← Back to Archive

Amended development proposed is demolition of barns, and residential development of up to 30 dwellings, including the creation of new vehicular and pedestrian access, public open space, landscape planting, pumping station, electricity substation, surface water attenuation, and associated infrastructure (landscape and appearance reserved for future consideration)

📊

Borough Success Rate

In Dorset, approx 36.4% of Major dwellings appeals are successful. (Sample: 55 cases).

Planzo Professional Representation

Technical Appeal Representation

This Major dwellings case requires a bespoke technical strategy. Contact us for a fixed-fee quotation.

Book Free Review How it works →

Technical Issues Heatmap

Green Belt Character and Appearance Privacy
Keyword Heatmap Locked

Instant scan of technical battlegrounds available with a Day Pass.

Inspector Profile: Harley S

Archive Data: 24 Decisions
Allowance Rate (Major dwellings)
20.8% ↓ Strict
National Average (Major dwellings)
41.1%

Inspector's Analysis

https://www.gov.uk/planning-inspectorate Appeal Decision Hearing Held on 18 and 19 May 2021 Site Visit made on 19 May 2021 by S Harley BSc(Hons) M.Phil MRTPI ARICS an Inspector appointed by the Secretary of State Decision date: 16th July 2021 Appeal Ref: APP/D1265/W/20/3259557 Land at E381099 N102326 Catherines Well, Milton Abbas, Dorset DT11 0AZ • The appeal is made u…

Full Analysis Locked

Unlock full text, site maps, and the evidence-ready PDF.

Unlock Case (£10)