Breach of planning control as alleged in the notice is, on 12th May 1997, planning permission was granted for replacement of the original timber framed sash windows and a small number of existing casement windows with timber framed, double-glazed replacements (97/00179/FUL). The permission was implemented and the permitted windows remained in place until their removal in May 2014. Condition 3 of the 1997 permission is as follows:

📊

See the success rate & inspector analytics

Free to view — just create an account, no payment needed.

Sign Up Free

Technical Issues Heatmap

Green Belt Character and Appearance
Keyword Heatmap Locked

Inspector’s Reasoning

Appeal Decision Site visit made on 7 August 2018 by Paul Freer BA (Hons) LLM PhD MRTPI an Inspector appointed by the Secretary of State Decision date: 30 August 2018 Appeal Ref: APP/P1750/C/17/3183029 Land at 14 Church Circle, Farnborough GU14 6QH  The appeal is made under section 174 of the Town and Country Planning Act 1990 as amended b

Full Analysis Locked

Unlock full text, site maps, and the evidence-ready PDF.

Upgrade to Pro
Expert Representation

Don't leave your appeal to chance.

Inspectors are inconsistent. We build a technical defense using precedents from our 182,000+ case archive.
No win, no fee Householder representation — you only pay if you win.

Get Free Review How it works →