Part single storey, part two storey rear extension

📊

See the success rate & inspector analytics

Free to view — just create an account, no payment needed.

Sign Up Free

Technical Issues Heatmap

Green Belt Policy
Extensions
Trees & Landscape

Inspector’s Reasoning

Appeal Decision Site visit made on 29 September 2020 by Martin Chandler BSc MA MRTPI an Inspector appointed by the Secretary of State Decision date: 16 October 2020 Appeal Ref: APP/B1930/D/20/3256258 105 Harper Lane, Shenley, Radlett WD7 9HG • The appeal is made under section 78 of the Town and Country Planning Act 1990 against a refusal to grant planning permission. • The appeal is made by Mr Arnold against the decision of St Albans City & District Council. • The application Ref 5/20/0991, dated 23 April 2020, was refused by notice dated 24 June 2020. • The development proposed is a part single storey, part two storey rear extension. Decision 1. The appeal is allowed, and planning permission is granted for a part single storey, part two storey rear extension at 105 Harper Lane, Shenley, Radlett WD7 9HG, in accordance with application ref. 5/20/0991, dated 23 April 2020 and subject to the following conditions. 1) The development hereby permitted shall begin not later than three years from the date of this decision; 2) The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing building; 3) The development hereby permitted shall be carried out in accordance with the following drawing numbers: 1920/OS; 1920/02-1B; 1920/02-2B; and 1920/02-3. Application for costs 2. An application for costs was made by Mr Arnold against St Albans City and District Council. This application is the subject of a separate Decision. Main Issue 3. The appeal site is located within the Green Belt. As a consequence, the main issue is whether the proposal represents inappropriate development. Reasons 4. The National Planning Policy Framework (the Framework) confirms that the essential characteristics of Green Belts are their openness and their permanence. It also states that inappropriate development is, by definition, harmful to the Green Belt and should not be approved except in very special circumstances. However, Paragraph 145 of the Framework identifies exceptions Appeal Decision APP/B1930/D/20/3256258 2 to this, one of which includes the extension or alteration of a building provided that it does not result in disproportionate additions over and above the size of the original building. 5. Policy 13 of the City and District of St. Albans District Local Plan Review (1994) (LP) seeks to prevent extensions that would create a building of significantly larger or different character. The Residential Extensions and Replacement Dwellings in the Green Belt Supplementary Planning Guidance (2004) (SPG) seeks to expand on this with the overall aim to ensure that extensions do not have a detrimental effect on the openness of the Green Belt. The SPG establishes guidelines in relation to how extensions should be assessed, however, it also confirms that these are not rigid limits. 6. The SPG assesses extensions against matters including, type of extension, visibility from public viewpoints, gaps between buildings, design, landscaping, and heritage. Against these matters, the Council confirms that the proposal performs well. However, where it performs less successfully against the SPG is in relation to previous extensions and the cumulative effect of development. 7. The appeal site has been extended to the rear at ground floor level and to the side at two storey level. As a result of these extensions, the dwelling in its extended form exceeds the allowances suggested within the SPG. Accordingly, the proposal would result in a more significant breach. However, from a design perspective, the Council have confirmed that the proposal would be an appropriate addition to the dwelling. Although it would result in a small increase in footprint at ground floor level, the first-floor element would not project beyond the existing rear wing and the roof form and materials would ensure that the proposal would integrate well with the existing dwelling. It would therefore be a sympathetic addition and consequently, I have no reason to disagree with the Council in relation to the design and appearance of the proposal. 8. As identified above, a key characteristic of Green Belts is their openness. Due to the contained nature of the proposal and its successful integration with the existing building due to its suitable proportions, I am satisfied that the extension would not harm the openness of the Green Belt. Although the proposal would breach the guidance adopted by the Council, these are not rigid requirements, and nor should they be, in light of national policy. The proposal would represent a well-considered addition that would be sympathetic to the existing building. It would not be an imposing or dominant structure and although the size of the building would increase further, due to the sensitive design, it would not result in disproportionate additions over and above the size of the original dwelling. 9. I therefore conclude that the proposal would not represent inappropriate development within the Green Belt. Accordingly, it would comply with Policies 1 and 13 of the City and District of St. Albans District Local Plan Review (1994) as well as the Green Belt protection aims of the Framework. These seek to protect the Green Belt from inappropriate development. Conditions 10. In light of my findings set out above, conditions are necessary in the interests of precision and clarity to establish the time limit for commencing development as well as the approved drawing numbers. In addition, to secure the required Appeal Decision APP/B1930/D/20/3256258 3 integration with the existing dwelling, a condition is necessary to ensure that the materials used in the construction of the development match the existing building. Conclusion 11. For the reasons identified above, the appeal should be allowed, and planning permission be granted. Martin Chandler INSPECTOR
£ Costs decision section
Costs Decision Site visit made on 29 September 2020 by Martin Chandler BSc MA MRTPI an Inspector appointed by the Secretary of State Decision date: 16 October 2020 Costs application in relation to Appeal Ref: APP/B1930/D/20/3256258 105 Harper Lane, Shenley, Radlett WD7 9HG • The application is made under the Town and Country Planning Act 1990, sections 78, 322 and Schedule 6, and the Local Government Act 1972, section 250(5). • The application is made by Mr Arnold for a full award of costs against St Albans City & District Council. • The appeal was against the refusal of planning permission for a part single storey, part two storey rear extension. Decision 1. The application for an award of costs is refused. Reasons 2. The Planning Practice Guidance (PPG) advises that costs may be awarded against a party who has behaved unreasonably, and that the unreasonable behaviour has directly caused another party to incur unnecessary or wasted expense in the appeal process. Awards can be based on either procedural or substantive matters. 3. The appellant contends that the Council refused planning permission using guidance as a rigid limit and therefore did not make an assessment of the impact of the proposal. Moreover, it is suggested that this is indicative of a pattern of decision-making by the Council. 4. Although there is reliance on the specific guidelines, the Council have exercised its professional judgement in relation to the effect of the proposal, concluding that the development would result in a disproportionate addition. This decision has been articulated in an objective and proportionate manner and whilst I have concluded differently, I am satisfied that the Council have substantiated their decision within the evidence before me. As a consequence, a perceived pattern of decision-making becomes immaterial because I am content that the Council have discharged their duties in an appropriate manner. 5. Accordingly, I find that unreasonable behaviour resulting in unnecessary or wasted expense, as described in the PPG, has not been demonstrated. An award of costs is therefore not justified. Martin Chandler INSPECTOR
Expert Representation

Don't leave your appeal to chance.

Inspectors are inconsistent. We build a technical defense using precedents from our 182,000+ case archive.
No win, no fee Householder representation — you only pay if you win.

Get Free Review How it works →