Inspector’s Reasoning
Appeal Decision
Site visit made on 24 November 2020
by Benjamin Clarke BA (Hons.) MSc MRTPI
an Inspector appointed by the Secretary of State
Decision date: Thursday, 17 December 2020
Appeal Ref: APP/J1915/D/20/3248315
Bracken Hill, Queen Hoo Lane, Tewin AL6 0LT
• The appeal is made under section 78 of the Town and Country Planning Act 1990
against a refusal to grant planning permission.
• The appeal is made by Mr J. James against the decision of East Hertfordshire District
Council.
• The application Ref: 3/19/2498/HH, dated 6 December 2019, was refused by notice
dated 3 February 2020.
• The development proposed is a second storey extension above an existing single-storey
structure
Decision
1. The appeal is dismissed.
Main Issues
2. The main issues are:
• whether the proposal is inappropriate development for the purposes of the
National Planning Policy Framework (the Framework) and development plan
policy
• The effect of the development upon the openness of the Green Belt; and
• if the development is inappropriate, whether the harm by reason of
inappropriateness, and any other harm, would be clearly outweighed by other
considerations, so as to amount to the very special circumstances necessary to
justify the development.
Reasons
Whether inappropriate development
3. The appeal site consists of a dwelling that has been the subject of previous
extensions and is located within the Metropolitan Green Belt.
4. I have been directed towards Policy GBR1 of the East Hertfordshire District Plan
(2018) (the District Plan). This policy requires that developments be considered
in line with the requirements of the Framework.
5. Paragraph 145 of the Framework identifies the erection of new buildings within
the Green Belt as being inappropriate. There are some exceptions to this,
which include the erection of a proportionate extension of an existing building.
Appeal Decision APP/J1915/D/20/3248315
2
6. In this case, the original dwelling, as illustrated on the submitted plans,
consisted of a broadly rectangular shape, with a projection to the rear. The
dwelling has subsequently been extended through the provision of various
extensions at the sides of the building and to its rear. The dwelling also
features a canopy on one side and a front porch.
7. The proposed extension, whilst not projecting beyond the footprint of the
existing dwelling, in its current rather than original form, would increase the
size and massing of the building due to the creation of an additional storey at
first-floor level.
8. The proposed development would project beyond the rear elevation of the
original dwelling. This extension would be viewed alongside an existing rear
extension. In consequence, the multiple projections into the rear garden arising
from these extensions, through their size, would erode the original proportions
of the dwelling.
9. Furthermore, the front elevation of the proposed extension would be
constructed so as to finish flush with the front elevation of the original dwelling.
As the proposed extension would be constructed above an existing addition to
the house, the proposed development would result in a larger building.
10. Given that the proposed extension would result in the formation of a bulkier
dwelling, it would be disproportionate as the existing side extension would be
significantly increased in height from a single storey to being of two storeys. In
conjunction with the additional existing extensions on the opposite side of the
building, this would result in a notably longer dwelling than the original.
11. I have been directed towards a range of figures regarding the percentage
increase in the size of the building. However, even if I were to agree with the
lower figure, the proposed extension would still represent a significant increase
in the size, mass and volume of the building in conjunction with other existing
extensions. This means that the proposed development would be a
disproportionate addition to the building.
12. In addition, the Framework references that, in assessing such proposals, the
judgement that should be made as to whether an extension is disproportionate
is an objective one. For the preceding reasons, I have found that the
cumulative effects of the proposed and existing extensions would be a
disproportionate addition to the dwelling.
13. There is some landscaping present within the appeal site and the surrounding
area. However, the Framework is clear that extensions to dwellings within the
Green Belt should be constructed from proportions that are consistent with the
original dwelling. In result, given that I have found that the proposed
development would be a disproportionate addition, the presence of landscaping
would not alleviate this matter.
