This is a work in progress - The steep land dropping from the rear of the dwelling recently cleared of undergrowth to allow for its usability, however in the process of terracing the garden the drop in levels was such as to necessitate the construction of a mid-point retaining wall. Also in flattening the far section a high plateau relative to No. 240's rear garden was created
📊
See the success rate & inspector analytics
Free to view — just create an account, no payment needed.
Sign Up FreeTechnical Issues Heatmap
Residential Amenity
Character & Appearance
Policy Weight
Inspector’s Reasoning
Appeal Decision
Site visit made on 22 January 2021
by Michael J Muston BA(Hons) MPhil MRTPI
an Inspector appointed by the Secretary of State
Decision date: 04 February 2021.
Appeal Ref: APP/D5120/D/20/3258944
238 Woolwich Road, London SE2 0DW
• The appeal is made under section 78 of the Town and Country Planning Act 1990
against a refusal to grant planning permission.
• The appeal is made by Mr K Singh against the decision of the Council of the London
Borough of Bexley.
• The application Ref 19/02706/FUL, dated 5 November 2019, was refused by notice
dated 19 August 2020.
• The development proposed was originally described as “This is a work in progress - The
steep land dropping from the rear of the dwelling recently cleared of undergrowth to
allow for its usability, however in the process of terracing the garden the drop in levels
was such as to necessitate the construction of a mid-point retaining wall. Also in
flattening the far section a high plateau relative to No. 240's rear garden was created.
This rear section of land is similarly retained by a retaining wall proposed to be overlain
by a close boarded timber boundary. It is intended to dig this section of the garden out,
reducing the height by approximately 2.12m. This is shown the amended drawing
1816:SK:A1:05 which indicates how it is intended the land levels would be graduated
with installation of a series of steps and the removal of the breeze block mid-point
retaining wall. Moreover the reduction in the land level at the rear of the garden will
allow for the rear fence line at No. 236 and 240 to be continued at a similar height. the
works will allow for the garden to blend in with those of the immediate neighbouring
properties, thereby dispensing the stark contrast.”
Decision
1. The appeal is allowed and planning permission is granted for the retention of
alterations to ground levels and partial retention of retaining walls, the
provision of new/altered retaining walls, boundary fencing, construction of
steps and terracing of the rear garden with associated planting, including
excavation works, at 238 Woolwich Road, London SE2 0DW, in accordance with
the terms of the application, Ref 19/02706/FUL, dated 5 November 2019, and
the plans submitted with it, subject to the following conditions:
1) The development hereby permitted shall be carried out in accordance
with the following approved plans: 051018/topo, 1816:SK:A1:04,
1816:SK:A2:01 (received 27/03/2020) and 1816:SK:A0:16 Rev. A
(received 10/06/2020).
2) All exposed surfaces of the retaining walls shall be painted RAL 9001
(cream) in colour, or such other colour as may be agreed in writing with
the local planning authority.
3) Within one calendar month of the date of this decision, a timetable,
demonstrating how the works will be carried out in full, within a four
month period immediately following the approval of that timetable, shall
Appeal Decision APP/D5120/D/20/3258944
2
be submitted for the written approval of the local planning authority.
The approved scheme shall then be carried out and completed in
accordance with the approved timetable.
Procedural Matter
2. The development was described on the application form as set out in the
heading above. This was amended by the Council, to “Retention of alterations
to ground levels and partial retention of retaining walls. Provision of
new/altered retaining walls, boundary fencing, construction of steps and
terracing of the rear garden with associated planting, including excavation
works.”. This is also the description used by the appellant on his appeal form,
and describes the works more succinctly than the original description. I have
therefore used this amended description as the basis for my decision.
Main Issues
3. The main issues are the effect of the proposed development on:-
• the character and appearance of the area; and
• the living conditions of occupiers of adjacent dwellings, with particular
regard to overbearing impact and visual intrusion.
Reasons
Character and appearance
4. A previous appeal (APP/D5120/D/19/3233845) in relation to development in
the garden of this property was dismissed in 2019, with the Inspector noting
that the works, some of which had already taken place, resulted in a platform
that sat much higher than the neighbouring garden of No 240 and the level of
the adjacent woodland. That Inspector concluded that, by reason of its
material and height, it formed “a particularly prominent and visually intrusive
feature both when viewed from the neighbouring garden and the woodland”.
5. The current appeal proposal is essentially a modification of the scheme
dismissed in that 2019 appeal. The proposal now includes a reduction in the
height of the retaining walls around the platform, and the erection of a 2.4
metre high close-boarded fence along the common boundaries with No 240 and
with Lesnes Abbey Woods to the rear. This fence would be visible from both
the neighbouring garden and the woods to the rear. Other examples of close-
boarded fencing can already be seen from both these viewpoints and, although
higher than these, the proposed fencing would not look out of place in its
context. Once the platform is reduced in height to the levels proposed, the
fence would screen it from view. The amendments proposed in this appeal
proposal would avoid the harm caused by the previous appeal proposal.
6. I conclude that the proposal would not have an unacceptably adverse effect on
the character or appearance of the area, and would comply with Policy ENV39
of the London Borough of Bexley Unitary Development Plan (2004) (UDP) in
this respect. This policy seeks, amongst other things, development that is
compatible with the character of the surrounding area.
Appeal Decision APP/D5120/D/20/3258944
3
Living conditions
7. The Council considers that the retaining walls would have an unduly
overbearing and visually intrusive impact on the occupiers of No 240, when
using their rear garden. However, I agree with the Council officer’s report to
Committee that the proposals to lower the platform and erect a higher fence on
the boundary would obscure views of the retaining walls.
