← Back to Archive

Portal frame shed, the construction of a bound concrete hardstanding, and the provision of a hard surface with compacted plainings (“the Operations”); and, on completion of those “Operations”, the change of use on the land to a use for the purposes of keeping, maintaining, repairing and restoring machinery, vehicles and trailers (“the Use”)

📊

Borough Success Rate

In Staffordshire Moorlands District Council, approx 32.6% of Change of use appeals are successful. (Sample: 43 cases).

Planzo Professional Representation

Technical Appeal Representation

This Change of use case requires a bespoke technical strategy. Contact us for a fixed-fee quotation.

Book Free Review How it works →

Technical Issues Heatmap

Green Belt Character and Appearance Privacy
Keyword Heatmap Locked

Instant scan of technical battlegrounds available with a Day Pass.

Inspector Profile: Phillips A

Archive Data: 64 Decisions
Allowance Rate (Change of use)
26.6% ↓ Strict
National Average (Change of use)
32.5%

Inspector's Analysis

https://www.gov.uk/planning-inspectorate Appeal Decision Inquiry Held on 1 November 2022 Site visit made on 2 November 2022 by A A Phillips BA(Hons) DipTP MTP MRTPI AssocIHBC an Inspector appointed by the Secretary of State Decision date: 12 January 2023 Appeal Ref: APP/B3438/C/20/3244823 The unit of occupied land to the rear of Fox’s Croft, Ankors Lane, Thorncliffe ST13 7LP • …

Full Analysis Locked

Unlock full text, site maps, and the evidence-ready PDF.

Unlock Case (£10)