Site visit made on 21 September 2020
by Jonathan Manning BSc (Hons) MA MRTPI
an Inspector appointed by the Secretary of State for Communities and Local Government
Decision date: 2nd October 2020
Appeal Ref: APP/V1260/D/20/3249092
166 Fairmile Road, Fairmile, Christchurch, BH23 2LW
• The appeal is made under section 78 of the Town and Country Planning Act 1990
against a refusal to grant planning permission.
• The appeal is made by Mr Charles Levey against the decision of Bournemouth
Christchurch and Poole Council.
• The application Ref 8/19/1444/HOU, dated 8 November 2019, was refused by notice
dated 5 February 2020.
• The development proposed is construction of additional driveway access across roadside
verge and provision of new dropped kerb at road edge to supplement existing driveway
and allow access/egress in forward gear.
Decision
1. The appeal is allowed and planning permission is granted for construction of
additional driveway access across roadside verge and provision of new dropped
kerb at road edge to supplement existing driveway and allow access/egress in
forward gear at 166 Fairmile Road, Fairmile, Christchurch, BH23 2LW, in
accordance with the terms of planning application ref: 8/19/1444/HOU, dated 8
November 2019, subject to the planning conditions in the attached schedule.
Main Issue
2. The main issue of the appeal is the effect of the proposal on the retention and
long-term viability of the protected oak tree.
Reasons
3. The appeal site is located along Fairmile Road and accommodates a detached
dwelling that is set back from the highway behind a grass verge. The appeal
dwelling is currently served by a tarmac driveway and there is a gravelled area
directly in front of the property providing parking. Within the appeal property’s
front parking/garden area there is a large oak tree that is protected by Tree
Preservation Order (TPO) No 32, dated 1982. I observed that the tree makes a
positive contribution to the character and appearance of the area.
4. The scheme would provide for an additional driveway and dropped kerb. It was
evident from my site visit that turning space within the front parking/garden
area is restricted by the oak tree and therefore vehicles may have to reverse
back onto the highway. The additional driveway would allow a one-way in and
one-way out arrangement, resulting in vehicles being able to exit the property
in a forward gear.
Appeal Decision APP/V1260/D/20/3249092
2
5. The majority of the proposed driveway would be located within the Root
Protection Area (RPA) of the oak tree. The Council has several concerns with
regard to the effect of the proposed development on the protected oak tree.
The reason for refusal can be split into three areas.
6. Firstly, it is suggested that the ground works that have already taken place
within the oak tree’s RPA, have reduced the favourable growing conditions of
the oak tree and any further ground works will put the tree under increased
pressure.
7. I understand from the appellant’s evidence that a previous application for a
tarmac driveway was refused on similar grounds. However, this scheme now
proposes to construct the additional driveway with grasscrete blocks rather
than tarmac. I am mindful that grasscrete ‘a no dig’ method is often used to
construct surface structures within RPAs to minimise any potential impacts on
tree roots. I accept the Council’s view that the RPA has already been affected
by the removal of the grassed area at the front of the house and through the
compaction of the grass verge. However, I consider that the proposed no-dig
and permeable method of construction would ensure that there would be no
unacceptable further impacts on the RPA of the tree and its long-term viability
would not be impacted any further than it already has been.
8. The Council’s officer report has questioned the long-term usability of grasscrete
blocks. However, the highway officer has not raised any similar concerns and
there is no evidence before me to suggest its use for this purpose is
unacceptable. Further, I see no reason why the driveways long-term usability
would not be maintained in a similar manner to that of a tarmac or paved
driveway by the appellant or their successor(s).
9. Secondly, the Council are of the view that there is the potential of root
damage, if appropriate measures are not implemented and supervised closely,
during the installation of the driveway. I am mindful that protection measures
and the supervision of the construction by an appropriately qualified
Aboriculturalist can be secured by a planning condition.
