Decisions
Allowance Rate (Other minor developments)
42.9% ↑ High
National Average (Other minor developments)
32.5%

Inspector's Analysis

https://www.gov.uk/planning-inspectorate Appeal Decision Site visit made on 25 May 2021 by M Madge DipTP, MA MRTPI an Inspector appointed by the Secretary of State Decision date: 2nd July 2021 Appeal Ref: APP/M9496/C/20/3263527 Land at Withamley House Farm, Bradfield, Sheffield 26 6HY • The appeal is made under section 174 of the Town and Country Planning Act 1990 as amended by the…

Full Analysis Locked

Unlock full text, site maps, and the evidence-ready PDF.

Unlock Case (£10)