14. My attention has been drawn to several other dwellings in the surrounding area
that have been extended. However, houses within the vicinity of the appeal site
are constructed to different designs and proportions. In consequence, whether
a specific extension is disproportionate would depend on its individual design
and siting. In result, the presence of developments elsewhere does not allow
me to forego my previous concerns.
Appeal Decision APP/J1915/D/20/3248315
3
15. I therefore conclude that the proposed development would fail to comply with
the requirements of District Plan Policy GBR1 and the Framework owing to the
inappropriate form of development.
Effect on openness
16. The appeal site is within the Green Belt and in result the appeal site, and the
surrounding area benefits from an intrinsic level of openness.
17. By reason of the pattern of development in the vicinity, the extension would be
visible, in parts, from the adjacent road. This would be exacerbated by the
relatively flat nature of the front garden of the site meaning that the increase
in built form would be readily apparent. Whilst some landscaping is present at
the appeal site, this would not screen the extension from all vantage points,
such as the site’s driveway. In result the proposed development would lead to
an erosion of the physical character of openness that is a feature of the
locality.
18. The proposed development would increase the size and massing of the
dwelling. In addition, the original dwelling would have featured larger amounts
of space between the side elevations and side boundaries. This would have
allowed for the retention of a more open, less developed character that is
commensurate with the site’s surroundings.
19. In result, the proposed development would create an adverse effect upon the
spatial sense of openness that is an intrinsic feature of the Green Belt. This is
particularly notable as the proposed extension would be of a height consistent
with the original dwelling and, in conjunction with other extensions, would
result in a dwelling with a more bulky character
20. I therefore conclude that the proposed development would have an adverse
effect upon the openness of the Green Belt. Within this regard, the
development would conflict with District Plan Policy GBR1 and the Framework.
Amongst other matters, these seek to ensure the retention of an open
character within the Green Belt.
Other considerations
21. The development would deliver a dwelling that might accommodate a larger
household in a modernised building. However, the benefits of this are limited
due to the nature of the development. Furthermore, any benefits to the local
economy would also be relatively small owing to the quantum of development
and would also be relatively localised in impact. Accordingly, I can only give
each of these matters a limited amount of weight.
22. My attention has been drawn to potential alternative extensions that could be
constructed at the property. Whilst I understand that these might result in a
greater level of floor space being added to the building, a number of these
extensions would be at ground floor level only. In consequence, the side
elevations of the original dwelling would remain readily perceptible, particularly
at first floor level. Accordingly, these would not be the equivalent of the
disproportionate extension before me.
23. Whilst an alternative extension might result in an increase in the height of the
dwelling, a development of the type illustrated would be the subject of a prior
approval process. The evidence before me is not indicative of such prior
Appeal Decision APP/J1915/D/20/3248315
4
approval being sought, or indeed granted. In consequence, I do not have
certainty that in the event of this appeal being dismissed, there is a realistic
prospect of the alternative proposal being implemented.
24. For these reasons, I am therefore unable to give the presence of potential
alternative developments a significant amount of weight in my considerations.
Other Matter
25. I acknowledge concerns raised by the appellant regarding the provision of
pre-application advice by the Council. However, in considering this appeal, I
have limited my considerations to the planning matters before me.
Planning Balance and Conclusion
26. The Framework indicates that inappropriate development is, by definition,
harmful to the Green Belt and should not be approved except in very special
circumstances. Substantial weight should be given to this harm. Very special
circumstances will not exist unless the harm to the Green Belt is clearly
outweighed by other considerations.
27. As explained above, I give only limited weight to each of the considerations
cited in support of the proposal and accordingly I do not find that these amount
to the special circumstances necessary to justify the development.
28. In consequence, and for the preceding reasons, I conclude that the appeal
should be dismissed.
Benjamin Clarke
INSPECTOR
Expert Representation
Don't leave your appeal to chance.
Inspectors are inconsistent. We build a technical defense using precedents from our 182,000+ case archive.
No win, no fee Householder representation — you only pay if you win.