Inspector’s Reasoning
Appeal Decision
Site visit made on 17 June 2020
by K Savage BA MPlan MRTPI
an Inspector appointed by the Secretary of State
Decision date: 29 June 2020
Appeal Ref: APP/K2420/W/20/3251699
Fairways Cottage, Leicester Road, Hinckley LE10 3DR
• The appeal is made under section 78 of the Town and Country Planning Act 1990
against a refusal to grant approval required under Schedule 2, Part 1, Class A of the
Town and Country Planning (General Permitted Development) (England) Order 2015
(the GPDO).
• The appeal is made by Ms Joanne Haddon against the decision of Hinckley & Bosworth
Borough Council.
• The application Ref 20/00041/HHGDO, dated 13 January 2020, was refused by notice
dated 6 March 2020.
• The development proposed is a rear extension.
Decision
1. The appeal is allowed and prior approval is deemed to be granted under the
provisions of Article 3(1) and Schedule 2, Part 1, Class A, Paragraph A.4. of the
Town and Country Planning (General Permitted Development) (England) Order
2015 (as amended) for a rear extension, at Fairways Cottage, Leicester Road,
Hinckley LE10 3DR, in accordance with the application Ref 20/00041/HHGDO
made on 13 January 2020, and the details submitted with it pursuant to Article
3(1) and Schedule 2, Part 1, Class A, paragraph A.4.(2).
Preliminary Matters
2. Revised plans were submitted during the course of the application which the
Council took into consideration and ultimately made its determination against.
3. The appellant’s statement concludes with a section titled ‘Award of Costs’, with
reference to the potential for an Inspector to initiate a costs award. However,
the information provided does not contain an explicit application for costs and
on the evidence before me, I do not intend to take this matter further.
Reasons
4. Paragraph A.1.(g) of Schedule 2, Part 1, Class A of the GPDO permits the
enlargement of a detached dwellinghouse by the erection of a single storey
extension that extends no more than 8m from the rear of the original
dwellinghouse, subject to the process of prior approval set out at Paragraph
A.4. being followed.
5. Paragraph A.4.(10)(c) provides that the development subject to the prior
approval process shall not begin before the expiry of 42 days following the date
on which the required prior approval information was received by the Council
without it notifying the developer as to whether prior approval is given or
Appeal Decision APP/K2420/W/20/3251699
2
refused. The appellant argues that the Council failed to notify her of its decision
within this statutory period.
6. The application was submitted on 13 January 2020, comprising an application
form, design and access statement and a number of plans, including a site
location plan and drawings of the proposed extension showing its external
dimensions. Having regard to the judgement of the Court of Appeal in Murrell1,
concerning the adequacy or otherwise of the content of a prior approval
application made under Class A and the validity of a subsequent determination,
I find that this information satisfied the requirements of Paragraph A.4.(2).
The Council confirms that it received this information on 15 January 2020.
Therefore, the 42 day statutory period to determine the application
commenced from that date and ended on 26 February 2020.
7. Upon receipt of the proposal, the Council raised concerns with the appellant
about inconsistences within the information and, after lengthy correspondence,
revised drawings were received on 27 January 2020, the date when the Council
‘validated’ the application and considered the statutory period to have
commenced. However, whilst the Council may seek further information from
the developer to enable it to determine the application, this must occur within
the 42 day period as the GPDO does not provide that the Council may delay the
commencement of the statutory determination period, or ‘stop the clock
running’ as expressed in Murrell, if the information provided at the outset has
met the basic requirements of Paragraph A.4.(2), which in this case it did.
8. However, the Council issued its notice of refusal on 6 March 2020, outside of
the statutory period. Therefore, prior approval is deemed to be granted on the
expiry of the statutory period on 26 February 2020. Consequently, it is not
open to me to consider the details submitted with the application and whether
the development would otherwise be permitted development under the GPDO.
9. However, this does not mean that carrying out the development would be
lawful. The development can only lawfully proceed if carried out in accordance
with the conditions and limitations imposed on the planning permission granted
by the GPDO. It is for the appellant to satisfy herself that the development
conforms with all relevant conditions and limitations of the GPDO. If it does
not, the GPDO does not grant it planning permission and the development, if
constructed, may be at risk of enforcement action by the Council.
K Savage
INSPECTOR
1 Murrell v SSCLG [2010] EWCA Civ 1367
Expert Representation
Don't leave your appeal to chance.
Inspectors are inconsistent. We build a technical defense using precedents from our 182,000+ case archive.
No win, no fee Householder representation — you only pay if you win.