8. The reduction in the level of the platform close to the boundary with No 240,
and the erection of the proposed 2.4 metre high fencing along the common
boundary would remove the vast majority of the overlooking from the platform
over the neighbouring garden. It would leave some overlooking of No 240’s
garden, but no more than exists in many adjoining gardens located on a slope.
I agree with the Inspector in the previous appeal that “there would be no harm
to the living conditions of the occupiers of No 236”.
9. I conclude that the proposal would not have an unacceptably adverse effect on
the living conditions of occupiers of adjacent dwellings, and would comply with
Policy ENV39 of the UDP in this respect. This policy seeks, amongst other
things, development that would not prejudice the environment of the occupiers
of adjacent property.
Conditions
10. As well as a standard condition requiring compliance with the approved plans,
the Council has also suggested a condition requiring all exposed surfaces of the
retaining walls to be painted RAL 9001 (cream) in colour. I agree that a
condition along these lines is necessary, in the interests of the character and
appearance of the area, in the event that any of the retaining wall is still visible
from outside the site. However, there are other colours that would be
acceptable beyond cream, and I have added a clause to allow an alternative to
be agreed if appropriate.
11. The Council is also suggesting a condition that requires the agreement of a
timetable within which works must be completed, failing which the permission
would effectively cease to have effect. I agree with the need to require the
agreement of a timetable to secure the completion of the works contained
within the appeal proposal. However, the other suggested elements of
condition 2 do not meet the test of being reasonable. If the works are not
completed in time, the Council could serve a breach of condition notice. or
continue with enforcement action against those elements of the previously
refused scheme that remain on site. I have therefore imposed an amended
version of that suggested condition.
Conclusions
12. For the reasons set out above, I conclude that the appeal should be allowed,
subject to the conditions set out above.
Michael J Muston
INSPECTOR
£
Costs decision section
Costs Decision
Site visit made on 22 January 2021
by Michael J Muston BA(Hons) MPhil MRTPI
an Inspector appointed by the Secretary of State
Decision date: 04 February 2021.
Costs application in relation to Appeal Ref: APP/D5120/D/20/3258944
238 Woolwich Road, London SE2 0DW
• The application is made under the Town and Country Planning Act 1990, sections 78,
322 and Schedule 6, and the Local Government Act 1972, section 250(5).
• The application is made by Mr K Singh for a full award of costs against the Council of
the London Borough of Bexley.
• The appeal was made against the refusal to grant permission for the retention of
alterations to ground levels and partial retention of retaining walls, the provision of
new/altered retaining walls, boundary fencing, construction of steps and terracing of the
rear garden with associated planting, including excavation works.
Decision
1. The application for an award of costs is refused.
Reasons
2. The Planning Practice Guidance (the PPG) advises that costs may be awarded
where a party has behaved unreasonably, and where the unreasonable
behaviour has directly caused another party to incur unnecessary or wasted
expense in the appeal process.
3. The PPG makes it clear that planning authorities are at risk of an award of
costs against them if they prevent or delay development which should clearly
be permitted, having regard to the development plan, national policy and any
other material considerations. As examples of behaviour that may give rise to
a substantive award of costs against a local planning authority, the PPG also
lists vague, generalised or inaccurate assertions about a proposal’s impact,
which are unsupported by any objective analysis, and not determining similar
cases in a consistent manner.
4. The applicant argues that the Council has determined the appeal scheme and
other proposals at neighbouring properties in an inconsistent manner, and that
Councillors at the Committee meeting that determined the application
appeared to be prejudiced against the proposal and applicant, did not
understand that the proposal included alterations to the work on site, and
raised irrelevant/inaccurate matters.
Costs Decision APP/ D5120/D/20/3258944
2
5. The applicant has also raised concerns regarding the way the enforcement
process was handled. However, unreasonable behaviour and any resulting
wasted expense that can be the subject of this award of costs decision is
limited to that incurred in this appeal process, so cannot include the financial
implications of the process surrounding the issuing of the enforcement notice
or the decision taken by the Council to prosecute for non-compliance with that
notice.
6. The webcast of the Committee meeting that determined this planning
application is not before me in evidence. If the allegations made by the
applicant as to the comments made by some Councillors at that meeting, and
some of the language used, are accurate, they may suggest a prejudice against
the proposal. However, I cannot verify these allegations.
7. In any event, whatever was discussed at the meeting, the reasons for refusal
related to relevant material considerations. The fact that I have found against
the Council in relation to the two main issues does not necessarily mean that
the reasons for refusal were unreasonable. I could understand that concern
regarding the visual impact of the scheme from adjoining land was not
unreasonable, and these concerns were supported by specific and reasoned
evidence put forward by the Council in defending the appeal.
8. I note that the reasons for refusal in relation to this planning application were
identical to two of the three reasons advanced in relation to that previously
dismissed at appeal. I have considered whether this indicated a lack of
understanding from the Committee that the proposal before them in the latest
scheme involved a significant element of proposed work, and that the resulting
works on site would therefore be materially different from those previously
refused. However, it is clear in the Council’s submitted case in relation to the
resulting appeal that the differences between the two schemes was
appreciated.
9. I was able to see the works permitted at No 240 on my site visit. I could see
that, given the topography of the land, the two proposals were not the same as
each other, and would have resulted in different effects on neighbouring land.
I do not consider that this is a case where similar cases were determined in an
unreasonably inconsistent manner.
10. I therefore find that unreasonable behaviour resulting in unnecessary or
wasted expense, as described in the PPG, has not been demonstrated.
Michael J Muston
INSPECTOR
Expert Representation
Don't leave your appeal to chance.
Inspectors are inconsistent. We build a technical defense using precedents from our 182,000+ case archive.
No win, no fee Householder representation — you only pay if you win.