10. Thirdly, the Council has taken the view that the use of the drive could result in
requests to fell or severely prune the tree. It was clear from my site visit that
the canopy of the oak tree already overhangs the majority of the front
parking/garden area. I am not of the view that the additional driveway would
lead to any greater pressure for felling or pruning than currently already exists.
In addition, the Council has noted that the turning area around the base of the
tree will be tight and there will be pressure to further reduce the bank on which
the tree sits. However, I consider the scheme is more likely to reduce such
pressure, as vehicles would no longer seek to try and turn within the front
parking area, which is currently restricted by the bank on which the tree sits.
11. Given all of the above, I consider that the scheme would not affect the
retention or long-term viability of the protected oak tree. The scheme therefore
complies with Policies HE2 and HE3 of the Christchurch and East Dorset Local
Plan – Part 1 Core Strategy (2014).
Conclusion and Planning Conditions
12. For the reasons given above, and having regard to all other matters raised, I
consider that the scheme complies with the development plan when considered
Appeal Decision APP/V1260/D/20/3249092
3
as a whole and the appeal therefore succeeds, subject to necessary planning
conditions.
13. I have considered the Council’s suggested conditions against the tests set out
within the Framework and the advice provided by the Government’s Planning
Practice Guidance (the PPG) and have amended them where required. As well
as the standard time limit condition (1), I consider that a condition (2) is
necessary to ensure the development is undertaken in accordance with the
approved plans to secure certainty.
14. Conditions (3) and (4) are necessary to ensure that there would be no adverse
impacts on the protected oak tree. Given my findings above, I have amended
condition (3) to secure the supervision of the construction works by a suitably
qualified Aboriculturalist.
15. The Council has suggested in their questionnaire that a condition is needed to
secure matching materials. However, given the nature of the scheme and the
requirements of condition (3) I do not consider this necessary. Further, it has
been requested that an informative be included that would require the
appellant to liaise with the appropriate Council service unit with regards to the
works to create the access, including the creation of the dropped kerb access
and for final approval of the materials to be used on the adopted highway.
Whilst informatives are not attached to appeal decisions, I consider that such
details are necessary to make the development acceptable in planning terms
and I have therefore amended condition (3) to include them.
16. Condition (3) is a pre-commencement condition, I am satisfied that this is
necessary to make the development acceptable in planning terms and it would
have been otherwise necessary to refuse planning permission.
Jonathan Manning
INSPECTOR
Appeal Decision APP/V1260/D/20/3249092
4
Schedule of Planning Conditions
1) The development hereby permitted shall begin not later than three years
from the date of this decision.
2) The development hereby permitted shall be carried out in accordance with
the following approved plans: Site Plan Ref ‘4937 6.c’, dated March 2019
and Tree Protection Plan and Aboricultural Method Statement Ref ‘Plan TC1’,
dated November 2019.
3) Notwithstanding details already submitted within the above plans and
Arboricultural Method Statement, no development shall commence on site
until: the final design and specification of the driveway, including cross
sections showing the existing and proposed levels; dropped kerb; and the
details of a suitably qualified Arboriculturalist to oversee the construction
works has been submitted to and approved in writing by the Local Planning
Authority, in consultation with highways. The driveway shall then be
installed as per the approved documents.
4) Before any equipment, materials or machinery are brought onto the site, a
pre-commencement site meeting between the Tree Officer, Arboricultural
Consultant and Site Manager shall take place to confirm the methods of
protecting the oak tree during the development in accordance with the
Arboricultural Method Statement. The tree protection measures shall be
implemented as agreed before any equipment, materials or machinery are
brought onto the site for the purposes of the development. The tree
protection shall be retained until the development is complete and nothing
shall be placed within the fencing, nor shall any ground levels be altered or
excavations made without the written consent of the Local Planning
Authority.
Expert Representation
Don't leave your appeal to chance.
Inspectors are inconsistent. We build a technical defense using precedents from our 182,000+ case archive.
No win, no fee Householder representation — you only pay if you win.