Appeal Decision
Site visit made on 19 December 2017
by Timothy C King BA(Hons) MRTPI
an Inspector appointed by the Secretary of State for Communities and Local Government
Decision date: 08 January 2018
Appeal Ref: APP/K3605/D/17/3184109
2 Cedar Cottages, Lammas Lane, Esher, Surrey KT10 8PF
The appeal is made under section 78 of the Town and Country Planning Act 1990
against a refusal to grant planning permission.
The appeal is made by Mr John Chadwick against the decision of Elmbridge Borough
Council.
The application Ref 2017/1399, dated 3 May 2017, was refused by notice dated
5 July 2017.
The development proposed is described as ‘2 storey extension.’
Decision
1. The appeal is dismissed.
Main Issues
2. The site lies within the Metropolitan Green Belt, and the main issues in this
appeal are:
i) whether the proposal would be inappropriate development in the Green Belt
for the purposes of the National Planning Policy Framework;
ii) the effect on the openness of the Green Belt; and
iii)if it is inappropriate development, whether the harm by reason of
inappropriateness and by reason of any other harm is clearly outweighed by
other considerations so as to amount to the very special circumstances
necessary to justify the development.
Reasons
Inappropriate development
3. The National Planning Policy Framework (the Framework), issued in 2012,
indicates that the construction of new buildings should be regarded as
inappropriate development in the Green Belt. Such development is, by
definition, harmful to the Green Belt and should not be approved except in very
special circumstances.
4. There are some exceptions to this, as set out in paragraph 89 of the
Framework. This includes the extension or alteration of a building provided
that it does not result in disproportionate additions over and above the size of
the original building.
Appeal Decision APP/K3605/D/17/3184109
2
5. The Framework provides no clear guidance over what may, or may not,
amount to disproportionate additions. However, Policy DM18 of the Elmbridge
Local Plan Development Management Plan (LP), adopted in 2015 indicates that
extensions or alterations to a building will be acceptable providing it does not
result in an increase on the original dwelling of beyond 25% in volume and
25% in footprint.
6. In this particular instance the building has already been extended by a single
storey addition and a conservatory. The intention is to reduce the resultant
cumulative increase by removing the existing conservatory yet it appears from
the Council’s case report that it has erroneously included this addition in its
calculations. Nonetheless, from the submitted plans I still estimate that the
proposal would involve an increased footprint of approximately 76%. Further,
whilst the Council’s estimated volume increase of some 78% would reduce as a
consequence it would not be to such an extent as to be considered of
significance for this particular calculation.
7. Section 38(6) of the Planning and Compulsory Purchase Act 2004 requires that
if regard is to be had to the Development Plan for the purpose of any
determination to be made under the planning Acts the determination must be
made in accordance with the plan unless material considerations indicate
otherwise. In this instance the plan is relatively recent and I give full weight to
its policies. With reference to its Policy DM18, the 25% threshold in terms of
both footprint and volume would be greatly exceeded.
8. The increase on both counts would be significant and I conclude that the
proposal would represent a disproportionate addition to the original building
contrary to paragraph 89 of the Framework and also LP Policy DM18. It would
therefore be inappropriate development which, harmful to the Green Belt,
carries substantial weight.
Effect on the openness of the Green Belt
9. The Framework states that an essential characteristic of Green Belts is their
openness and that the fundamental aim of Green Belt policy is to prevent
urban sprawl by keeping land within them permanently open.
10. Notwithstanding the intended removal of the existing conservatory the
proposed two storey extension, to a depth of some 4m, would involve a
material encroachment and consequential impact upon the openness of the
Green Belt.
11. Accordingly, I conclude that the proposed dwelling would be harmful to the
Green Belt’s openness, thereby conflicting with relevant advice within the
Framework.
Other matters
12. The Council has not identified any other harm arising from the proposal and I
agree with this approach.
13. The appellant has set down certain points which, he considers, weigh in favour
of the proposal. As mentioned, however, the issue is with the cumulative
increase over the size of the original dwelling and is not merely confined to the
proposal in hand. Both the Framework and LP Policy DM18 clearly state as
such.
Appeal Decision APP/K3605/D/17/3184109
3
14. As regards the appellant exercising his permitted development entitlement,
whilst this represents a potential fallback position, such rights are subject to
certain dimensional restrictions. These would clearly dictate the design of any
proposed extension yet I have not been presented with any alternative scheme
to this end and no comparisons can thereby be drawn.
15. I have also had regard to the appellant’s personal circumstances and the
expressed need for additional floorspace. However, whilst I have afforded this
some weight it is not so compelling as to outweigh the harm that I have
identified would result.
Very special circumstances
16. The Framework indicates that substantial weight is given to any harm to the
Green Belt. Very special circumstances will not exist unless the potential harm
to the Green Belt by reason of inappropriateness, and any other harm, is
clearly outweighed by other considerations.
17. I find that the other considerations in this case do not outweigh the harm that I
have identified. Consequently, the very special circumstances necessary to
justify the development do not exist.
Conclusion
18. I have found harm on the two main issues, which are the determining factors
in this appeal. For the above reasons, and having had regard to all matters
raised, the appeal does not succeed.
Timothy C King
INSPECTOR
Expert Representation
Don't leave your appeal to chance.
Inspectors are inconsistent. We build a technical defense using precedents from our 182,000+ case archive.
No win, no fee Householder representation — you only pay if you win.